首页 | 本学科首页   官方微博 | 高级检索  
相似文献
 共查询到20条相似文献,搜索用时 78 毫秒
1.
In situ turbidity meters are being increasingly used to generate continuous records of suspended sediment concentration in rivers. However, the usefulness of the information obtained depends heavily on the existence of a close relationship between fluctuations in suspended sediment concentration and turbidity and the calibration procedure that relates suspended sediment concentration to the turbidity meter's signal. This study assesses the relationship between suspended sediment concentration and turbidity for a small (1·19 km2) rural catchment in southern Brazil and evaluates two calibration methods by comparing the estimates of suspended sediment concentration obtained from the calibrated turbidity readings with direct measurements obtained using a USDH 48 suspended sediment sampler. With the first calibration method, the calibration relationship is derived by relating the turbidity readings to simultaneous measurements of concentration obtained from suspended sediment samples collected from the vicinity of the turbidity probe during flood events. With the second method, the calibration is based on the readings obtained from the turbidity meter when the probe immersed in samples of known concentration prepared using soils collected from the catchment. Overall, there was a close link between fluctuations in suspended sediment concentration and turbidity in the stream at the outlet of the catchment, and the estimates of sediment concentration obtained using the first calibration method corresponded closely with the conventionally measured sediment concentrations. However, use of the second calibration method introduced appreciable errors. When the estimated sediment concentrations were compared with the measured values, the mean errors were ± 122 mg l?1 and + 601 mg l?1 for the first and second calibration procedures respectively. Copyright © 2007 John Wiley & Sons, Ltd.  相似文献   

2.
This paper describes delta development processes with particular reference to Cimanuk Delta in Indonesia. Cimanuk river delta, the most rapidly growing river delta in Indonesia, is located on the northern coast of Java Island. The delta is subject to ocean waves of less than 1 m height due to its position in the semi‐enclosed Java Sea in the Indonesian archipelago. The study has been carried out using a hydrodynamic model that accounts for sediment movement through the rivers and estuaries. As an advanced approach to management of river deltas, a numerical model, namely MIKE‐21, is used as a tool in the management of Cimanuk river delta. From calibration and verification of hydrodynamic model, it was found that the best value of bed roughness was 0·1 m. For the sediment‐transport model, the calibration parameters were adjusted to obtain the most satisfactory results of suspended sediment concentration and volume of deposition. By comparing the computed and observed data in the calibration, the best values of critical bed shear stress for deposition, critical bed shear stress for erosion and erosion coefficient were 0·05 N m?2, 0·15 N m?2, and 0·00001 kg m?2 s?1, respectively. The calibrated model was then used to analyse sensitivity of model parameters and to simulate delta development during the periods 1945–1963 and 1981–1997. It was found that the sensitive model parameters were bed shear stresses for deposition and erosion, while the important model inputs were river suspended sediment concentration, sediment characteristics and hydrodynamic. The model result showed reasonable agreement with the observed data. As evidenced by field data, the mathematical model proves that the Cimanuk river delta is a river‐dominated delta because of its protrusion pattern and very high sediment loads from the Cimanuk river. It was concluded that 86% of sediment load from the Cimanuk river was deposited in the Cimanuk delta. Copyright © 2008 John Wiley & Sons, Ltd.  相似文献   

3.
The suspended sediment flux field in the Yellow and East China Seas(YECS) displays its seasonal variability.A new method is introduced in this paper to obtain the flux field via retrieval of ocean color remote sensing data,statistical analysis of historical suspended sediment concentration data,and numerical simulation of three-dimensional(3D) flow velocity.The components of the sediment flux field include(i) surface suspended sediment concentration inverted from ocean color remote sensing data;(ii) vertical distribution of suspended sediment concentration obtained by statistical analysis of historical observation data;and(iii) 3D flow field modeled by a numerical simulation.With the improved method,the 3D suspended sediment flux field in the YECS has been illustrated.By comparison with the suspended sediment flux field solely based on the numerical simulation of a suspended sediment transport model,the suspended sediment flux field obtained by the improved method is found to be more reliable.The 3D suspended sediment flux field from ocean colour remote sensing and in situ observation are more closer to the reality.Furthermore,by quantitatively analyzing the newly obtained suspended sediment flux field,the quantity of sediment erosion and deposition within the different regions can be evaluated.The sediment exchange between the Yellow Sea and the East China Sea can be evident.The mechanism of suspended sediment transport in the YECS can be better understood.In particular,it is suggested that the long-term transport of suspended sediment is controlled mainly by the circulation pattern,especially the current in winter.  相似文献   

4.
考虑采砂影响的鄱阳湖丰水期悬浮泥沙浓度模拟   总被引:4,自引:1,他引:3  
针对受采砂活动影响显著的鄱阳湖高浑浊水体,结合数值模拟和遥感技术,利用已有的鄱阳湖采砂区遥感监测结果,在构建的鄱阳湖水动力-悬浮泥沙输移模型中添加泥沙点源,对2011年7月1-31日采砂影响下的鄱阳湖丰水期悬浮泥沙浓度进行数值模拟.利用悬浮泥沙浓度实测数据和MODIS影像反演结果对模拟结果的有效验证表明,考虑采砂影响后,悬浮泥沙浓度模拟值与实测值具有强相关关系,确定性系数为0.831,均方根误差为15.5 mg/L,悬浮泥沙浓度空间分布趋势与遥感反演结果基本一致.模拟结果显示,采砂活动对鄱阳湖南部主湖区、河流入湖口影响较小,其主要影响由南向北,经棠荫以西和松门山岛以北航道、入江水道延伸到湖口区域,是鄱阳湖北湖区高浑浊水体形成的重要原因.  相似文献   

5.
The wide range of studies describing the role of bank erosion in fluvial sediment supply have mostly lumped amounts of bank erosion into coarse temporal units, such as years. This paper investigates sediment yields from individual bank erosion events within the upper River Severn, UK (basin area 380 km2). Manual erosion pins and photo-electronic erosion pins were used to estimate bank erosion, and turbidity meters were used to determine suspended sediment transport. At the annual time-scale, the silt-clay fraction of bank-derived sediment accounted for an equivalent of 17 per cent of the suspended load, increasing to an average of 38 per cent at the monthly timescale, and then to an average of 64 per cent at the event timescale. This research highlighted that for an upland catchment, bank erosion was an important supply of suspended sediment, and that for some flood events bank erosion can supply more sediment than is transported. © 1997 John Wiley & Sons, Ltd.  相似文献   

6.
Z. X. Xu  J. P. Pang  C. M. Liu  J. Y. Li 《水文研究》2009,23(25):3619-3630
The Soil and Water Assessment Tool (SWAT) was used to simulate the transport of runoff and sediment into the Miyun Reservoir, Beijing in this study. The main objective was to validate the performance of SWAT and the feasibility of using this model as a simulator of runoff and sediment transport processes at a catchment scale in arid and semi‐arid area in North China, and related processes affecting water quantity and soil erosion in the catchment were simulated. The investigation was conducted using a 6‐year historical streamflow and sediment record from 1986 to 1991; the data from 1986 to 1988 was used for calibration and that from 1989 to 1991 for validation. The SWAT generally performs well and could accurately simulate both daily and monthly runoff and sediment yield. The simulated daily and monthly runoff matched the observed values satisfactorily, with a Nash‐Sutcliffe coefficient of greater than 0·6, 0·9 and a coefficient of determination 0·75, 0·9 at two outlet stations (Xiahui and Zhangjiafen stations) during calibration. These values were 0·6, 0·85 and 0·6, 0·9 during validation. For sediment simulation, the efficiency is lower than that for runoff. Even so, the Nash‐Sutcliffe coefficient and coefficient of determination were greater than 0·48 and 0·6 for monthly sediment yield during calibration, and these values were greater than 0·84 and 0·95 during validation. Sensitivity analysis shows that sensitive parameters for the simulation of discharge and sediment yield include curve number, base flow alpha factor, soil evaporation compensation factor, soil available water capacity, soil profile depth, surface flow lag time and channel re‐entrained linear parameter, etc. Copyright © 2009 John Wiley & Sons, Ltd.  相似文献   

7.
Turbidity monitoring and rainfall and runoff simulation experiments were conducted at a newly constructed unsealed road stream crossing to determine the quantity and sources of sediment entering the stream. Continuous measurements of turbidity and estimation of total suspended solids (TSS) concentration upstream and downstream of the stream culvert were taken over a 5 month period. There was a statistically significant difference in turbidity and TSS downstream of the crossing during baseflow conditions, but the quality of the water column remained good during non‐rain periods. Rainfall events comprised around 20% of the observation period and led to decreases in water quality downstream of the crossing. Water quality could be considered as degraded for 10% of the observations. This was during a period when the rainfall was 65% of the long‐term average. Calculated suspended sediment loads were 0·78 t upstream and 2·77 t downstream, an increase of 3·5. It was estimated that at least 2–3 t of bedload material was also added to the stream during the crossing construction and from subsequent erosion. This material is a deposit on the cobble stream bed, and is most likely to degrade aquatic ecosystem values. Rainfall and runoff simulation revealed the principal sediment sources to be a fillslope that contributed coarse bedload material through rill erosion and unprotected toe scour, and the unmetalled road verge that provided fines. Although the quality of water column was good for the majority of the observations, the new Australian and New Zealand Water Quality Guidelines for Fresh and Marine Waters suggest this site exceeded ‘trigger levels’ that would warrant further investigation for both the water column and the bed deposits. Copyright © 2002 John Wiley & Sons, Ltd.  相似文献   

8.
The behaviour of suspended sediment in rivers is often a function of energy conditions, i.e. sediment is stored at low flow and transported under high discharge conditions. The timing of maximum sediment transport can, however, also be related to mixing and routing of water and sediment from different sources. In this study suspended sediment transport was studied in the River Rhine between Kaub and the German–Dutch border. As concentrations decrease over a runoff season and as the relationship between water discharge and suspended sediment concentrations during most floods is characterized by clockwise hysteresis, it is concluded that sediment depletion occurs during a hydrological year and during individual floods. However, analyses of the sediment contribution from the River Mosel indicate that clockwise hysteresis may result from sediment depletion as well as from early sediment supply from a tributary. Thus, although the suspended sediment behaviour in the downstream part of the River Rhine is partly a transport phenomenon related to energy conditions, mixing and routing of water from different sources also plays an important role. Suspended sediment transport during floods was modelled using a ‘supply‐based’ model. Addition of a sediment supply term to the sediment rating curve leads to a model that produces better estimates of instantaneous suspended sediment concentrations during high discharge events. A major constriction of the model is that it cannot be used to predict suspended sediment concentrations as long as the amount of sediment in storage and the timing of sediment supply are unknown. Copyright © 1999 John Wiley & Sons, Ltd.  相似文献   

9.
Unpaved roads are believed to be the primary source of terrigenous sediments being delivered to marine ecosystems around the island of St John in the eastern Caribbean. The objectives of this study were to: (1) measure runoff and suspended sediment yields from a road segment; (2) develop and test two event‐based runoff and sediment prediction models; and (3) compare the predicted sediment yields against measured values from an empirical road erosion model and from a sediment trap. The runoff models use the Green–Ampt infiltration equation to predict excess precipitation and then use either an empirically derived unit hydrograph or a kinematic wave to generate runoff hydrographs. Precipitation, runoff, and suspended sediment data were collected from a 230 m long, mostly unpaved road segment over an 8‐month period. Only 3–5 mm of rainfall was sufficient to initiate runoff from the road surface. Both models simulated similar hydrographs. Model performance was poor for storms with less than 1 cm of rainfall, but improved for larger events. The largest source of error was the inability to predict initial infiltration rates. The two runoff models were coupled with empirical sediment rating curves, and the predicted sediment yields were approximately 0·11 kg per square meter of road surface per centimetre of precipitation. The sediment trap data indicated a road erosion rate of 0·27 kg m?2 cm?1. The difference in sediment production between these two methods can be attributed to the fact that the suspended sediment samples were predominantly sand and silt, whereas the sediment trap yielded mostly sand and gravel. The combination of these data sets yields a road surface erosion rate of 0·31 kg m?2 cm?1, or approximately 36 kg m?2 year?1. This is four orders of magnitude higher than the measured erosion rate from undisturbed hillslopes. The results confirm the importance of unpaved roads in altering runoff and erosion rates in a tropical setting, provide insights into the controlling processes, and provide guidance for predicting runoff and sediment yields at the road‐segment scale. Copyright © 2006 John Wiley & Sons, Ltd.  相似文献   

10.
High‐frequency water discharge and suspended sediment concentration (SSC) databases were collected for 3 years on four contrasted watersheds: the Asse and the Bléone (two Mediterranean rainfall regime watersheds) and the Romanche and the Ferrand (two rainfall–snowmelt regime watersheds). SSCs were calculated from turbidity recordings (1‐h time step), converted into SSC values. The rating curve was calculated by means of simultaneous SSC measurement taken by water sampling and turbidity recording. Violent storms during springtime and autumn were responsible for suspended sediment transport on the Asse and the Bléone rivers. On the Ferrand and the Romanche, a large share of suspended sediment transport was also caused by local storms, but 30% of annual fluxes results from snowmelt or icemelt which occurred from April to October. On each watershed, SSC up to 50 g l?1 were observed. Annual specific fluxes ranged from 450 to 800 t km?2 year?1 and 40–80% of annual suspended sediment fluxes occurred within 2% of the time. These general indicators clearly demonstrate the intensity of suspended sediment transport on these types of watersheds. Suspended sediment fluxes proved to be highly variable at the annual scale (inter‐annual variability of specific fluxes) as well as at the event scale (through a hysteresis loop in the SSC/Q relationship) on these watersheds. In both cases, water discharge and precipitations were the main processes involved in suspended sediment production and transport. The temporal and spatial variability of hydro‐meteorological processes on the watershed provides a better understanding of suspended sediment dynamics. Copyright © 2009 John Wiley & Sons, Ltd.  相似文献   

11.
The efficacy of in‐stream nephelometric turbidometry as a surrogate for total suspended solids (TSS) and total phosphorus (TP) concentrations was evaluated for use in low turbidity (<50 NTU) subalpine watersheds at Lake Tahoe, California–Nevada, USA. Continuous turbidity records for the 1999, 2000 and 2001 snowmelt seasons and data from water quality samples (1982–2000) were examined to determine watershed sediment delivery dynamics. Strong correlations were found between turbidity and both TSS and TP concentration. The strong correlation indicates that turbidity can serve as a good surrogate for direct measurement in these watersheds. The watersheds displayed clockwise hysteresis: sediment flushing and depletion, on daily, seasonal and decadal time‐scales. The hysteresis curves had strong concave shapes, indicating a sensitive response to peak flow. A pronounced seasonal trend was observed for the ratio of suspended sediment concentration (SSC)/discharge over time, indicating early season flushing of available sediment. Significant linear relationships (p < 0·05) were found for 12 of 17 years. Comparison of annual sediment rating curve coefficients indicated smaller coefficients during high sediment loading years and in the years following. The smaller coefficients are evidence of sediment depletion during high flow years. The effect of hysteresis on monitoring methods was illustrated by comparing turbidity estimates of TSS load with sediment rating curve estimates of SSC. After accounting for differences in SSC/TSS methods of analysis, daily loads calculated with turbidity methods were 58–98% of rating curve estimates for the spring snowmelt seasons of 1999–2001. Copyright © 2006 John Wiley & Sons, Ltd.  相似文献   

12.
Despite widespread bench‐terracing, stream sediment yields from agricultural hillsides in upland West Java remain high. We studied the causes of this lack of effect by combining measurements at different spatial scales using an erosion process model. Event runoff and sediment yield from two 4‐ha terraced hillside subcatchments were measured and field surveys of land use, bench‐terrace geometry and storage of sediment in the drainage network were conducted for two consecutive years. Runoff was 3·0–3·9% of rainfall and sediment yield was 11–30 t ha−1 yr−1 for different years, subcatchments and calculation techniques. Sediment storage changes in the subcatchment drainage network were less than 2 t ha−1, whereas an additional 0·3–1·5 t ha−1 was stored in the gully between the subcatchment flumes and the main stream. This suggests mean annual sediment delivery ratios of 86–125%, or 80–104% if this additional storage is included. The Terrace Erosion and Sediment Transport (TEST) model developed and validated for the studied environment was parameterized using erosion plot studies, land use surveys and digital terrain analysis to simulate runoff and sediment generation on the terraced hillsides. This resulted in over‐estimates of runoff and under‐estimates of runoff sediment concentration. Relatively poor model performance was attributed to sample bias in the six erosion plots used for model calibration and unaccounted covariance between important terrain attributes such as slope, infiltration capacity, soil conservation works and vegetation cover. Copyright © 2005 John Wiley & Sons, Ltd.  相似文献   

13.
The Himalayan environment has, until recently, been perceived to be in a critical state of environmental decline, resulting from rapid population growth and associated land‐use change. Recent research, however, has emphasized the difficulty of developing an objective appraisal of the state of the environment in a region where empirical data are scarce and unstructured and where an understanding of the spatial and temporal dynamics of natural environmental processes remains highly uncertain. This paper presents results from an intensive three‐year project designed to help address the regional empirical deficit, establish detailed baseline environmental data and to gain an insight into storm period and seasonal suspended sediment dynamics. The instrumentation, calibration and analysis of high‐frequency infrared turbidimetric records from a number of small subcatchments in the Nepal Middle Hills are reported. Storm period and seasonal variation in turbidity and suspended sediment are examined and hysteresis patterns explored and explained. A variety of methods to estimate seasonal suspended sediment yield in a mixed land‐use catchment are examined, and found to vary by up to a factor of five. Despite the inherent uncertainty, all estimates of catchment sediment yield are found to be high with respect to erosion plot studies from the local area, and this suggests the importance of riparian and channel erosion as major sediment sources, a finding consistent with other regional studies. Copyright © 2000 John Wiley & Sons, Ltd.  相似文献   

14.
《国际泥沙研究》2020,35(1):79-90
Flash floods are the highest sediment transporting agent,but are inaccessible for in-situ sampling and have rarely been analyzed by remote sensing technology.Laboratory and field experiments were done to develop linear spectral unmixing(LSU) remote sensing model and evaluate its performance in simulating the suspended sediment concentration(SSC) in flash floods.The models were developed from continuous monitoring in the laboratory and the onsite spectral signature of river bed sediment deposits and flash floods in the Tekeze River and in its tributary,the Tsirare River.The Pearson correlation coefficient was used to determine the variability of correlations between reflectance and SSCs.The coefficient of determination(R2) and root mean square of error(RMSE) were used to evaluate the performance of the generated models.The results found that the Pearson correlation coefficient between SSCs and reflectance varied based on the level of the SSCs,geological colors,and grain sizes.The performance of the LSU model and empirical remote sensing approaches were computed to be R2=0.92,and RMSE=±0.76 g/1 in the Tsirare River and R2=0.91,and RMSE=±0.73 g/1 in the Tekeze River and R2=0.81,RMSE=±2.65 g/l in the Tsirare river and R2=0.76,RMSE=±10.87 g/l in the Tekeze River,respectively.Hence,the LSU approach of remote sensing was found to be relatively accurate in monitoring and modeling the variability of SSCs that could be applied to the upper Tekeze River basin.  相似文献   

15.
Hugh G. Smith 《水文研究》2008,22(16):3135-3148
Historically upland headwater catchments in south‐eastern Australia have undergone extensive gully erosion that has removed large amounts of sediment to lowlands. Recent research suggests these upland areas may continue to dominate fine sediment loads in lowland rivers. Improved understanding of sediment transfer through upland headwater catchments may have implications for interpreting downstream sediment supply. In this study a nested catchment design was utilized to examine suspended sediment yields and delivery from a small tributary sub‐catchment (1·64 km2) to the study catchment outlet (53·5 km2). Monitoring of suspended sediment concentration and discharge was undertaken for a period of nearly two years and used to estimate suspended sediment loads. Estimated total suspended sediment exports over the period of monitoring were 24·16 t from the sub‐catchment and 550·3 t from the catchment, which are generally less than previous reported small catchment yields in south‐eastern Australia. The extent of sediment delivery was examined using between‐site ratios of specific sediment yield per unit area and incised channel length. Sediment delivery was high under average rainfall conditions, but seasonally dependent. Both suspended sediment yields and the extent of delivery peaked over spring months, supplemented by remobilization of sediment stored during summer months in the main catchment channel. The findings of this study suggest much of the suspended sediment exported from small incised upland sub‐catchments (1–2 km2) may be delivered to downstream reaches under average rainfall conditions, which, in conjunction with the findings of previous research supports the potential importance of contributions from these areas to suspended sediment loads in lowland rivers during high flow periods. Copyright © 2007 John Wiley & Sons, Ltd.  相似文献   

16.
The suspended sediment yields of two adjacent, paired, catchments on blanket peat in mid-Wales were compared before and after preafforestation drainage works. Catchment A was ploughed whilst an adjacent catchment (B) was left unploughed. After eight months Catchment B was also ploughed. The ploughing strategy in both catchments was designed to minimize sediment loss. However, suspended sediment loss increased 2·5 times following ploughing in Catchment A, whilst no such increase occurred at this time in Catchment B. Subsequently, suspended sediment yields in Catchment B increased 4·8 times after it was ploughed. Organic sediment was lost mainly from furrow sides, and erosion pins showed maximum ground recession in summer, due to peat wastage. Summer desiccation prepared sediment for transport, and organic suspended sediment loads were highest in the autumn. Sediment loads were limited by vegetation colonization and some reduction in sediment loss was due to the presence of unploughed strips adjacent to stream courses.  相似文献   

17.
Accurately measuring sediment flux in large rivers remains a challenge due to the spatial and temporal cross‐sectional variability of suspended sediment concentrations in conjunction with sampling procedures that fail to accurately quantify these differences. This study presents a field campaign methodology that can be used to improve the measurement of suspended sediment concentrations in the Amazon River or similarly large rivers. The turbidity signal and Rouse model are together used in this study to define the spatial distribution of suspended sediment concentrations in a river cross‐section, taking into account the different size fractions of the sediment. With this methodology, suspended sediment fluxes corresponding to each sediment class are defined with less uncertainty than with manual samples. This paper presents an application of this methodology during a field campaign at different gauging stations along a 3,000‐km stretch of the Solimões/Amazon River during low water and flood periods. Vertical concentration profiles and Rouse model applications for distinctive sediment sizes are explored to determine concentration gradients throughout a cross‐section of the river. The results show that coupling both turbidity technology and the Rouse model may improve our understanding of the spatial distribution of different sediments fractions sizes in the Solimões/Amazon River. These data are very useful in defining a pertinent monitoring strategy for suspended sediment concentrations in the challenging context of large rivers.  相似文献   

18.
悬浮泥沙是重要的水质参数之一.应用遥感技术监测悬浮泥沙,学者们提出了众多的悬浮泥沙遥感的经验模型和推导模型.但在缺乏大气参数或没有足够实测数据的情况下,这些模式的精度和准确性得不到保证.针对这种情况,以巢湖为实验区,对三景的巢湖卫星遥感数据进行了如下的数据处理:(1)利用内部平均相对反射率法进行图像的大气校正,得到的相对反射率与真实反射率具有相似的波谱特征;(2)对图像进行了水体提取、二值化、掩膜处理,并通过湖泊泥沙指数SI=(TM2 TM3)/(TM2/TM3)提取了TM数据下的泥沙信息,得到水体含沙量图;(3)按照本文提出的基于遥感图像的不同浓度等级泥沙的划分依据,在泥沙指数图上进行密度分割处理,得到了巢湖泥沙相对浓度分布图.在上述的处理基础上,利用谱间关系法对巢湖水体进行准确提取;结果表明,与实测资料对比,巢湖泥沙相对浓度分布与验证数据一致,实测数据和SI值相关系数为0.89(置信度水平在0.001),表明泥沙指数方法可以直观和定量地反映悬浮泥沙相对浓度的分布与变化;研究结果显示,1987-2000年间,巢湖高浓度悬浮泥沙范围增大了约1.5倍.通过影像差值图清楚地识别出变化区域,主要位于西湖的中心、河口入湖区和东湖的南岸,这种变化的最主要原因是由于各入湖河流携带的大量悬浮泥沙进入水体,其次是岸坡崩塌物形成的.  相似文献   

19.
《国际泥沙研究》2020,35(6):659-665
A turbidity current is a particle-laden current driven by density differences due to suspended sediment particles. Turbidity currents can transport large amounts of sediment down slopes over great distances, and play a significant role in fluvial, lake and submarine systems. To better understand the sediment transport process, the flow system of an experimentally produced turbidity current in an inclined flume was investigated using video processing. We observed that the current progresses with constant frontal velocity and maintains an unchanged global interface geometry. In addition, the spatio-temporal profiles of the inner mean and turbulence velocity obtained by ultrasound velocity profiler (UVP) showed that similar distributions were maintained, with low dissipation. The results indicate that the turbidity current progressed in a quasi-stationary state, which enabled long-distance sediment transport. To understand the mechanisms behind the quasi-stationary flow, we analyzed the forces acting on the turbidity current. We found that under particular densities of suspended particles, the gravitational force is balanced by the viscous forces along the slope direction. We conclude that this specific force balance induces the quasi-stationary flow structure, enabling the long-distance transport of a substantial amount of sediment downstream with low dissipation.  相似文献   

20.
In this paper, we analyse how the performance and calibration of a distributed event‐based soil erosion model at the hillslope scale is affected by different simplifications on the parameterizations used to compute the production of suspended sediment by rainfall and runoff. Six modelling scenarios of different complexity are used to evaluate the temporal variability of the sedimentograph at the outlet of a 60 m long cultivated hillslope. The six scenarios are calibrated within the generalized likelihood uncertainty estimation framework in order to account for parameter uncertainty, and their performance is evaluated against experimental data registered during five storm events. The Nash–Sutcliffe efficiency, percent bias and coverage performance ratios show that the sedimentary response of the hillslope in terms of mass flux of eroded soil can be efficiently captured by a model structure including only two soil erodibility parameters, which control the rainfall and runoff production of suspended sediment. Increasing the number of parameters makes the calibration process more complex without increasing in a noticeable manner the predictive capability of the model. Copyright © 2015 John Wiley & Sons, Ltd.  相似文献   

设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号