首页 | 本学科首页   官方微博 | 高级检索  
相似文献
 共查询到20条相似文献,搜索用时 78 毫秒
1.
In this paper the researches made in 1981-1990 have identified that the annual soil loss in the Three Gorges region is 157 million t. and the annual incoming sediment load of the Three Gorges reservoir is 40 million t. Soil erosion increases with the destruction of vegetative cover and its subsequent evolution. The annual amounts of sediment erosion for forest land, shrub land, grassland and farmland make up respectively 6.19%, 10.76%, 23.05% and 60% of the total erosion of the Three Gorges region; the quantities of incoming sediment load to the Yangtze River from the above four types of land account for 5.95%, 12.42%, 35.46% and 46.1 % of the total amount of sediment transported to the reservoir. The farmland of offers the main source of sediment. Gravitational erosion produces more bed loads, which will present serious threat to the Three Gorges Project if entering the reservoir. Resettlement of people to the upper parts of the mountainous areas for agricultural production will increase the sediment yield of the Three Gorges region by 10-20 million t and increase the incoming sediment of the Yangtze River by 50-60 million t. Consequently, it is necessary to make a realistic assessment of the soil erosion in the Three Gorges region.  相似文献   

2.
《水文科学杂志》2013,58(2):457-465
Abstract

Periodicity of the runoff and the sediment load, and possible impacts from human activities and climatic changes, in the Yangtze River basin during 1963–2004 are discussed based on the monthly sediment and runoff data, and using the wavelet approach. Research results indicated that: (a) Sediment load changes are severely impacted by the different types of human activity (e.g. construction of water reservoirs, deforestation/afforestation); and the runoff variability is the direct result of climatic changes, e.g. the precipitation changes. (b) The impacts of human activity and climatic changes on the sediment load and runoff changes are greater in smaller river basins (e.g. the Jialingjiang River basin) than in larger river basins. The response of sediment load and runoff changes to the impacts of human activities and climatic changes are prompt and prominent in the Jialingjiang River basin relative to those in the mainstem of the Yangtze River basin. (c) Construction of the Three Gorges Dam has already had obvious impacts on the sediment transport process in the middle and lower Yangtze River basin, but shows no obvious influence on the runoff changes. Construction of the Three Gorges Dam will result in further re-adjustment of the scouring/filling process within the river channel in the middle and lower Yangtze River basin, and have corresponding effects on the altered sediment load because of the Dam's operation for the river channel, ecology, sustainable social economy and even the development of the Yangtze Delta. This will be of concern to local governments and policy makers.  相似文献   

3.
The characteristics of water flow and sediment transport in a typical meandering and island-braided reach of the middle Yangtze River is investigated using a two-dimensional (2D) mathematical model. The major problems studied in the paper include the carrying capacity for suspended load, the incipient velocity and transport formula of non-uniform sediment, the thickness of the mixed layer on the riverbed, and the partitioning of bed load and suspended load. The model parameters are calibrated using extensive field data. Water surface profiles, distribution of flow velocities, riverbed deformation are verified with site measurements. The model is applied to a meandering and island-braided section of the Wakouzi-Majiazui reach in the middle Yangtze River, which is about 200 km downstream from the Three Gorges Dam, to study the training scheme of the navigation channels. The model predicts the processes of sediment deposition and fiver bed erosion, changes of flow stage and navigation conditions for the first 20 years of impoundment of the Three Gorges Project.  相似文献   

4.
PREDICTIONOFIMPACTOFTHETHREEGORGESPROJECTONESTUARYBEACHOFTHEYANGTZERIVERWeibingFENG1YigangWANG2andXiuchengZHONG3ABSTRACTAltho...  相似文献   

5.
1 INTRODUCTION With advances in computer technology and numerical methods, three-dimensional (3D) mathematical models for sediment transport are gradually applied more often and for more practical projects of hydraulic engineering. Three-dimensional mathematical river models can describe not only the secondary flow, but also the transport, deposition, and erosion of sediment in the river channel and the flood plain. However, at present the theories of sediment transport are not as well de…  相似文献   

6.
Sediment supply to the lower Jingjiang River will be subject to substantial reduction after the impoundment of the Three Gorges Reservoir, which could result in an excess of carrying capacity and serious bank erosions in the downstream alluvial channel, threatening the bank protection works and the safety of the Jingjiang Dyke. This paper presents a summary of research works concerning the fluvial processes in the lower Jingjiang River and the possible impact of the Three Gorges Reservoir impoundment on the variation of its channel pattern. Three different predictions have been put forward by researchers: 1) the Jingjiang River will evolve towards a more sinuous, meandering channel pattern, with extensive bank erosion taking place along the river; 2) the river channel will be straightened and broadened because no point bar can be formed due to reduced sediment supply while bank erosion develops in the concave bank, and 3) this river reach will maintain its present channel pattern without significant change, although the sinuosity may be slightly reduced, since: a) the Three Gorges Reservoir mainly intercept sediment particles with sizes larger than 0.025mm, and b) the complex interaction between the Yangtze River and the Dongting Lake helps to reduce the negative effect of channel erosion through certain self-adjusting mechanism in fluvial processes. Discrepancy between these predictions shows that further research efforts are needed to understand the impact of Three Gorges Reservoir operation on the downstream fluvial processes. Meanwhile, there is an urgent need to closely monitor future development in the fluvial processes of the Jingjiang River and its influence on the safety of the Jingjiang Dykes.  相似文献   

7.
This paper summarizes the latest developments, future prospects, and proposed countermeasures of reservoir sedimentation and channel scour downstream of the Three Gorges Reservoir (TGR) on the Yangtze River in China. Three key results have been found.(1) The incoming sediment load to the TGR has been significantly lower than expected.(2) The accumulated volume of sediment deposition in the TGR is smaller than expected because the overall sediment delivery ratio is relatively low, and the deposition in the near-dam area of the TGR is still developing.(3) River bed scour in the river reaches downstream of the Gezhouba Dam is still occurring and channel scour has extended to reaches as far downstream as the Hukou reach. Significantly, sedimentation of the TGR is less problematic than expected since the start of operation of the TGR on the one hand;on the other hand, the possible increases in sediment risks from dependence on upstream sediment control, deposition in the reservoir, and scour along middle Yangtze River should be paid more attention.(1) Sediment trapped by dams built along the upper Yangtze River and billion tons of loose materials on unstable slopes produced by the Wenchuan Earthquake could be new sediment sources for the upper Yangtze River. More seriously, possible release of this sediment into the upper Yangtze River due to new earthquakes or extreme climate events could overwhelm the river system, and produce catastrophic consequences.(2) Increasing sediment deposition in the TGR is harmful to the safety and efficiency of project operation and navigation.(3) The drastic scour along the middle Yangtze River has intensified the down-cutting of the riverbed and erosion of revetment, it has already led to increasing risk to flood control structures and ecological safety. It is suggested to continue the Field Observation Program, to initiate research programs and to focus on risks of sedimentation.  相似文献   

8.
1 BACKGROUND The Illinois River is the most significant river in the state of Illinois. The river drains nearly half of the state and has a drainage area of 28,906 mi2 (74,867 km2). Except for about a 4,000 mi2 (10,360 km2) area in Indiana and Wisconsin, the watershed is located in Illinois (see Fig. 1). The watershed contains the drainage basins of several of the state's significant rivers such as the Sangamon, LaMoine, Spoon, Mackinaw, Vermilion, Fox, Kankakee, and Des Plaines Ri…  相似文献   

9.
《国际泥沙研究》2023,38(5):653-661
Studying the characteristics of runoff and sediment processes and revealing the sources of sediment provide key guidance for the scientific formulation of relevant soil erosion protection measures and water conservancy development plans. In the current study, the flow and sediment data of five hydrological stations on the main stream of the Fu River Basin (FRB) from 2007 to 2018 were selected to identify flood events, explore the variation of sediment transport along the FRB, and clarify the sediment sources. The results found that the Jiangyou–Fujiangqiao section is the main source of sediment in the FRB during the flood season. The runoff volume and sediment load during flood events in the Jiangyou–Fujiangqiao section accounted for 35% and 145% respectively of that of Xiaoheba station. These results combined with the change of the sediment load before and after the 2008 Wenchuan Earthquake (May 12) show that the sediment in this section mainly comes from the Fu River tributary–the Tongkou River watershed. The calculation results for the sediment carrying capacity of the Fu River show that the main stream was in a state of erosion in theory. However, according to the calculation results for the interval sediment yield during flood events, the sediment load at the Xiaoheba station was smaller than that at the Shehong station upstream. The analysis indicates that this was not because of sediment deposition in the river channel, but because of sand mining in the river channel and sediment interception by water conservancy projects. If heavy rainfall occurs in the FRB, the sediment accumulated upstream will move downstream with the resulting flood, and the sediment yield in the FRB may further increase. These research conclusions can provide reference information for improving the prediction and management ability of soil and water loss in the FRB and scientific regulation of the Three Gorges Reservoir.  相似文献   

10.
Evolution of the Yangtze River in East Asia is closely linked to the evolving topography following India-Eurasia collision and plays an important role in connecting the Tibetan plateau and the marginal sea, which is of great significance for understanding the evolution of modern Asian landform pattern and exploring the response of river development to tectonic uplift and monsoon evolution. Thus, many methods have been performed to reconstruct the evolution history of the Yangtze River, but there are still some disputes about the age of the Yangtze River, which has been strongly debated for over a century with estimates ranging from late Cretaceous to late Pleistocene. At present, sediment provenance tracing is one of the most important methods for studying the Yangtze River drainage evolution, for the provenance tracers could effectively represent the source area information and the various dating methods would provide reliable chronology framework. Previous studies showed that the zircon high closure temperature, wide distribution in fluvial sediment, and convenient sampling and analyzing made the zircon U-Pb dating a unique indicator recording the source area information. However, the Yangtze River drains a large basin and runs through different geological blocks with complicated lithology, as well as the abundant thermal historical events, leading to the zircon U-Pb dating a challenge work in tracing the sediment source within the Yangtze River Basin. In this study, based on the combination of previous research data and the "source to sink" system, the limitations and disadvantages of the detrital zircon U-Pb dating in the studies of sediment provenance tracing of the Yangtze River Basin were re-analyzed and re-discussed. Considering the evolving process of the large river system, some key areas and diagnostic information carrier, including bedrock and fluvial sediments deposited in present day or geo-history, would provide significant constraints on the evolution process. The former records the original information of the source region, and the latter reserves the practical information preserved in the downstream sink. As for the Yangtze River Basin, the limitation and disadvantages of the detrital zircon U-Pb dating in tracing sediment provenance are showed as follows:Firstly, six major tectonic units in the source region shows four similar age peaks, which closely corresponds to the previously identified synchronous major granitoid magmatic episodes. Five similar age peaks obviously exist in the sediment of the downstream sink both in the modern fluvial sediment and the geo-historical deposits such as outcrops and basin sediments. Thus, detrital zircon U-Pb chronology is indistinguishable from source to sink, making it unreliable in provenance tracing of the Yangtze River. Secondly, comparing with the detrital zircon spectra of tributary downstream and the upper reaches, all the tributaries below the Three Gores, the running-through of which is regarded as the symbol of the establishment of the modern Yangtze River system, could make up the similar spectra with the modern river sediments. Moreover, Sichuan Basin and Jianghan Basin, which is the last basin and first basin in western and eastern of the Three Gorges, are crucial basins for recording the incision information. However, sediment in these two basins show the similar spectra with five major age peaks from early Jurassic to late Cretaceous, which means the detrital zircon U-Pb chronology could not efficiently record the capture information no matter in spatial scale or time scale. In addition, the same results are also shown in Neogene gravel layer both in Jianghan Basin and Nanjing area. In summary, we propose that the similarity of the detrital zircon age spectra exists widely in Yangtze River system, and this greatly restricts the application of detrital zircon chronology in provenance tracing in the Yangtze River Basin, and the combination of multi-index and multi-method will shed new light in the future studies of provenance tracing within Yangtze River drainage system.  相似文献   

11.
《水文科学杂志》2013,58(4):777-792
Abstract

Based on data from five hydrometric stations, Pingshan station on the Jinshajiang River, Gaochang station on the Minjiang River, Wulong station on the Wujiang River, Wusheng station on the Jialingjiang River and Yichang station on the Yangtze River, a study has been made of the temporal variation in grain size of suspended sediment load in the upper Yangtze River. The results show that in the past 40 years, the grain size of the suspended sediment load in the main stem and major tributaries of the upper Yangtze River has had a decreasing trend, that can be explained by the effect of reservoir construction and implementation of soil conservation measures. The reservoirs in the upper Yangtze River Basin, all used for water storage for hydro-electric generation and/or irrigation, have trapped coarse sediment from the drainage area above the dam and, thus, the sediment released now is much finer than before the construction of the reservoirs. The downstream channels are all gravel-bedded or even in bedrock, with little fine sediment, and thus, the released flow can hardly get a supply of fine sediment through eroding the bed. Then, after the downstream adjustment, the grain size of suspended sediment is still fine. Large-scale soil conservation measures have significantly reduced sediment yield in some major sediment source areas. The relatively coarse sediment is trapped and, thus, the sediment delivered to the river becomes finer.  相似文献   

12.
In this article,the shrinking of Dongting Lake and its progressively weakening connection with the Yangtze River and their impact on flooding before and after the implementation of the Three Gorges Project are analyzed.In recent decades,human activity combined with natural processes has altered the flow of the middle reach channel of the Yangtze River and interfered with its connection with Dongting Lake.This has resulted in progressively more frequent flooding in the area.This study uses hydrological data to analyze the annual maximum discharge and annual maximum stage development of the middle reach of the Yangtze River and Dongting Lake.In recent decades before the Three Gorges Project became operational in 2003,the annual maximum discharge and the maximum stage recorded in the middle reach of the river downstream of Dongting Lake had increased,a result of the weakening of the flood regulation function of Dongting Lake;the annual maximum stage at Luoshan station(downstream,close to the confluence of the Yangtze River and Dongting Lake) had risen by about 2.0 m during 1955-2005,(1.5 m attributed to annual maximum discharge and 0.5 m to river channel deposition).Observational data recorded after the Three Gorges Project was put into operation in 2003,it can be seen that deposition in the Dongting Lake has nearly ceased and the lake's connection with the Yangtze River is stable.It is evident that the flood regulation function of Dongting Lake will continue,and that during the lifetime of the Three Gorges Project,the flood situation in the middle reach of the Yangtze River and Dongting Lake will remain stable.  相似文献   

13.
The construction of hydropower projects,such as Xiluodu and Xiangjiaba Reservoirs,in the upper Yangtze River will lead to variations of the incoming water and sediment conditions and in turn changes in the deposition and erosion processes in the fluctuating backwater reach of the Three Gorges Project(TGP).In this paper,based on the water and sediment characteristics,a 2D mathematical model in the boundary-fitting orthogonal curvilinear coordinate system has been employed to predict the space-time changes of...  相似文献   

14.
Using updated hydrological datasets from three stations, including Cuntan, Yichang and Hankou, covering the period of January 1992–December 2008, the influence of Three Gorges Dam (TGD) on streamflow and sediment load of the Yangtze River was investigated. Results indicated that TGD did not seem to exert a significant influence on streamflow occurring at three stations and changes in streamflow can be mainly attributed to streamflows of tributaries. However, a sharp decrease in the sediment load after the impoundment of TGD was observed. Clear water after the impoundment caused erosion of riverbed and resulted in more sediment at the Hankou station than at the Yichang station. No distinct changes in the annual and monthly maximum sediment loads were observed before and after the impoundment. Therefore, annual and monthly maximum sediment load changes should be subjected mainly to river hydraulics. This study has practical relevance for understanding the influence of large hydraulic structures on the hydrological processes of large rivers.  相似文献   

15.
以三峡工程为核心的梯级水库群联合调度运用显著改变水沙条件,坝下游河段出现长时间、长距离的冲淤调整,长江中下游沙量平衡分析是合理评估水库群修建对河道影响的重要依据,是河湖管理与保护的关键支撑.本文基于长时间序列原型观测资料,采用沙量平衡法分析长江中下游不同时空尺度泥沙沿程恢复特征,对比断面地形法计算结果,结合河道空间区域性特征,从临底悬沙测验误差、断面代表性及断面间距、河道采砂等多角度深入揭示两种方法计算冲淤量产生差异的主要原因.结果表明:(1)2003-2018年宜昌至大通河段冲刷泥沙10.76亿t,其中粒径d<0.125 mm的泥沙冲刷量占比达90.9%.以螺山为界,宜昌至螺山段"粗细均冲",螺山至大通河段则"细冲粗淤";(2)宜昌至大通河段2003-2018年沙量平衡法与断面地形法计算冲淤量相对偏差为71%,从沿程差异分布来看,距离三峡大坝坝址较近的宜昌至沙市河段两方法计算绝对差值较小,而沙市至大通河段差值较大,占宜昌至大通全河段绝对偏差的近86%;(3)宜昌至沙市河段河道采砂量占实测河床冲刷量的比例约为20%,临底悬沙对输沙量的改正比例为13.2%~26.7%(平均约为20%),修正后,沙量平衡法、断面地形法计算结果吻合相对较好;沙市至大通河段泥沙测验、固定断面布设、河道采砂等是导致沙量平衡法与断面地形法出现差异的主要原因.  相似文献   

16.
1INTRODUCTIONTheFenheReservoirwasimpoundedin1961withtotalstoragecapacityof720milionm3.ItisthelargestreservoirinShanxiProvince...  相似文献   

17.
Uplift of Tibet Plateau and formation of Asian Monsoon greatly affect East Asian geomorphological evolution, climate change and environment systems. Thus, those phenomena also control the origin, size and direction of river systems. The Yangtze River, as the most important linkage between Tibet Plateau and the East Asian marginal seas, delivers large volumes of water, sediment, and associated chemicals from its headwater regions and tributaries to the East China Sea, significantly influencing sedimentary system evolution in its drainage basin. Therefore, the formation of the modern Yangtze River and its geological-time evolution history have been paid more and more attention to since the beginning of the last century. After debated for more than a century, the First Bend in Shigu area and the Three Gorges have been known as the key capture point of the Yangtze River's evolution history. In particularly, the Three Gorges incision period remains greatly controversial, which mainly focuses on Cretaceous period-Neogene period, early Pleistocene period, and late Quaternary period. The Yichang Gravel, just located downstream and outlet of the Three Gorges with an inverted triangle shape, is mainly distributed in western Jianghan Basin with over 1 000km2. Because of its wide distribution and key geographical location, many typical profiles of Yichang Gravel have been the critical materials for studies on stratigraphic division, geomorphic evolution, and paleoenvironment change in middle Yangtze River Basin, especially on the Three Gorges incision history. Based on the previous field investigation, the Yichang gravel unconformably overlies the Cretaceous bedrocks and underlies the mid-Pleistocene vermicular red earth. In addition, studies on heavy mineral assemblages, Pb isotopic compositions of detrital K-feldspar grains, magnetic characteristics as well as pollen assemblage characteristics have showed that sediments in Yichang Gravel are mainly derived from upper Yangtze River Basin, such as Jinshangjiang drainage, Minjiang drainage, Jialingjiang drainage and Wujiang drainage. Based on the above comprehensive analysis, researchers demonstrated that the depositing time of Yichang Gravel can best constrain the Three Gorges incising time. The absolute altitude of Yichang Gravel exceeds 110m, and many thick sand lens are developed from top to bottom of the profiles. In this study, we applied the quartz Ti-Li center ESR dating method in Yichang Gravel to determine its absolute formation age, and then to constrain the minimum cutting-through time of Three Gorges. Eight samples(SXY-1, SXY-2, YC-1-4, LJY-1, LJY-2)were collected from the sand lens at depths of 4m, 19m, 40m, 51m, 63m, 75m, 83m and 99m respectively from the top of the profile. At the same time, in order to evaluate the residual dose of Ti-Li center after sunlight bleaching, we also sampled four modern surface Yangtze River sediments near Yichang Gravel for ESR measurement. The result shows that the quartz Ti-Li center ESR signal intensity of the 4 modern fluvial sediments samples are zero, which implies that the Ti-Li center ESR signal intensity of quartz in Yichang Gravel sand lens could be bleached to zero before the last burial. Thus, the above results indicate that the ESR dating results of this paper are reliable. The ESR absolute age from top to bottom of the profile is 0.73Ma BP,0.87Ma BP,0.98Ma BP,1.04Ma BP,1.05Ma BP,1.10Ma BP, 1.11Ma BP, 1.12Ma BP, respectively. The ESR dating results show that the Yichang Gravel began to deposit at about 1. 12Ma BP until 0. 73Ma BP, and the Ti-Li center ESR age indicates that the Yangtze River cut through Three Gorges area no later than 1.12Ma BP.  相似文献   

18.
《国际泥沙研究》2022,37(5):639-652
The Jinsha River comprises the upper reaches of the Yangtze River, which is the river section with the highest sediment content. Monitoring of sediment transport in the Jinsha River is done to the guarantee for the normal operation of the Three Gorges Reservoir. In the current study, a copula function was used to do a joint probability analysis of the water and sediment in the Jinsha River Basin (JRB), further a sediment load prediction model based on the copula function also was constructed. The results show that the average annual flow from 2001 to 2018 at the outlet of the Jinsha River (Yibin station) is about 60.43 billion m3, and the average annual sediment load is about 58.82 million t. The linear correlation coefficient between annual flow and annual sediment load is 0.28. The best marginal distribution for annual flow and sediment load is Pearson Type Three (PE3) and Generalized Normal (GNO), respectively, and the best fit for the combined distribution of the two variables is the Frank copula function. The synchronous probability of water and sediment occurrence is 0.459, and the asynchronous probability is 0.541. Based on the copula prediction model, the sediment load can be effectively simulated, and the correlation coefficient between the simulated sequence and the measured sequence reached 0.93. The current study provides important significance for the analysis of water and sediment in the JRB, which is beneficial to the management of Three Gorges Reservoir sediment discharge in the upstream and downstream.  相似文献   

19.
1INTRODUCTIONTheBrahmaputraRiveroriginatesfromtheJimayanzhongglacieratthenorthfootoftheHimalayaMountainsinSouthTibet,China.I...  相似文献   

20.
1 INTRODUCTION Large-scale flood disasters have frequently occurred in the middle Yangtze River since the 1990抯. The Jingjiang River and Dongting Lake (Fig. 1) comprise the most serious area of flood disasters. The main characteristic of recent disasters is low discharge and high water stage. Recent research has begun to pay more attention to the important role of sediment deposition (Li and Ni, 1998). Though the Yangtze River is not an overloaded river, the amount of sediment trans…  相似文献   

设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号