首页 | 本学科首页   官方微博 | 高级检索  
相似文献
 共查询到20条相似文献,搜索用时 390 毫秒
1.
Influence of transducer-ground coupling on vibration measurements   总被引:1,自引:0,他引:1  
Various methods of transducer mounting provide varying degrees of coupling between the transducer and the measurement surface. The influence of four of these methods on vibration measurements was studied. For this purpose, the first transducer was placed freely on a horizontal surface, the second one was 'sandbagged', the third one was 'spiked' and the fourth one was completely buried in soil. These transducers were mounted side by side and ground vibrations were monitored for 14 blasts at an opencast coal mine.

Ground vibrations in terms of peak particle velocity, peak vector sum and frequency with different mounting methods were analysed. Assuming the data of the buried transducer as the most acceptable one, relative values of other transducers were determined and plotted. For the given tolerance for instrumental and human errors, anomalous readings were found in some cases. The waveforms of the buried transducer were then compared with those of others. Clear distortion in the waveforms or a very low correlation coefficient between two waveforms was suspected poor coupling.

The results indicate that decoupling is most likely with the surface transducer. However, the sandbagged and spiked transducers are also prone to decoupling. Decoupling can result in higher or lower ground vibration. Therefore, burial should be the preferred method for mounting of transducers in soil.  相似文献   

2.
In order to control or reduce the ground vibrations caused by underground blasts in Malmberget mine, a number of blast tests were carried out during production blasts and a series of single shot waveforms were obtained. Then the single shot waveforms from the same ring or different rings were analysed and compared with each other. The results showed that the single shots are reproducible, meaning that the ground vibrations caused by underground blasts can be controlled by means of the interference of the vibration waveforms measured. Finally, a formal test using electronic detonators and employing an optimum delay time of 8 ms was done in production. The test for an 11-borehole ring shows that the maximum vertical ground vibrations are reduced to the maximum vertical vibrations of a single shot. Particularly, the total vibration history for the 11-borehole-ring blast is shortened to about 200 ms over a velocity of 2 mm/s. However, the total vibration history of a normal production blast of 11-borehole ring is always 1400 ms over a velocity of 2 mm/s, namely the total vibration time of a production blast can be reduced to one seventh of that of the common production blasts by using the vibration control method. This indicates that the vibration control method introduced in the paper is feasible for underground mining blasts.  相似文献   

3.
Investigations were carried out at three underground coal mines in India to study the response of surface structures to underground blasting and the likelihood of damage to the structures. The structures in the vicinity of the underground blasting area were single and multistoried residential houses. The amplitudes of vibration due to underground blasting were monitored simultaneously on the ground surface near the foundation of the structures and on various floors of the structures. The vibrations were also monitored near the important surface installations. It was observed that the magnitude of vibration in structures decreased with the increase in the height of the structures. The frequency of blast vibration from underground blasting was higher than the natural frequency of the structures. Little energy was transmitted into the structures, which caused reduction in the vibration level in the structures. The reduction in the vibration levels was up to 45% in the houses. It indicates that the dominant frequency of blast vibration plays an important role in persistence of vibration and its amplification or reduction characteristics in the structures. This paper deals with the effect of the vibrations on structures/houses standing above the blasting faces in underground workings and their potential to likely damage to the structures at different Indian geo-mining conditions.  相似文献   

4.
Due to the large-scale sub-level caving in Malmberget mine and the short distance between the mine and Malmberget town, the ground vibrations in the town have reached a high level since the year 2001 when large scale caving mining started. In order to control and reduce the high vibrations, LKAB launched a research project on active reduction of vibrations in Malmberget by using the wave interference or wave superposition method with electronic detonators. By means of this method, the vertical vibrations were reduced by 10% and the total vibration time for a ring blast was reduced by 80% according to five ring tests in the mine. For a further reduction of the vibrations, a second method, named changing initiation sequence in ring blasts, was developed on the basis of stress wave theory and the geographic conditions of the town and the mine. The second method has so far been applied in all of the drifts near the town, and the vibrations measured at the town show that the vertical vibrations caused by production blasts in the mine have been reduced by more than 31% on average. In addition, a third method, dividing a ring into two parts during blasting, was developed and used to reduce the ground vibrations from a number of very large rings in the mine. The results indicate that the vibrations have been reduced by more than 33%, and a more interesting and surprising result is that ore extraction has been increased by the third method.  相似文献   

5.
There is a common belief within the blasting community that increasing the burden will increase the blast vibration. In order to test this belief in a direct sense, it would be desirable to fire single blastholes with various burdens and monitor the vibrations at many locations. A review of past literature indicates that such direct tests are rare and only scant data is available. Nevertheless, a detailed analysis of this and associated past work (on small-scale blocks and choke blasts) shows no convincing evidence of an influence of burden on blast vibration. On the other hand, by considering the role of reflected waves in a simple analytical model, reasoning is given to show that the vibration might well be insensitive to burden. In view of the scant data available, it was decided to conduct trials of a direct nature, in which 13 single blastholes were fired to a free face. The burdens chosen were 2.6 m, 5.2 m and 10.4 m, and the vibration was measured at typically 10 locations over the range 5 m to 50 m from each hole. The results clearly show that the vibration is independent of such burdens. Furthermore, a side-by-side comparison of a choke blast with a free-face blast showed that the vibration from the holes in the choke blast was not higher than the vibration from the holes in the free-face blast. The present work also shows that vibration, although insensitive to burden, is not insensitive to the condition (i.e., the degree of damage) of the surrounding rock mass. In this regard, blastholes in undamaged ground produce a significantly higher vibration than blastholes in damaged ground. This might well be the reason why pre splits and drop-cuts are observed to produce relatively high vibrations, i.e., it is not because such blasts typically involve large burdens, but rather that they are usually initiated in relatively undamaged ground.  相似文献   

6.
This study evaluates the impacts resulting from quarry-blasting operation on nearby buildings and structures as it generates ground vibration, air blast, and fly rocks. In this paper, first blasting operation and its possible environmental effects are defined. Then the methods of blast-vibration prediction and commonly accepted criteria to prevent damage were introduced. A field experimental work was conducted to minimize the vibration effects at Saribayir quarry as it is an identical case for the many quarries situated in and around Istanbul, Turkey. Although the local surrounding geology and rock mechanics have great influence on vibrations as uncontrollable parameter, the charge weight per delay, delay period, geometric parameters of the blasts were changed to solve the existing vibration problem in the studied quarry. To obtain a realistic result, 10 blasts were carried out and 30 seismic records were made in different places mainly very close the buildings and the other vulnerable structures around the quarry. The evaluation is performed whether the vibration level are within safe limits or not. The prediction equation based on scaled distance concept is also determined, however, it is a site-specific model and need to be updated when the quarry advances. The safe blast parameters which minimize the environmental effect were determined for the Saribayir quarry.  相似文献   

7.
Investigations were carried out at seven underground coal mines in India to characterise the responses of roof and pillars of underground workings to the vibrations induced by adjacent open-pit blasting. The roof rocks of the selected underground instrumented panels were having RMR between 36.7 to 57. Monitoring of strata behaviour was carried out before and after blasts. Arrangements were made to mount the transducers of seismographs in roof and pillars to monitor the vibration. Attempts were made to monitor the vibration simultaneously, for a blast, in the pillar and at the junction of the roof or away from the junction in the gallery. 102 sets of such vibration data were recorded in the underground mines. It was observed that the roof of underground roadways vibrated with higher peak particle velocity (PPV) compared to pillars. The amplification of vibration in the roof compared to pillars, away from the junction, was 1.02 to 2.58 times whereas at the junctions, it was 2.04 to 5.57 times.  相似文献   

8.
In order to study the characteristics of ground vibrations caused by production blasts in an open pit gold mine and to evaluate the impact of the vibrations to buildings, a seismic survey was conducted at an open pit mine. Two monitoring lines with multiple seismic stations were surveyed. The first line had a length of 4,492 m and the second line runs approximately perpendicular to the first line with a length of 823 m. The seismographs recorded the particle acceleration, velocity, and displacement in longitudinal, transverse and vertical directions. The magnitudes of peak particle motions were calculated and compared with several established damage criteria used in mining and geotechnical/structure engineering. Empirical equations were established based on the field measurements. Analyses were also performed to exam the effects of geological structures on the attenuation of individual vibration components as well as the peak vector sum of the particle velocity.  相似文献   

9.
Blasting is a widely used technique for rock fragmentation in opencast mines and tunneling projects. Ground vibration is one of the most environmental effects produced by blasting operation. Therefore, the proper prediction of blast-induced ground vibrations is essential to identify safety area of blasting. This paper presents a predictive model based on gene expression programming (GEP) for estimating ground vibration produced by blasting operations conducted in a granite quarry, Malaysia. To achieve this aim, a total number of 102 blasting operations were investigated and relevant blasting parameters were measured. Furthermore, the most influential parameters on ground vibration, i.e., burden-to-spacing ratio, hole depth, stemming, powder factor, maximum charge per delay, and the distance from the blast face were considered and utilized to construct the GEP model. In order to show the capability of GEP model in estimating ground vibration, nonlinear multiple regression (NLMR) technique was also performed using the same datasets. The results demonstrated that the proposed model is able to predict blast-induced ground vibration more accurately than other developed technique. Coefficient of determination values of 0.914 and 0.874 for training and testing datasets of GEP model, respectively show superiority of this model in predicting ground vibration, while these values were obtained as 0.829 and 0.790 for NLMR model.  相似文献   

10.
A database of ground vibration due to blasting at 27 limestone quarries, located in various parts of India, has been created. The database contains peak particle velocity (PPV), frequency, other vibration related and blast design parameters. Regression analysis of the data is carried out to derive site constants of the USBM predictor equation for individual quarries. It is found that these site constants are correlated with each other. By combining all the data, a generalised predictor equation is developed to assess and control ground vibration. In addition, mean zone of attenuation has been delineated using the predictor equations of the individual quarries. The dominant frequency of ground vibration with respect to distance and the possibility of modifying it by changing delay intervals in production blasts are also examined.  相似文献   

11.
Ground motion records obtained in recent major strong earthquakes have provided evidence that ground motions recorded near the near-fault regions differ in many cases from those observed further away from the seismic source. As the forward directivity and fling effect characteristics of the near-fault ground motions, they have the potential to cause more considerable damage to structures during an earthquake. Therefore, understanding the influence of near-fault ground motions on the performance of structures is critical to mitigate damage and perform effective response. This paper presents results of a study aimed at evaluating the effects of near-fault and far-fault ground motions on seismic performance of concrete gravity dams including dam-reservoir-foundation interaction. Koyna gravity dam is selected as a numerical application. Four different near-fault ground motion records with an apparent velocity pulse are used in the analyses. The earthquake ground motions recorded at the same site from other events that the epicenter far away from the site are employed as the far-fault ground motions. The seismic performance evaluation method based on the demand-capacity ratio, the cumulative overstress duration and the spatial extent of overstressed regions is presented. The concrete damaged plasticity model including the strain hardening or softening behavior is employed in nonlinear analyses. Nonlinear seismic damage analyses of the selected concrete dam subjected to both near-fault and far-fault ground motions are performed. The results obtained from the analyses show the effects of near-fault ground motions on seismic performance of concrete gravity dams and demonstrate the importance of considering the near-fault ground excitations.  相似文献   

12.
饱和地基上列车运行引起的地面振动隔振分析   总被引:3,自引:0,他引:3  
高广运  何俊锋  李宁  杨成斌 《岩土力学》2011,32(7):2191-2198
利用推导出的频域内饱和土的以土骨架位移u和孔隙水压力p表示的u-p格式的2.5维有限元方程,分析列车低速和高速运行条件下不同隔振措施的隔振效果,包括空沟、填充沟(混凝土墙)和混凝土板(波阻板)。其中轨道被简化为饱和地基上的Euler梁,通过沿轨道方向的波数变换将三维空间问题降为平面应变问题,对求解的结果进行Fourier反变换,获得三维时域-空间域内的解。研究表明:弹性地基和饱和地基上设置空沟和填充沟隔振效果相差不大,而设置波阻板隔振效果存在较大差异。列车低速运行时,空沟基本无隔振效果,填充沟在一定范围内有隔振效果,波阻板隔振效果最好;列车高速运行时,空沟在较大沟宽和较深沟深条件下才能达到较好隔振效果,填充沟和波阻板只需较小尺寸就能达到理想的隔振效果  相似文献   

13.
This paper presents the results of a comprehensive monitoring program designed to investigate the extent of blast induced damage experienced by rock masses extracted by bench stoping methods. An array of triaxial geophones and extensometers were used to monitor blast vibration attenuation and measure hangingwall deformations during stope extraction. In addition, pre and post surveys of the hangingwall rock mass were conducted using a TV borehole camera and cavity survey instrumentation. These surveys were later used to calibrate damage profiles into the stope hangingwalls.

Peak particle velocity, hangingwall deformation measurements and stope surveys were used to develop a site specific damage model that allowed engineers to asses drilling and blasting configurations to minimise the extent of pre-conditioning and damage. In addition the study included the analysis of the frequency response, displacements and accelerations experienced by the excavation as extraction and mine filling progressed. This work aimed at improving our understanding of the influence of blasting on the dynamic behaviour of stope hangingwalls.

The study demonstrated that estimates of the maximum extent of rock mass pre-conditioning and/or damage made through the application of the Holmberg-Persson approach compared well with measured results. In addition, the study found that dynamic loading imparted on an exposed hangingwall from subsequent stope blasting was also expected to contribute to rock mass weakening and that mine filling was crucial to arrest further deterioration. Hangingwall accelerations were used to demonstrate that larger openings may be more susceptible to dynamic loading.  相似文献   

14.
In this article, the effect of reservoir length on seismic performance of gravity dams to near- and far-fault ground motions is investigated. For this purpose, four finite element models of dam–reservoir–foundation interaction system are prepared by using the Lagrangian approach. In these models, the reservoir length varies from H to 4H (H: the height of dam). The Folsom gravity dam is selected as a numerical application. Two different ground motion records of 1989 Loma Prieta earthquake are used in the analyses. One of ground motions is recorded in near fault; the other is recorded in far fault. Also, the two records have the same peak ground acceleration. The study mainly consists of three parts to assess the effects of reservoir length on the seismic performance of the concrete gravity dam. In the first part, the linear time-history analyses of the four finite element models prepared for the Folsom gravity dam are performed. In the second part, the seismic performance of the dam is evaluated according to demand–capacity ratio and cumulative inelastic duration. Finally, the nonlinear time-history analyses of the finite element models of the dam are carried out by using Drucker–Prager yield criteria for dam concrete. It is seen from the analyses results that the seismic behavior of the concrete gravity dams is considerably affected from the length of the reservoir. The reservoir length of 3H is adequate for concrete gravity dams. The selection of ground motion is on of the important parts of seismic evaluation of gravity dams. Also, the frequency characteristics of the ground motion having the same peak ground acceleration affect the seismic performance of the dam. The near-fault ground motions are generally creates more stress on the dam body than far-fault ground motions. The used performance approach provides a systematic methodology for assessment of the seismic performance and necessity of nonlinear analyses for dam systems.  相似文献   

15.
隧道近距下穿山坡楼房爆破振动测试研究   总被引:3,自引:0,他引:3  
管晓明  傅洪贤  王梦恕 《岩土力学》2014,35(7):1995-2003
以成渝客运专线新红岩隧道为工程背景,测试了隧道近距下穿山坡楼房爆破时引起的地面振动。通过对隧道浅埋侧(隧道地表斜坡下部)和深埋侧(隧道地表斜坡上部)的地表振动数据分析,研究了地表的振动速度、振动主频及振动安全评价方法。结果表明:在浅埋隧道爆破的近区,入射纵波为主要载体,地表水平和竖直方向振动的主要成分可以认为是入射纵波在水平和竖直方向的投影,浅埋侧和深埋侧地表水平和竖直方向振速的大小取决于爆心距和入射纵波与竖直方向的夹角两个因素;隧道采用电子雷管进行单孔连续起爆,相比非电雷管爆破,可以有效降低地表振动强度,同时能够提高地表振动主频;地表振动主频方面,地表竖直方向振动主频普遍高于水平方向,而且浅埋侧地表竖直和水平方向主频大多高于深埋侧地表对应方向的主频;隧道近距下穿山坡楼房进行爆破施工时,建议在浅埋侧和深埋侧地表同时布置爆破振动监测测点,并根据浅埋侧和深埋侧地表测点的峰值振速、爆破振动主频与建筑物固有频率的关系对地表振动安全进行评价,以减少隧道施工爆破对地表环境和周围建筑物造成的振动破坏。  相似文献   

16.
Directives from the Hon’ble Supreme Court of India led to the banning of mining activities within a radius of 2 km of the Sri Jambunatheswara ancient temple in Hospet taluk of Karnataka State of India. On recommendation of the Department of Archaeology & Museums, Government of Karnataka, CSIR-CIMFR undertook extensive investigations wherein the ground vibration and air overpressure due to blasting in nearby iron ore mines were monitored to assess their damage and annoyance potentials. The magnitudes of blast-induced ground vibration and air-overpressure recorded in the temple were found to be within the standard safe limits stipulated by the Directorate General of Mines Safety, India when trial blasts were carried out at a distance greater than 290 m from the temple. When blasts were conducted at a distance of beyond 845 m from the temple, neither vibration nor sound of blasting could be recorded or heard at the temple premises, indicating it a safe zone for blasting. After thorough analyses of the recorded data, precise blast design parameters were recommended for blasting at distances beyond 200 m from the temple and allowing this distance to be demarcated as the safe zone where controlled blasting could ensure safety of the ancient temple.  相似文献   

17.
Tunnels are required to be constructed for meeting different human needs such as power generation, transportation, underground storage, sewage etc. The predominant method of excavation, world over, is drilling and blasting owing to its capability to meet changing geo-technical conditions. Irrespective of the purpose for which the tunnels are driven, all are plagued by overbreak problems. Tunnels driven for water conveyance in hydroelectric power projects, in particular, need to be excavated with minimum overbreak to minimise cost of permanent concrete lining. Thus, predicting overbreak assumes significant importance to design site-specific blasts for minimizing rock damage. This paper presents a brief review of existing PPV (Peak Particle Velocity) based blast-induced rock damage estimation criteria and attempts to outline the ground vibration threshold levels for overbreak/rock damage in a tunnel driven through compact basalt. Rock damage manifested as overbreak is measured and correlated with the possible threshold levels of PPV. Also, the PPV levels for crack initiation and widening are proposed. The case pertains to a lake tap horizontal tunnel of Koyna Hydro-electric Power Project, India which is a water feeder tunnel for a fully underground hydroelectric power project. The tunnel was driven under a shallow rock cover of average depth ranging from 20 to 25m beneath a fully charged water body. The parting rock is mainly compact basalt. Blasting was carried out in two rounds in a controlled manner, i.e., by limiting the maximum charge per delay based on ground vibration monitoring. Ground vibration generated with free face (in second round) has been modeled and a new ground vibration propagation equation is proposed for tunnel blasting including the effect of an extra free face. The threshold limits of PPV for different degrees of overbreak/rock damage are proposed from extrapolated vibration predictor equation. The actual overbreak in the tunnel, measured using a Planimeter, varied from 2.45 per cent to 17.75 per cent of the finished tunnel area. The predicted overbreak from extrapolated PPV measurements is compared against the measured overbreak to validate the proposed blast-induced rock damage (BIRD) assessment model. The PPV level for overbreak was found to exceed 2050 mm/s in compact basalt. A linear relationship between the overbreak and maximum charge per delay is also established to design a tunnel blast in similar formations.  相似文献   

18.
This paper presents the influence of various discontinuities, natural or artificial, on magnitude and frequencies of blast induced ground vibrations. These discontinuities were geological faults, a pond, a shaft incline, a trench and a pre-split plane interposed in the path of vibration propagation. In the post-trench region, ground vibrations in terms of peak particle velocity were significantly reduced and dominant frequencies in higher bands were consequently observed. Depth of trench with respect to blastholes were varied and consequent vibration characteristics were analyzed. The techniques of creating a trench and pre-split plane were successfully implemented in controlling vibration and in increasing the explosives charge to meet the scheduled production target of an opencast mine. Comparisons of ground vibration characteristics affected by a trench and a pre-split plane of the same depth are described in the text. The findings lead to the conclusion that such experimental data are necessary for production blasting in open cast mines under constrained conditions.  相似文献   

19.
Empirical approaches for predicting fragmentation from blasting continue to play a significant role in the mining industry in spite of a number of inherent limitations associated with such methods. These methods can be successfully applied provided the users understand or recognize their limitations. Arguably, the most successful empirical based fragmentation models have been those applicable to surface blasting (e.g., Kuz-Ram/Kuznetsov based models). With widespread adoption of fragmentation assessment technologies in underground operations, an opportunity has arisen to extend and further develop these type approaches to underground production blasting.

This paper discusses the development of a new fragmentation modelling framework for underground ring blasting applications. The approach is based on the back-analysis of geotechnical, blasting and fragmentation data gathered at the Ridgeway sub level caving (SLC) operation in conjunction with experiences from a number of surface blasting operations.

The basis of the model are, relating a peak particle velocity (PPV) breakage threshold to a breakage uniformity index; modelling of the coarse end of the size distribution with the Rosin-Rammler distribution; and modelling the generation of fines with a newly developed approach that allows the prediction of the volume of crushing around blastholes.

Preliminary validations of the proposed model have shown encouraging results. Further testing and validation of the proposed model framework continues and the approach is currently being incorporated into an underground blast design and analysis software to facilitate its application.  相似文献   

20.
Wall control blasting practices arc necessary to reduce the impact of blasting on mine faces but can also have a significant negative impact on mine productivity and operating costs. The conventional practice in deep open pit mines is to use so-called trim blasts adjacent to pit walls. To provide burden relief these trim blasts have fewer rows than full production blasts and are fired to a cleared free-face: hence they are termed 'unchoked.' This practice leads to scheduling constraints on the pit operations and can cause ore dilution due to excessive muckpile movement. The use of such trim blasts stems from the perception that increased wall damage results from 'choked' blasts. These concerns are based on the unproven assumptions that blast vibration levels and explosive gas penetration increase with increased blast burden and face confinement. This paper describes work undertaken as part of a major investigation into wall control blasting at the KCGM Fimiston Mine, Kalgoorlie, Western Australia. It details a study to assess damage effects due to blast burden. Borehole air pressure measurements and borehole video camera inspections owere done behind a series of single blastholes drilled owith varying burden distances, as owell as behind a dedicated trim blast and a full production blast. It was found that the measured damage effects, including visible rock cracking, dilation, and the limited extent of gas penetration behind the blastholes, did not vary significantly with burden or blast type for the cases tested. This result was in complete agreement with detailed vibration measurements conducted by Blair and Armstrong [1] during the study, which found that vibration was independent of blast burden. As a result of these investigations, changes to the blasting practices at the mine were implemented. Dedicated trim blasts and free-face blasting have been replaced by modified production blasts and the practice of 'choking' blasts has been introduced. This has resulted in a significant improvement in productivity and cost savings without compromising pit wall integrity.  相似文献   

设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号