首页 | 本学科首页   官方微博 | 高级检索  
相似文献
 共查询到20条相似文献,搜索用时 15 毫秒
1.
Development of subsurface energy and environmental resources can be improved by tuning important decision variables such as well locations and operating rates to optimize a desired performance metric. Optimal well locations in a discretized reservoir model are typically identified by solving an integer programming problem while identification of optimal well settings (controls) is formulated as a continuous optimization problem. In general, however, the decision variables in field development optimization can include many design parameters such as the number, type, location, short-term and long-term operational settings (controls), and drilling schedule of the wells. In addition to the large number of decision variables, field optimization problems are further complicated by the existing technical and physical constraints as well as the uncertainty in describing heterogeneous properties of geologic formations. In this paper, we consider simultaneous optimization of well locations and dynamic rate allocations under geologic uncertainty using a variant of the simultaneous perturbation and stochastic approximation (SPSA). In addition, by taking advantage of the robustness of SPSA against errors in calculating the cost function, we develop an efficient field development optimization under geologic uncertainty, where an ensemble of models are used to describe important flow and transport reservoir properties (e.g., permeability and porosity). We use several numerical experiments, including a channel layer of the SPE10 model and the three-dimensional PUNQ-S3 reservoir, to illustrate the performance improvement that can be achieved by solving a combined well placement and control optimization using the SPSA algorithm under known and uncertain reservoir model assumptions.  相似文献   

2.
涪陵页岩气田是我国第一个投入商业化开发的国家级页岩气示范区,与北美相比,涪陵地区地表条件、地质条件和页岩气储层特征更加复杂、储层埋藏更深,开发初期钻井机械钻速低、钻井周期长、成本高。为此开展了涪陵页岩气田水平井组优快钻井技术研究,形成了集水平井组钻井工程优化设计、水平井优快钻井技术、国产低成本油基钻井液、满足大型压裂要求的长水平段水平井固井技术、山地特点“井工厂”钻井技术以及绿色环保钻井技术为核心的页岩气水平井组优快钻井技术体系。在涪陵页岩气田推广应用了290口井,完井256口,平均单井机械钻速提高了182%,平均单井钻井周期缩短了55%,平均单井钻井成本降低了34%。为涪陵页岩气田年50亿m3一期产能建设的顺利完成提供了强有力的技术支撑,对我国页岩气规模开发提供了重要的借鉴和引领作用。  相似文献   

3.
There is no gainsaying that determining the optimal number, type, and location of hydrocarbon reservoir wells is a very important aspect of field development planning. The reason behind this fact is not farfetched—the objective of any field development exercise is to maximize the total hydrocarbon recovery, which for all intents and purposes, can be measured by an economic criterion such as the net present value of the reservoir during its estimated operational life-cycle. Since the cost of drilling and completion of wells can be significantly high (millions of dollars), there is need for some form of operational and economic justification of potential well configuration, so that the ultimate purpose of maximizing production and asset value is not defeated in the long run. The problem, however, is that well optimization problems are by no means trivial. Inherent drawbacks include the associated computational cost of evaluating the objective function, the high dimensionality of the search space, and the effects of a continuous range of geological uncertainty. In this paper, the differential evolution (DE) and the particle swarm optimization (PSO) algorithms are applied to well placement problems. The results emanating from both algorithms are compared with results obtained by applying a third algorithm called hybrid particle swarm differential evolution (HPSDE)—a product of the hybridization of DE and PSO algorithms. Three cases involving the placement of vertical wells in 2-D and 3-D reservoir models are considered. In two of the three cases, a max-mean objective robust optimization was performed to address geological uncertainty arising from the mismatch between real physical reservoir and the reservoir model. We demonstrate that the performance of DE and PSO algorithms is dependent on the total number of function evaluations performed; importantly, we show that in all cases, HPSDE algorithm outperforms both DE and PSO algorithms. Based on the evidence of these findings, we hold the view that hybridized metaheuristic optimization algorithms (such as HPSDE) are applicable in this problem domain and could be potentially useful in other reservoir engineering problems.  相似文献   

4.
柴达木盆地英东地区地质综合评价及勘探目标优选   总被引:2,自引:0,他引:2  
通过对柴达木盆地英东地区构造断裂特征、烃源岩条件、沉积储层的地层发育特征、生储盖组合等地质条件综合分析、评价认为:英东地区油砂山、英东一号构造等中浅层圈闭落实,油源充足且具有良好的生储盖组合。同时砂33、砂34井试油已获得油气流,说明油气层有东扩的趋势。因此通过目标优选评价认为该区具有良好的勘探前景,目前通过砂37、40井等井钻探已发现英东一号油气田。  相似文献   

5.
Determining the optimum placement of new wells in an oil field is a crucial work for reservoir engineers. The optimization problem is complex due to the highly nonlinearly correlated and uncertain reservoir performances which are affected by engineering and geologic variables. In this paper, the combination of a modified particle swarm optimization algorithm and quality map method (QM + MPSO), modified particle swarm optimization algorithm (MPSO), standard particle swarm optimization algorithm (SPSO), and centered-progressive particle swarm optimization (CP-PSO) are applied for optimization of well placement. The SPSO, CP-PSO, and MPSO algorithms are first discussed, and then the modified quality map method is discussed, and finally the implementation of these four methods for well placement optimization is described. Four example cases which involve depletion drive model, water injection model, and a real field reservoir model, with the maximization of net present value (NPV) as the objective function are considered. The physical model used in the optimization analyses is a 3-dimensional implicit black-oil model. Multiple runs of all methods are performed, and the results are averaged in order to achieve meaningful comparisons. In the case of optimizing placement of a single producer well, it is shown that it is not necessary to use the quality map to initialize the position of well placement. In other cases considered, it is shown that the QM + MPSO method outperforms MPSO method, and MPSO method outperforms SPSO and CP-PSO method. Taken in total, the modification of SPSO method is effective and the applicability of QM + MPSO for this challenging problem is promising  相似文献   

6.
This paper proposes an augmented Lagrangian method for production optimization in which the cost function to be maximized is defined as an augmented Lagrangian function consisting of the net present value (NPV) and all the equality and inequality constraints except the bound constraints. The bound constraints are dealt with using a trust-region gradient projection method. The paper also presents a way to eliminate the need to convert the inequality constraints to equality constraints with slack variables in the augmented Lagrangian function, which greatly reduces the size of the optimization problem when the number of inequality constraints is large. The proposed method is tested in the context of closed-loop reservoir management benchmark problem based on the Brugge reservoir setup by TNO. In the test, we used the ensemble Kalman filter (EnKF) with covariance localization for data assimilation. Production optimization is done on the updated ensemble mean model from EnKF. The production optimization resulted in a substantial increase in the NPV for the expected reservoir life compared to the base case with reactive control.  相似文献   

7.
Aquifer systems are an important part of an integrated water resources management plan as foreseen in the European Union’s Water Framework Directive (2000). The sustainable development of these systems demands the use of all available techniques capable of handling the multidisciplinary features of the problems involved. The formulation and resolution of an optimization model is described for a planning and management problem based on the Palmela aquifer (Portugal), developed to supply a given number of demand centres. This problem is solved using one of the latest optimization techniques, the simulated annealing heuristic method, designed to find the optimal solutions while avoiding falling into local optimums. The solution obtained, providing the wells location and the corresponding pumped flows to supply each centre, are analysed taking into account the objective function components and the constraints. It was found that the operation cost is the biggest share of the final cost, and the choice of wells is greatly affected by this fact. Another conclusion is that the solution takes advantage of the economies of scale, that is, it points toward drilling a large capacity well even if this increases the investment cost, rather than drilling several wells, which together will increase the operation costs.  相似文献   

8.
大庆油田火山岩砾岩水平井钻井技术   总被引:1,自引:0,他引:1       下载免费PDF全文
随着大庆油田深层火山岩砾岩气藏的持续开发,利用水平井技术勘探开发深层气藏成为迫切要求。对大庆深层火山岩砾岩的地质特性、火山岩砾岩水平井特点及难点进行了描述。开展了钻头优选、井眼轨道优化、井身结构优化、井下动力钻具选型、欠平衡负压值控制等技术研究,并完成多口现场试验井,其中徐深平34井全井平均机械钻速2.79 m/h,取得了较好的应用效果。形成了一套适合于大庆油田火山岩砾岩气藏勘探与开发的水平井钻井技术。  相似文献   

9.
油基钻井液成本高昂,但对在复杂地层进行的海洋钻井而言,依然具有水基钻井液不可比拟的优势。针对南海西部油气田3个高难度钻井区块钻井过程中遇到的工程难题,给出了相应的油基钻井液体系配方、性能和维护方法;阐述了不同海域含油钻屑的处理方法。钻井实践证明,油基钻井液体系不仅是易坍塌井、高温高压井及老油田超低压调整井钻井作业顺利进行的重要保障,而且具有良好的储层保护性能,有利于油气田的勘探和开发。  相似文献   

10.
In conventional waterflooding of an oil field, feedback based optimal control technologies may enable higher oil recovery than with a conventional reactive strategy in which producers are closed based on water breakthrough. To compensate for the inherent geological uncertainties in an oil field, robust optimization has been suggested to improve and robustify optimal control strategies. In robust optimization of an oil reservoir, the water injection and production borehole pressures (bhp) are computed such that the predicted net present value (NPV) of an ensemble of permeability field realizations is maximized. In this paper, we both consider an open-loop optimization scenario, with no feedback, and a closed-loop optimization scenario. The closed-loop scenario is implemented in a moving horizon manner and feedback is obtained using an ensemble Kalman filter for estimation of the permeability field from the production data. For open-loop implementations, previous test case studies presented in the literature, show that a traditional robust optimization strategy (RO) gives a higher expected NPV with lower NPV standard deviation than a conventional reactive strategy. We present and study a test case where the opposite happen: The reactive strategy gives a higher expected NPV with a lower NPV standard deviation than the RO strategy. To improve the RO strategy, we propose a modified robust optimization strategy (modified RO) that can shut in uneconomical producer wells. This strategy inherits the features of both the reactive and the RO strategy. Simulations reveal that the modified RO strategy results in operations with larger returns and less risk than the reactive strategy, the RO strategy, and the certainty equivalent strategy. The returns are measured by the expected NPV and the risk is measured by the standard deviation of the NPV. In closed-loop optimization, we investigate and compare the performance of the RO strategy, the reactive strategy, and the certainty equivalent strategy. The certainty equivalent strategy is based on a single realization of the permeability field. It uses the mean of the ensemble as its permeability field. Simulations reveal that the RO strategy and the certainty equivalent strategy give a higher NPV compared to the reactive strategy. Surprisingly, the RO strategy and the certainty equivalent strategy give similar NPVs. Consequently, the certainty equivalent strategy is preferable in the closed-loop situation as it requires significantly less computational resources than the robust optimization strategy. The similarity of the certainty equivalent and the robust optimization based strategies for the closed-loop situation challenges the intuition of most reservoir engineers. Feedback reduces the uncertainty and this is the reason for the similar performance of the two strategies.  相似文献   

11.
As it stands, underbalanced drilling (UBD) operation has been beneficial in the exploration of hydrocarbons and production, with advantages like faster drilling control of lost circulation, stuck pipe situations, minimal or less formation damages and an enhanced ability to expedite development of brown fields. In spite of its edge over conventional drilling, the techniques can be more complex as well. Thus, a telemetry system is required to link downhole and surface while-drilling components transmitting and providing useful information under the real-time condition to the driller during drilling operations for more precise wellbore placement to ensure maximum reservoir exposure, ultimate production increment and monitoring conditions. A novel and systematic decision support system model based on distance-based approach has been developed for performance evaluation and optimal selection of while-drilling telemetry systems for the potential development of a depleted reservoir field. The proposed methodology attests to the need for the relative importance of criteria for a given application, without which inter-criterion comparison could not be accomplished. It requires a set of model selection criteria, along with available telemetry techniques and their level of criteria for optimal selection; and it successfully presents the results in terms of a merit value which is used to rank the while-drilling telemetry systems. This aims at delivering reliable drilling performance resulting to deliverable of real-time downhole data collection and most importantly places the matured well with minimal non-productive time during UBD operations. The scientific value of this study is the development of a simplified user-friendly decision support system for telemetry systems performance evaluation and selection optimization. The proposed framework was being validated and applied to a matured reservoir for an optimum selection of telemetry techniques in the UBD operation. The result of computations displayed similar results obtained by expert judgment demonstrating the significance effect and need for telemetry systems.  相似文献   

12.
雄安新区牛驼镇地热田主要储层为岩溶热储型,地层破碎、裂隙发育,钻进时多失返性漏失。以往的开发主要集中于1800m以浅,岩溶热储段长为300-500m,裸眼段较短,钻进施工较简单。为了加强对深部地热资源的探测,满足雄安新区规划建设的需求,开展了深部地热资源调查工作,主要目的层为雾迷山组和高于庄组,其存在的难点主要有岩溶热储层裸眼段长、地层破碎、长段漏失、上部地层稳定性差等。本文根据深部热储勘探井施工过程中钻遇问题及难点分析,对岩溶热储层深井钻进关键技术进行总结,提出了优化建议,具有一定的参考意义。  相似文献   

13.
陈业鹏 《探矿工程》2020,47(5):32-35,45
松南火山岩地层研磨性强、可钻性差,该区钻井施工机械钻速低、钻井周期长,且随着勘探开发的不断推进,火山岩裂缝性储层孔隙压力逐步降低,目前,开发井型主要以水平井为主,井漏问题突显,严重制约钻井提速。本文针对这一问题,从地质特点及钻井技术难点出发,结合近年来松南火山岩钻井技术的进展,对现有技术进行评价及优化,并通过现场应用结果,提出适合该地区后续钻井提速的措施及建议。  相似文献   

14.
During geothermal reservoir development, drilling deep boreholes turns out to be extremely expensive and risky. Thus, it is of great importance to work out the details of suitable borehole locations in advance. Here, given a set of existing boreholes, we demonstrate how a sophisticated numerical technique called optimal experimental design helps to find a location of an additional exploratory borehole that reduces risk and, ultimately, saves cost. More precisely, the approach minimizes the uncertainty when deducing the effective permeability of a buried reservoir layer from a temperature profile measured in this exploratory borehole. In this paper, we (1) outline the mathematical formulation in terms of an optimization problem, (2) describe the numerical implementation involving various software components, and (3) apply the method to a 3D numerical simulation model representing a real geothermal reservoir in northern Italy. Our results show that optimal experimental design is conceptually and computationally feasible for industrial-scale applications. For the particular reservoir and the estimation of permeability from temperature, the optimal location of the additional borehole coincides with regions of high flow rates and large deviations from the mean temperature of the reservoir layer in question. Finally, the presentation shows that, methodologically, the optimization method can be generalized from estimating permeability to finding any other reservoir properties.  相似文献   

15.
大牛地属于低压、低渗、低丰度的三低油气藏,能否实行优快钻井成为制约水平井发展的主要因素,通过对井身结构、钻具组合、钻头选型及泥浆体系结构等统计分析,总结出适合大牛地气田水平井优快钻井技术,形成了一套大幅度提高机械效率、缩短钻井周期,适合大牛地工区的优快钻井技术。  相似文献   

16.
We present a method to determine lower and upper bounds to the predicted production or any other economic objective from history-matched reservoir models. The method consists of two steps: 1) performing a traditional computer-assisted history match of a reservoir model with the objective to minimize the mismatch between predicted and observed production data through adjusting the grid block permeability values of the model. 2) performing two optimization exercises to minimize and maximize an economic objective over the remaining field life, for a fixed production strategy, by manipulating the same grid block permeabilities, however without significantly changing the mismatch obtained under step 1. This is accomplished through a hierarchical optimization procedure that limits the solution space of a secondary optimization problem to the (approximate) null space of the primary optimization problem. We applied this procedure to two different reservoir models. We performed a history match based on synthetic data, starting from a uniform prior and using a gradient-based minimization procedure. After history matching, minimization and maximization of the net present value (NPV), using a fixed control strategy, were executed as secondary optimization problems by changing the model parameters while staying close to the null space of the primary optimization problem. In other words, we optimized the secondary objective functions, while requiring that optimality of the primary objective (a good history match) was preserved. This method therefore provides a way to quantify the economic consequences of the well-known problem that history matching is a strongly ill-posed problem. We also investigated how this method can be used as a means to assess the cost-effectiveness of acquiring different data types to reduce the uncertainty in the expected NPV.  相似文献   

17.
针对苏里格气田盒8岩性气藏储层横向变化大、非均质性强、储层预测难度大的特点,利用二维地震资料,通过AVO远近道集叠加振幅分析、波阻抗反演和属性分析方法,进行盒8储层岩性及含气性综合预测。根据预测结果优选的开发评价井钻井结果良好,对低渗透砂岩储层岩性及含气性预测,能够进一步提高储层含气性预测的可靠性和开发评价井的预测成功率。   相似文献   

18.
在四川施工了5口煤层气井(其中参数井4口),各项参数反映四川煤层气具备了开发和小井网试采的储层条件。但在施工中存在钻探进度慢、测试坐封选层难、井斜控制难、煤层对比和采取率不甚理想、煤储层污染严重等问题。通过分析,提出采用“三开”井身结构、防斜打直、进一步开展大口径绳索取心的攻关、储层保护等建议,以推进四川煤层气的勘探开发中钻探技术上的保证。  相似文献   

19.
随着东海对深部致密储层油气资源的勘探开发,深井、超深井钻井面临的地层埋藏深、压力体系复杂、地层可钻性差、裸眼段长、井斜大等难题,需要研究可行的技术方案加以解决。为此,2012年以来,在东海实施的深井、超深井中,通过应用深井井身结构优化、高效抗摩减阻剂、动力导向和复合冲击提速技术、井口回注固井技术和随钻声波固井质量评价技术,实现了安全、快速的钻井效果。上述技术的应用对致密地层钻进、提高钻井速度、缩短钻井周期、降低作业成本、获得更好的经济效益,具有重要的保障作用。  相似文献   

20.
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号