首页 | 本学科首页   官方微博 | 高级检索  
相似文献
 共查询到20条相似文献,搜索用时 156 毫秒
1.
Beavers, primarily through the building of dams, can deliver significant geomorphic modifications and result in changes to nutrient and sediment fluxes. Research is required to understand the implications and possible benefits of widespread beaver reintroduction across Europe. This study surveyed sediment depth, extent and carbon/nitrogen content in a sequence of beaver pond and dam structures in South West England, where a pair of Eurasian beavers (Castor fiber) were introduced to a controlled 1.8 ha site in 2011. Results showed that the 13 beaver ponds subsequently created hold a total of 101.53 ± 16.24 t of sediment, equating to a normalised average of 71.40 ± 39.65 kg m2. The ponds also hold 15.90 ± 2.50 t of carbon and 0.91 ± 0.15 t of nitrogen within the accumulated pond sediment. The size of beaver pond appeared to be the main control over sediment storage, with larger ponds holding a greater mass of sediment per unit area. Furthermore, position within the site appeared to play a role with the upper‐middle ponds, nearest to the intensively‐farmed headwaters of the catchment, holding a greater amount of sediment. Carbon and nitrogen concentrations in ponds showed no clear trends, but were significantly higher than in stream bed sediment upstream of the site. We estimate that >70% of sediment in the ponds is sourced from the intensively managed grassland catchment upstream, with the remainder from in situ redistribution by beaver activity. While further research is required into the long‐term storage and nutrient cycling within beaver ponds, results indicate that beaver ponds may help to mitigate the negative off‐site impacts of accelerated soil erosion and diffuse pollution from agriculturally dominated landscapes such as the intensively managed grassland in this study. © 2018 The Authors. Earth Surface Processes and Landforms published by John Wiley & Sons Ltd.  相似文献   

2.
Stream ecosystems can be dramatically altered by dam-building activities of North American beaver (Castor canadensis). The extent to which beavers’ ecosystem engineering alters riverscapes is driven by the density, longevity, and size (i.e. height and length) of the dams constructed. In comparison to the relative ubiquity of beaver dams on the landscape, there is a scarcity of data describing dam heights. We collected data describing dam height and dam condition (i.e. damaged or intact) of 500 beaver dams via rapid field survey, differentiating between primary and secondary dams and associating each dam with a beaver dam complex. With these data, we examined the influence of beaver dam type (primary/secondary), drainage area, streamflow, stream power, valley bottom width, and HUC12 watershed on beaver dam height with linear regression and the probability that a beaver dam was damaged with logistic regression. On average, primary dams were 0.46 m taller than secondary dams; 15% of observed dams were primary and 85% secondary. Dam type accounted for 21% of dam height variation (p <0.0001). Slope (p = 0.0107), discharge (p = 0.0029), and drainage area (p = 0.0399) also affected dam height, but each accounted for less than 3% of dam height variation. The average number of dams in a dam complex was 6.1 (SD ± 4.5) and ranged from 1 to 21. The watershed a beaver dam was located in accounted for the most variability (17.8%) in the probability that a beaver dam was damaged, which was greater than the variability explained by any multiple logistic regression model. These results indicate that temporally dynamic variables are important influencers of dam longevity and that beaver dam ecology is a primary factor influencing beaver dam height. © 2020 John Wiley & Sons, Ltd.  相似文献   

3.
Large wood along rivers influences entrainment, transport, and storage of mineral sediment and particulate organic matter. We review how wood alters sediment dynamics and explore patterns among volumes of in‐stream wood, sediment storage, and residual pools for dispersed pieces of wood, logjams, and beaver dams. We hypothesized that: volume of sediment per unit area of channel stored in association with wood is inversely proportional to drainage area; the form of sediment storage changes downstream; sediment storage correlates with wood load; the residual volume of pools created in association with wood correlates inversely with drainage area; and volume of sediment stored behind beaver dams correlates with pond area. Lack of data from larger drainage areas limits tests of these hypotheses, but the analyses suggest that sediment volume correlates positively with drainage area and wood volume. The form of sediment storage in relation to wood appears to change downstream, with wedges of sediment upstream from jammed steps most prevalent in small, steep channels and more dispersed sediment storage in lower gradient channels. Pool volume correlates positively with wood volume and negatively with channel gradient. Sediment volume correlates well with beaver pond area. More abundant in‐stream wood and beaver populations present historically equated to greater sediment storage within river corridors and greater residual pool volume. One implication of these changes is that protecting and re‐introducing wood and beavers can be used to restore rivers. This review of the existing literature on wood and sediment dynamics highlights the lack of studies on larger rivers. Copyright © 2016 John Wiley & Sons, Ltd.  相似文献   

4.
Beavers can profoundly alter riparian environments, most conspicuously by creating dams and wetlands. Eurasian beaver (Castor fiber) populations are increasing and it has been suggested they could play a role in the provision of multiple ecosystem services, including natural flood management. Research at different scales, in contrasting ecosystems is required to establish to what extent beavers can impact on flood regimes. Therefore, this study determines whether flow regimes and flow responses to storm events were altered following the building of beaver dams and whether a flow attenuation effect could be significantly attributed to beaver activity. Four sites were monitored where beavers have been reintroduced in England. Continuous monitoring of hydrology, before and after beaver impacts, was undertaken on streams where beavers built sequences of dams. Stream orders ranged from 2nd to 4th, in both agricultural and forest-dominated catchments. Analysis of >1000 storm events, across four sites showed an overall trend of reduced total stormflow, increased peak rainfall to peak flow lag times and reduced peak flows, all suggesting flow attenuation, following beaver impacts. Additionally, reduced high flow to low flow ratios indicated that flow regimes were overall becoming less “flashy” following beaver reintroduction. Statistical analysis, showed the effect of beaver to be statistically significant in reducing peak flows with estimated overall reductions in peak flows from −0.359 to −0.065 m3 s−1 across sites. Analysis showed spatial and temporal variability in the hydrological response to beaver between sites, depending on the level of impact and seasonality. Critically, the effect of beavers in reducing peak flows persists for the largest storms monitored, showing that even in wet conditions, beaver dams can attenuate average flood flows by up to ca. 60%. This research indicates that beavers could play a role in delivering natural flood management.  相似文献   

5.
Dam construction in the 1960s to 1980s significantly modified sediment supply from the Kenyan uplands to the lower Tana River. To assess the effect on suspended sediment fluxes of the Tana River, we monitored the sediment load at high temporal resolution for 1 year and complemented our data with historical information. The relationship between sediment concentration and water discharge was complex: at the onset of the wet season, discharge peaks resulted in high sediment concentrations and counterclockwise hysteresis, while towards the end of the wet season, a sediment exhaustion effect led to low concentrations despite the high discharge. The total sediment flux at Garissa (c. 250 km downstream of the lowermost dam) between June 2012 and June 2013 was 8.8 Mt yr‐1. Comparison of current with historical fluxes indicated that dam construction had not greatly affected the annual sediment flux. We suggest that autogenic processes, namely river bed dynamics and bank erosion, mobilized large quantities of sediments stored in the alluvial plain downstream of the dams. Observations supporting the importance of autogenic processes included the absence of measurable activities of the fall‐out radionuclides 7Be and 137Cs in the suspended sediment, the rapid lateral migration of the river course, and the seasonal changes in river cross‐section. Given the large stock of sediment in the alluvial valley of the Tana River, it may take centuries before the effect of damming shows up as a quantitative reduction in the sediment flux at Garissa. Many models relate the sediment load of rivers to catchment characteristics, thereby implicitly assuming that alterations in the catchment induce changes in the sediment load. Our research confirms that the response of an alluvial river to external disturbances such as land use or climate change is often indirect or non‐existent as autogenic processes overwhelm the changes in the input signal. Copyright © 2015 John Wiley & Sons, Ltd.  相似文献   

6.
We evaluate the validity of the beaver‐meadow complex hypothesis, used to explain the deposition of extensive fine sediment in broad, low‐gradient valleys. Previous work establishes that beaver damming forms wet meadows with multi‐thread channels and enhanced sediment storage, but the long‐term geomorphic effects of beaver are unclear. We focus on two low‐gradient broad valleys, Beaver Meadows and Moraine Park, in Rocky Mountain National Park (Colorado, USA). Both valleys experienced a dramatic decrease in beaver population in the past century and provide an ideal setting for determining whether contemporary geomorphic conditions and sedimentation are within the historical range of variability of valley bottom processes. We examine the geomorphic significance of beaver‐pond sediment by determining the rates and types of sedimentation since the middle Holocene and the role of beaver in driving floodplain evolution through increased channel complexity and fine sediment deposition. Sediment analyses from cores and cutbanks indicate that 33–50% of the alluvial sediment in Beaver Meadows is ponded and 28–40% was deposited in‐channel; in Moraine Park 32–41% is ponded sediment and 40–52% was deposited in‐channel. Radiocarbon ages spanning 4300 years indicate long‐term aggradation rates of ~0.05 cm yr‐1. The observed highly variable short‐term rates indicate temporal heterogeneity in aggradation, which in turn reflects spatial heterogeneity in processes at any point in time. Channel complexity increases directly downstream of beaver dams. The increased complexity forms a positive feedback for beaver‐induced sedimentation; the multi‐thread channel increases potential channel length for further damming, which increases the potential area occupied by beaver ponds and the volume of fine sediment trapped. Channel complexity decreased significantly as surveyed beaver population decreased. Beaver Meadows and Moraine Park represent settings where beaver substantially influence post‐glacial floodplain aggradation. These findings underscore the importance of understanding the historical range of variability of valley bottom processes, and implications for environmental restoration. Copyright © 2011 John Wiley & Sons, Ltd.  相似文献   

7.
It is becoming increasingly popular to reintroduce beaver to streams with the hopes of restoring riparian ecosystem function or reducing some of the hydrological impacts of climate change. One of the risks of relying on beaver to enhance ecosystem water storage is that their dams are reportedly more apt to fail during floods which can exacerbate flood severity. Missing are observations of beaver dam persistence and water storage capacity during floods, information needed to evaluate the risk of relying on beaver as a nature-based flood solution. A June rainstorm in 2013 triggered the largest recorded flood in the Canadian Rocky Mountains west of Calgary, Alberta. We opportunistically recorded hydrometric data during the rainfall event at a beaver-occupied peatland that has been studied for more than a decade. We supplemented these observations with a post-event regional analysis of beaver dam persistence. Results do not support two long-held hypotheses—that beaver ponds have limited flood attenuation capacity and commonly fail during large flood events. Instead we found that 68% of the beaver dam cascade systems across the region were intact or partially intact after the event. Pond fullness, in addition to the magnitude of the water-sediment surge, emerged as important factors in determining the structural fate of dam cascade sequences. Beaver ponds at the instrumented site quickly filled in the first few hours of the rain event and levels were dynamic during the event. Water storage offered by the beaver ponds, even ones that failed, delayed downstream floodwater transmission. Study findings have important implications for reintroducing beaver as part of nature-based restoration and climate change adaptation strategies.  相似文献   

8.
The hydrology and nitrogen biogeochemistry of a riparian zone were compared before and after the construction of beaver dams along an agricultural stream in southern Ontario, Canada. The beaver dams increased surface flooding and raised the riparian water table by up to 1·0 m. Increased hydraulic gradients inland from the stream limited the entry of oxic nitrate‐rich subsurface water from adjacent cropland. Permeable riparian sediments overlying dense till remained saturated during the summer and autumn months, whereas before dam construction a large area of the riparian zone was unsaturated in these seasons each year. Beaver dam construction produced significant changes in riparian groundwater chemistry. Median dissolved oxygen concentrations were lower in riparian groundwater after dam construction (0·9–2·1 mg L?1) than in the pre‐dam period (2·3–3·9 mg L?1). Median NO3‐N concentrations in autumn and spring were also lower in the post‐dam (0·03–0·07 mg L?1) versus the pre‐dam period (0·1–0·3 mg L?1). In contrast, median NH4‐N concentrations in autumn and spring months were higher after dam construction (0·3–0·4 mg L?1) than before construction (0·13–0·14 mg L?1). Results suggest that beaver dams can increase stream inflow to riparian areas that limit water table declines and increase depths of saturated riparian soils which become more anaerobic. These changes in subsurface hydrology and chemistry have the potential to affect the transport and transformation of nitrate fluxes from adjacent cropland in agricultural landscapes. Copyright © 2009 John Wiley & Sons, Ltd.  相似文献   

9.
The rate of sedimentation in Lake Kinneret was measured over several years by means of sediment traps, in up to seven different locations in the lake. Gross sedimentation rates measured in the sediment traps vary from about 1·5 kg m−2 a−1 in the deepest part of the lake up to 10 kg m−2 a−1 near the mouth of the upper Jordan river. The rate of sedimentation near the Jordan's inflow is highly correlated to flow discharge in the river, while in the centre of the lake the seasonal sedimentation pattern is mainly correlated to the bloom period of Peridinium gatunense. During the bloom period of Peridinium gatunense sedimentation rates all over the lake are very similar, indicating that the Peridinium is evenly distributed in the lake. The average suspended sediment discharge of the upper Jordan river flowing into the lake is 41 000 ton a−1.Copyright © 2000 John Wiley & Sons, Ltd.  相似文献   

10.
To maintain a reasonable sediment regulation system in the middle reaches of the Yellow River, it is critical to determine the variation in sediment deposition behind check‐dams for different soil erosion conditions. Sediment samples were collected by using a drilling machine in the Fangta watershed of the loess hilly–gully region and the Manhonggou watershed of the weathered sandstone hilly–gully (pisha) region. On the basis of the check‐dam capacity curves, the soil bulk densities and the couplet thickness in these two small watersheds, the sediment yields were deduced at the watershed scale. The annual average sediment deposition rate in the Manhonggou watershed (702.0 mm/(km2·a)) from 1976 to 2009 was much higher than that in the Fangta watershed (171.6 mm/(km2·a)) from 1975 to 2013. The soil particle size distributions in these two small watersheds were generally centred on the silt and sand fractions, which were 42.4% and 50.7% in the Fangta watershed and 60.6% and 32.9% in the Manhonggou watershed, respectively. The annual sediment deposition yield exhibited a decreasing trend; the transition years were 1991 in the Fangta watershed and 1996 in the Manhonggou watershed (P < 0.05). In contrast, the annual average sediment deposition yield was much higher in the Manhonggou watershed (14011.1 t/(km2·a)) than in the Fangta watershed (3149.6 t/(km2·a)). In addition, the rainfalls that induced sediment deposition at the check‐dams were greater than 30 mm in the Fangta watershed and 20 mm in the Manhonggou watershed. The rainfall was not the main reason for the difference in the sediment yield between the two small watersheds. The conversion of farmland to forestland or grassland was the main reason for the decrease in the soil erosion in the Fangta watershed, while the weathered sandstone and bare land were the main factors driving the high sediment yield in the Manhonggou watershed. Knowledge of the sediment deposition process of check‐dams and the variation in the catchment sediment yield under different soil erosion conditions can serve as a basis for the implementation of improved soil erosion and sediment control strategies, particularly in semi‐arid hilly–gully regions. Copyright © 2018 John Wiley & Sons, Ltd.  相似文献   

11.
Sediment samples were collected from three seawater aquaculture ponds, and soil characteristics, sediment oxygen consumption (SOC), dissolved organic carbon (DOC) and nutrient fluxes were measured using chamber incubations at laboratory. The three ponds were each representing a specific monoculture or polyculture model of sea cucumber. Total organic carbon (TOC) and total nitrogen (TN) contents in the dry sediment ranged from 0.14 to 0.26% and 0.022 to 0.037%, respectively. Total phosphorus (TP) contents in the sediment were more spatially and temporally variable. SOC ranged from 15.29 to 45.86 mmol m–2 d–1 and showed significant differences among the three ponds (p < 0.05). TOC, total carbon (TC) contents, and SOC of the sediment in the pond polycultured with jellyfish increased with culture time, indicating that jellyfish farming enhanced the accumulation of organic matter in the sediments to some extent. Sediment showed net nitrate and ammonium uptake in most ponds and months, and significant differences were found among months (p < 0.05). Dissolved inorganic phosphate (DIP) was released from the sediments in all ponds with low flux rates. DOC was released from the sediment in all ponds and ranged from 0.67 to 1.74 g DOC m–2 d–1. The results suggested that non‐artificial‐feeding sea cucumber culture ponds could not only yield valuable seafood products, but also effectively remove nutrients from the aquaculture systems and consequently alleviate nutrient loadings of the nearby coast.  相似文献   

12.
Restoration projects in the United States typically have among the stated goals those of increasing channel stability and sediment storage within the reach. Increased interest in ecologically based restoration techniques has led to the consideration of introducing beavers to degraded channels with the hope that the construction of beaver dams will aggrade the channel. Most research on beaver dam modification to channels has focused on the long‐term effects of beavers on the landscape with data primarily from rivers in the western United States. This study illustrated that a role exists for beavers in the restoration of fine‐grained, low gradient channels. A channel on the Atlantic Coastal Plain was analyzed before, during, and after beaver dams were constructed to evaluate the lasting impact of the beaver on channel morphology. The channel was actively evolving in a former reservoir area upstream of a dam break. Colonization by the beaver focused the flow into the channel, allowed for deposition along the channel banks, and reduced the channel width such that when the beaver dams were destroyed in a flood, there was no channel migration and net sediment storage in the reach had increased. However, the majority of the deposition occurred at the channel banks, narrowing the channel width, while the channel incised between sequential beaver dams. The study indicated that where channels are unstable laterally and bank erosion is a concern, the introduction of beavers can be a useful restoration tool. However, because of the likelihood of increased channel bed erosion in a reach with multiple beaver dams, they may not be the best solution where aggradation of an incised channel bed is the desired result. Copyright © 2014 John Wiley & Sons, Ltd.  相似文献   

13.
Abstract

Reservoir silting is one of the principal problems affecting the performance of dams in Algeria from the standpoint of reservoir capacity for storage. Foum El Kherza Reservoir (also known as Foum El Gherza), near Biskra Town, Algeria, is subject to dredging operations with the intent of recovering 70% of its initial storage capacity of 47 hm3 (million cubic metres). The forecasting of sediment volume trapped in the reservoir is essential to plan the future use of this resource and to sustain irrigation for the palm groves characteristic of the region. However, there are currently no sediment data, nor a sediment rating curve, for predicting sediment inflow based on hydrological data. This paper describes the optimization of a cumulative trapped sediment curve for Foum El Kherza Reservoir based on 44 years of daily inflows, by using a spreadsheet optimization tool, Microsoft Excel® Solver to calibrate the cumulative sediment load against the cumulative sediment inflow as documented by eight bathymetric surveys since the dam construction.

Editor D. Koutsoyiannis; Associate editor A. Montanari

Citation Tebbi, F.Z., Dridi, H., and Morris, G.L., 2012. Optimization of cumulative trapped sediment curve for an arid zone reservoir: Foum El Kherza (Biskra, Algeria). Hydrological Sciences Journal, 57 (7), 1368–1377.  相似文献   

14.
Dam construction greatly alters the channel boundary of rivers, making the dammed river system a human‐controlled system. Based on hydrometric data in the upper Changjiang River basin, the change in behaviour of sediment transport of some dammed rivers was studied. As a result, some phenomena of threshold and complex response were found. When the coefficient (Cr,a) of actual runoff regulation by reservoirs, defined as the ratio of total capacity of reservoirs to annual runoff input, is smaller than 10%, suspended sediment load at Yichang station, the control station of the Changjiang River, shows a mild decreasing trend. When this coefficient becomes larger than 10%, suspended sediment load decreases sharply. The coefficient of 10% can be regarded as a threshold. The Cr,a of 10% is also a threshold, when the variation of suspended sediment concentration (SSC) with Cr,a at Yichang station is considered. The impacts of reservoir construction can be divided into several stages, including road construction, dam building and closure, water storage and sediment trapping. During these stages, some complex response was identified. At the station below the dam, SSC increases and reaches a maximum, and then declines sharply. This phenomenon was found on the main‐stem and several major tributaries of the upper Changjiang River. In the Minjiang River, where a series of dams were built successively, the response of SSC is more complicated. Copyright © 2010 John Wiley & Sons, Ltd.  相似文献   

15.
The transfer of sediment through a highly regulated large fluvial system (lower Ebro River) was analysed during two consecutive floods by means of sediment sampling. Suspended sediment and bedload transport were measured upstream and downstream of large reservoirs. The dams substantially altered flood timing, particularly the peaks, which were advanced downstream from the dams for flood control purposes. The suspended sediment yield upstream from the dams was 1 700 000 tonnes, which represented nearly 99 per cent of the total solid yield. The mean concentrations were close to 0·5 g l?1. The sediment yield downstream from the dams was an order of magnitude lower (173 000 tonnes), showing a mean concentration of 0·05 g l?1. The dams captured up to 95 per cent of the fine sediment carried in suspension in the river channel, preventing it from reaching the lowermost reaches of the river and the delta plain. Total bedload transport upstream from the dams was estimated to be about 25 000 tonnes, only 1·5 per cent of the total load. The median bedload rate was 100 gms?1. Below the dams, the river carried 178 000 tonnes, around 51 per cent of the total load, at a mean rate of 250 g ms?1. The results of sediment transport upstream and downstream from the large dams illustrate the magnitude of the sediment deficit in the lower Ebro River. The river mobilized a total of 350 000 tonnes in the downstream reaches, which were not replaced by sediment from upstream. Therefore, sediment was necessarily entrained from the riverbed and channel banks, causing a mean incision of 33 mm over the 27 km long study reach, altogether a significant step towards the long‐term degradation of the lower Ebro River. Copyright © 2005 John Wiley & Sons, Ltd.  相似文献   

16.
A numerical model (sediment trap efficiency for small ponds—STEP) is developed to simulate sediment deposition in small ponds (i.e. <1 ha) and to calculate the sediment trap efficiency (STE). The algorithms are kept simple to allow the model to simulate larger time periods (i.e. several years). Eight runs with an experimental pond were executed to test the model. The STEP model produces reasonable predictions of STE as well as the shape and magnitude of the effluent sediment concentration graph. The model efficiency of STEP for the prediction of STE equals 0·38 and the root mean square error equals 4·7%. Similar models, such as DEPOSITS and CSTRS, were inefficient in predicting the experimental results. The STEP model was used to simulate the long‐term (33 years) STE of small retention ponds in central Belgium using 10‐min rainfall data. For a typical pond (1000 m2) with a catchment area of 25 ha, annual STE can vary from 58 to 100%, with a long‐term STE of only 68%. Copyright © 2001 John Wiley & Sons, Ltd.  相似文献   

17.
Many beaver ponds in the Rocky Mountains, that have been described in the literature, are in‐channel ponds that are relatively small and short‐lived. This paper describes floodplain beaver ponds on low‐gradient deltas in glacial finger lakes in Glacier National Park, Montana. These ponds are distinctly larger, probably fed by hyporheic flow, and stable and long‐lived. Ponds examined were, with one exception, 44 years old. Glacial discharge is present in each valley where beaver ponds occupy low‐gradient deltas, and this discharge likely sustains pond water level over the course of the summer. As glaciers recede and disappear, deltaic beaver ponds dependent on hyporheic flow may be negatively affected. Copyright © 2012 John Wiley & Sons, Ltd.  相似文献   

18.
We analyzed variation of channel–floodplain suspended sediment exchange along a 140 km reach of the lower Amazon River for two decades (1995–2014). Daily sediment fluxes were determined by combining measured and estimated surface sediment concentrations with river–floodplain water exchanges computed with a two‐dimensional hydraulic model. The average annual inflow to the floodplain was 4088 ± 2017 Gg yr?1 and the outflow was 2251 ± 471 Gg yr?1, respectively. Prediction of average sediment accretion rate was twice the estimate from a previous study of this same reach and more than an order of magnitude lower than an estimate from an earlier regional scale study. The amount of water routed through the floodplain, which is sensitive to levee topography and increases exponentially with river discharge, was the main factor controlling the variation in total annual sediment inflow. Besides floodplain routing, the total annual sediment export depended on the increase in sediment concentration in lakes during floodplain drainage. The recent increasing amplitude of the Amazon River annual flood over two decades has caused a substantial shift in water and sediment river–floodplain exchanges. In the second decade (2005–2014), as the frequency of extreme floods increased, annual sediment inflow increased by 81% and net storage increased by 317% in relation to the previous decade (1995–2004). Copyright © 2017 John Wiley & Sons, Ltd.  相似文献   

19.
River reaches downstream of dams with constant residual discharge often lack sediment supply and periodic high flows due to dam sediment retention and flow regulation, respectively. To test a novel multi-deposit methodology for defining environmental flows for activating the dynamics of the river morphology downstream of dams, a flood was released from Rossens Dam in Switzerland. This event was combined for the first time with a multi-deposit configuration of sediment replenishment consisting of four artificial deposits allocated as alternate bars along the riverbanks as a restoration measure. To validate the sediment transport behaviour observed in laboratory tests, stones were equipped with radiofrequency identification (RFID) passive integrated transponder (PIT) tags, a fixed antenna was installed at the river bed and a mobile antenna was used to enable the investigation of the erosion, transport and deposition of replenished sediments. The duration of the erosion period was determined for the tracked stones, and average transport velocities were found to be on the order of 10–3 m/s. To estimate the erosion efficiency of the flood, defined as the eroded tagged stones compared with the released water volume, the hydrograph was divided into different periods: rising limb, constant peak discharge, decreasing limb. During the rising limb of the flood, which lasted for 20% of the total flood duration, more than 40% of the PIT tags were transported. The defined erosion efficiency is a measure to support the hydrographic design of artificial flood releases from dams. The deposition of tagged stones resulted in a repeating cluster formation, as expected from previous laboratory experiments, creating an increase in hydraulic habitat diversity. Comparison of the results obtained in the field and from laboratory experiments confirmed the robustness of the multi-deposit sediment replenishment method. Combined with the knowledge gained on the erosion efficiency, these results could motivate further applications and research into multi-deposit sediment replenishment techniques as a habitat-oriented river restoration measure. © 2020 John Wiley & Sons, Ltd.  相似文献   

20.
Among the different controls of erosion budget at basin level, the relative impact of dams and land management is yet to be investigated. In this paper, the impact of dams on sediment yield has been assessed by using a conceptual modelling framework which considers the gross erosion and the cascade of dams constructed on a river network. The sediment budget has been estimated based on the gross erosion, deposition of sediment in reservoirs, and sediment yields of 23 mainland river basins of India. The gross erosion of the country is estimated as 5.11 ± 0.4 Gt yr?1 or 1559 t km?2 yr?1, out of which 34.1 ± 12% of the total eroded soil is deposited in the reservoirs, 22.9 ± 29% is discharged outside the country (mainly to oceans), and the remaining 43.0 ± 41% is displaced within the river basins. The river basins of northern India contribute about 81% of the total sediment yield from landmass while the share of southern river basins is 19%. The components of revised sediment budget for India are prominently influenced by the sediment trapped in reservoirs and the treatment of catchment areas by soil and water conservation measures. Analysis of sediment deposition in 4937 reservoirs indicated the average annual percentage capacity loss as 1.04% though it varies from 0.8% to >2% per year in smaller dams (1–50 Mm3 capacity) and from <0.5% to 0.8% per year in larger dams (51 to >1000 Mm3 capacity). Siltation of smaller dams poses a serious threat to their ecosystem services as they cater to a wider population for domestic, agricultural, and industrial purposes. Amongst the environment controls, land use significantly impacts the gross erosion rate and specific sediment yield as compared to climatic and topographic parameters. However, to analyse their integrated effect on the complex processes of sediment fluxes in a basin, further research efforts are needed. Copyright © 2016 John Wiley & Sons, Ltd.  相似文献   

设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号