1.
姜谙男  陈勇 《岩土力学》2007,28(4):774-778
露天底境界顶柱优化是露天转井下过渡时期的重要课题,该优化问题包括多个决策变量和多个评价指标,已有方法的优化效果不够理想。针对露天转井下境界顶柱优化特点,将遗传算法与三维数值模拟相结合,研究了境界顶柱全局优化的进化数值模拟方法,给出优化的指标和步骤,并将该方法用于大杏山铁矿的露天转井下境界顶柱的优化。工程应用表明所提出的井下境界顶柱优化方法是可行的。获得的最优方案对该矿山露天转井下的采矿设计具有指导作用。  相似文献   

2.
The study of rock pillar failure mechanisms is an issue that is faced routinely in mining and civil industries. In mining operation, the establishment of several mining levels is often necessary to ensure adequate production. This result in the formation of pillars that must be recovered under often high stress conditions at later stages of excavation. It is, therefore, beneficial to develop guidelines that can be used in the design of rock pillars. The aim of this paper is to delve into the mechanisms involved in pillar failure as well as to investigate the non-linear behavior of rock pillars. An extensive numerical analysis was carried out to study the pillar deformation and failure process under natural loading conditions. Effects of pillar geometry and pillar strength parameters on pillar behavior were investigated for hard rock material typical of Canadian mining conditions. Numerical data were compared against field data recorded in Canadian mines. A fairly good match was achieved between numerical and field data and the conducted analysis can be used as a qualitative guideline in the design of rock pillars in underground structures.  相似文献   

3.
采前煤柱稳定性研究是工作面冲击危险性评估和开采方案设计的关键。以山东某矿深井巨厚砾岩条件工作面开采遗留煤柱为背景,采用案例调研、理论分析、数值模拟和工程实践等方法,对巨厚岩层-煤柱协同变形机制及其煤柱稳定性进行了研究,建立了巨厚岩层-煤柱协同变形的简化力学模型,探讨了引起煤柱变形的主要应力来源和变形形式,推导了在协同变形条件下煤柱的应力-应变关系。以此为基础,综合煤柱煤体应力、围岩稳定性和变形特征等条件,提出了煤柱整体失稳的力学判据。研究结果表明:巨厚岩层-煤柱失稳诱发冲击与煤柱的位置、尺寸和上覆岩层运动或变形关系密切,上覆岩层运动或变形是诱发煤柱失稳的动力因素;巨厚岩层-煤柱的变形主要包括受集中力F压迫的协同挠曲压缩变形和受集中力G作用的重力沉降变形,二者保持内在协调性;巨厚岩层下煤柱整体失稳的工程判据为煤柱煤体平均支承应力p超过其平均极限支承强度Rc(p≥Rc);评估得到遗留的50 m煤柱具有强冲击危险性,并通过优化开采设计,取得了良好的效果。该研究成果对相似条件煤柱留设及其稳定性分析具有参考意义。  相似文献   

4.
This paper described a technique for obtaining three-dimensional mine design information using a two-dimensional finite element program where the mining geometry consists of an extensive array of underground rooms and pillars. The technique is based upon a simple augmentation of forces in a two-dimensional analysis to produce the same average pillar stress that would occur in a full three dimensional analysis. Detailed comparisons between a three-dimensional analysis, a two-dimensional analysis (plane stress and plane strain) and an augmented two-dimensional analysis (also plane stress and plane strain) of stress about a typical coal mine pillar are presented. A local factor of safety is defined and then mapped over the pillar midplane, the immediate roof and immediate floor using the results from the full three-dimensional analysis. Comparisons of roof and pillar safety factor distributions obtained by the three-dimensional, two-dimensional and augmented two-dimensional analyses show that the minimum safety factors in the pillar (at the pillar sides) are predicted quite closely by the augmented two-dimensional techniqe (plane stress). The same is true of the immediate roof, although the three-dimensional safety factor tends to be higher in the roof (over the room) than that calculated by the augmented twodimensional technique. The augmented loading procedure appears to hold considerable promise as a very efficient and cost reducing techniqe for mine pillar design.  相似文献   

5.
急倾斜煤柱开采后对巷道影响的数值模拟   总被引:4,自引:0,他引:4  
为提高煤炭的回收率和经济效益,针对长沟峪煤矿4槽煤柱,应用ANSYS有限元软件对-230~-310水平的煤柱开采前后进行数值模拟,得出:(1)煤柱开采以后,煤岩体总体下沉,但对-140水平巷道影响较小。(2)开采后,煤柱的中间部位是转折区,煤柱中部以上主应力减小,属于安全区域;煤柱中部以下主应力增大,随深度的增加,主应力增大;-320水平附近煤柱采后的主应力是采前的2倍多,是煤柱开采后主应力最大的地方,所以开采此区域为相对重点注意区域。(3)煤柱开采后-140水平的煤柱附近主应力增大,是没开采前的1.6倍,也是煤柱开采后主应力较大的地方,开采前要适当对-140水平煤柱附近进行加固。数值模拟得出结果和实际开采吻合较好,因此急倾斜煤柱开采后对巷道影响的数值模拟对开采有一定的指导意义。  相似文献   

6.
许磊  魏海霞  肖祯雁  李博 《岩土力学》2015,36(2):561-568
选取某煤矿近距离煤层为工程背景,采用FLAC3D模拟了8#煤层残余煤柱底板偏应力场分布特征。结果表明:(1)底板的偏应力呈扩散状向底板传递,距离煤柱越远扩散范围越广,煤柱边缘偏应力呈45°向底板传播;(2)煤柱较窄时,中线和边缘处偏应力影响深度浅,随煤柱宽度增加,底板偏应力变化和影响深度较大,当煤柱宽度足够大时,影响深度又变浅,中部趋于原岩应力;(3)同一水平面上,偏应力呈马鞍状分布,随煤柱宽度增加,煤柱中线处和边缘处偏应力经历了先增大后减小的过程,煤柱边缘处偏应力峰值位置变化不大;(4)同一煤柱宽度,煤柱边缘偏应力峰值向深部递减且趋势减慢,同时,峰值远离煤柱且趋势加快。在自由边界受均布载荷、底板垂直应力、水平应力、切应力解析解的基础上,推导了底板偏应力解析公式,解析与模拟结果基本吻合。具体到该工程的地质条件,9205轨道巷距离煤柱边缘20 m、9205回风巷在煤柱边缘、9205运输巷在煤柱中线处,9205轨道巷维护效果最好,证明了内错式巷道且距离煤柱足够远时,偏应力较小,宏观应力环境更适合巷道围岩自稳。  相似文献   

7.
特厚煤层小煤柱沿空掘巷数值分析及应用   总被引:1,自引:0,他引:1  
彭林军  张东峰  郭志飚  段庆伟 《岩土力学》2013,34(12):3609-3616
沿空掘巷开采技术成功的关键主要取决于采场覆岩稳定的时间和沿空掘巷的位置。采场采动岩体运动导致围岩应力重新分布,动态采场应力作用于围岩并使其状态发生灾变是发生矿山灾害的根本原因。特厚煤层分层综采巷道布置(包括内错、外错和垂直),合理确定煤柱尺寸、巷道支护方式和参数选择能够最大可能发挥围岩的自承能力,是提高巷道稳定的重要保证。在稳定的内应力场范围内布置小煤柱护巷,能够明显提高巷道围岩稳定状态,减少巷道维护费用。通过理论分析、数值模拟和现场实测等方法,对特厚煤层下分层沿空掘巷小煤柱不同巷道布置设计,通过煤柱的应力、应变和位移进行对比分析,确定特厚煤层下分层沿空掘巷合理的巷道位置和煤柱尺寸及上覆岩层防控技术,并得到工程验证是正确可靠的,从而为特厚煤层小煤柱开采技术提供了重要的科学依据。  相似文献   

8.
低标号充填体对采矿环境结构稳定性作用机制研究   总被引:2,自引:0,他引:2  
陈庆发  周科平 《岩土力学》2010,31(9):2811-2816
运用ADINA有限元分析软件,计算分析了3种不同充填高度时的低标号充填体对采矿环境结构稳定性的作用机制。结果显示,分层内随着充填高度增加,结构稳定性具有如下规律:(1)人工顶柱拉应力最大值逐步降低,受力状况逐步得到改善;(2)人工矿柱拉应力首先转化为压应力,然后逐步增大,承载能力逐步得到提高,但达到某一充填高度后,人工矿柱的承载能力增长缓慢,继续充填对提高矿柱承载能力意义不大;(3)人工底柱由受矿柱的挤压作用转变为受充填体的重力作用,拉应力最大值呈现先降低后上升变化规律。综合考虑经济、安全等因素,低标号充填体存在一个最合理的充填高度(2.8 m)。研究结果为采矿环境结构安全施工提供了科学依据。  相似文献   

9.
露天地下开采隔离层稳定性研究   总被引:2,自引:0,他引:2  
岩小明  李夕兵  郭雷  高峰 《岩土力学》2007,28(8):1682-1686
露天地下开采隔离层稳定性分析是矿山中经常遇到的问题。以大宝山矿露天地下开采的工程实例,采用数值分析方法,对隔离层稳定性进行分析计算,发现空区顶板的拉应力是关系隔离层稳定性的关键因素。通过对隔离层的安全厚度数值计算,与5种理论计算方法结果进行了比较,综合求和归一法数据处理和多项式数值逼近得到了不同空区跨度与隔离层安全厚度关系。结果为露天地下开采隔离层稳定性分析的方法进行了验证和补充,也为矿山设计隔离层厚度提供了参考,对指导露天地下开采安全生产施工具有重要意义。  相似文献   

10.
Large underground caverns are increasingly being considered for the construction of industrial facilities and transportation infrastructure in order to optimize the use of surface land in large urban cities. Due to the geological constraints underground, it is sometimes necessary to construct a cavern close to an existing cavern. Pillars serve as an underground support element in twin caverns, without which it is difficult to sustain the weight of the overburden materials. If the strength of a pillar is exceeded, it will fail, and the load that it carried will be transferred and thereby contribute to the collapse of the twin caverns. The lack of confinement in slender pillars also contributes to the complete collapse of pillars at relatively low stress magnitudes. From a design point of view, understanding the pillar failure mechanism and the interaction effect between twin caverns is essential. This paper presents a numerical investigation on the influence of various design parameters on twin cavern interaction. Pillar performances with respect to the changes to the maximum principal stress in the pillar, the peak vertical stress, and the peak principal stress difference in the pillar core are studied in order to examine the failure mechanisms and to identify situations in which there is significant cavern interaction and overlap of the plastic zones. Copyright © 2014 John Wiley & Sons, Ltd.  相似文献   

11.
A number of pillars are left developed in some of the Chinese metal mines due to careless mining and lack of proper planning. There are pillars in such mines which do not contribute much in supporting the covered rock mass. Re-exploitation of these standing (non-supporting) pillars can be an efficient method for resource recovery if the remaining pillars ensure the stability of the covered host rock. In this study, a tungsten mine in Jiangxi Province, China, was chosen as a case for studying this pillar recovery scheme. Based on accurate in situ stress measurement data in the original and disturbed host rock, the storage energy in the rock mass could be estimated by numerical simulation methods. After comparing the storage energy to the sum of the fractured energy consumption and friction energy consumption (obtained from lab tests), the recyclable pillars can be identified by a cyclic judgment programming process.  相似文献   

12.
This study presents a numerical investigation on the dynamic mechanical state of a coal pillar and the assessment of the coal bump risk during extraction using the longwall mining method. The present research indicates that there is an intact core, even when the peak pillar strength has been exceeded under uniaxial compression. This central portion of the coal pillar plays a significant role in its loading capacity. In this study, the intact core of the coal pillar is defined as an elastic core. Based on the geological conditions of a typical longwall panel from the Tangshan coal mine in the City of Tangshan, China, a numerical fast Lagrangian analysis of continua in three dimensions (FLAC3D) model was created to understand the relationship between the volume of the elastic core in a coal pillar and the vertical stress, which is considered to be an important precursor to the development of a coal bump. The numerical results suggest that, the wider the coal pillar, the greater the volume of the elastic core. Therefore, a coal pillar with large width may form a large elastic core as the panel is mined, and the vertical stress is expected to be greater in magnitude. Because of the high stresses and the associated stored elastic energy, the risk of coal bumps in a coal pillar with large width is greater than for a coal pillar with small width. The results of the model also predict that the peak abutment stress occurs near the intersection between the mining face and the roadways at a distance of 7.5 m from the mining face. It is revealed that the bump-prone zones around the longwall panel are within 7–10 m ahead of the mining face and near the edge of the roadway during panel extraction.  相似文献   

13.
曹帅  杜翠凤  谭玉叶  付建新 《岩土力学》2015,36(8):2370-2376
矿柱宽度和充填体自立高度是阶段嗣后充填顺利实施的重要影响因素。基于弹性力学平面应变基本假设,建立阶段嗣后胶结充填体矿柱力学模型并进行理论求解。以某铁矿为工程分析实例,采用控制变量法(CVM)研究矿柱不同宽度、高度条件下,水平应力和剪应力的变化规律。研究表明:矿房极限宽度和高度分别为19.8 m和103.2 m。胶结充填体矿柱水平应力随矿柱高度的增高而逐渐增大;剪应力在矿柱中心位置达到最大,且高度越大,剪应力值也越大。在胶结充填体矿柱与非胶结充填体接触侧剪应力趋于定值。矿柱宽度分别为15、18、20 m时,其剪应力分别为243.8、292.6、325.1 kPa。而产生剪应力的主要原因是非胶结充填体受水平应力作用在与胶结充填体矿柱接触面产生滑动摩擦力所致。  相似文献   

14.
Pu  Yuanyuan  Apel  Derek B.  Prusek  Stanislaw  Walentek  Andrzej  Cichy  Tomasz 《Natural Hazards》2021,105(1):191-203

Exact knowledge for ground stress field guarantees the construction of various underground engineering projects as well as prediction of some geological hazards such as the rock burst. Limited by costs, field measurement for initial ground stresses can be only conducted on several measure points, which necessitates back-analysis for initial stresses from limited field measurement data. This paper employed a multioutput decision tree regressor (DTR) to model the relationship between initial ground stress field and its impact factor. A full-scale finite element model was built and computed to gain 400 training samples for DTR using a submodeling strategy. The results showed that correlation coefficient r between field measurement values and back-analysis values reached 0.92, which proved the success of DTR. A neural network was employed to store the global initial ground stress field. More than 600,000 node data extracted from the full-scale finite element model were used to train this neural network. After training, the stresses on any location can be investigated by inputting corresponding coordinates into this neural network.

  相似文献   

15.
矿柱稳定性影响因素敏感性分析及其应用研究   总被引:1,自引:0,他引:1  
宋卫东  曹帅  付建新  江国建  吴锋 《岩土力学》2014,35(Z1):271-277
为研究矿柱稳定性影响因素的敏感程度,以招金大尹格庄金矿为研究背景,从矿柱载荷、强度、失稳形式及影响因素确定四方面推导出两种矿柱形式的安全系数计算公式,设计采用6因素5水平正交试验对矿柱稳定性影响因素敏感性进行分析,并研究主要影响因素与矿柱安全系数之间的函数关系。研究表明,矿柱宽度、矿体开采深度和矿房宽度3个主要因素对矿柱稳定性影响程度是最为剧烈的;矿柱安全系数随着矿柱宽度地增加呈指数形式递增且递增速率不断加大,随矿体开采深度地增加呈幂函数形式递减且递减速率逐渐变缓,随矿房宽度地增加呈负指数形式递减且降低速率逐渐变慢。利用DPS和Matlab建立的矿柱安全系数回归方程得出保证安全生产的合理矿柱尺寸,矿房宽度应不超过8 m,布置条形矿柱宽度应不小于3.6 m,布置方形矿柱宽度应不小于5.9 m。结合采场矿柱布置实际,应用效果较为理想,可为下中段矿体回采矿块布置提供较好的依据。  相似文献   

16.
Some villages and bridges are located on the ground surface of the working district no. 7 in the Wanglou Coal Mine. If longwall mining is adopted, the maximum deformation of the ground surface will exceed the safety value. Strip mining is employed for the working district no. 7 which is widely used to reduce surface subsidence and the consequent damage of buildings on the ground surface. To ensure the safety of coal pillars and improve the recovery coefficient, theoretical analysis and numerical simulation (FLAC 3D) were adopted to determine the coal pillar and mining widths and to discuss the coal pillar stress distribution and surface subsidence for different mining scenarios. The results revealed that the width of coal pillars should be larger than 162 m, and the optimized mining width varies from 150 to 260 m. As the coal seam is exploited, vertical stress is mainly applied on the coal pillar, inducing stress changes on its ribs. The coefficient of mining-induced stress varies from 2.02 to 2.62 for different mining scenarios. The maximum surface subsidence and horizontal movement increase as the mining width increases. However, when the mining width increases to a certain value, increasing the pillar width cannot significantly decrease the maximum subsidence. To ensure the surface subsidence less than 500 mm, the mining width should not be larger than 200 m. Considering the recovery coefficient and safety of the coal pillar, a pillar width of 165 m is suggested.  相似文献   

17.
A relatively novel technique, artificial neural networks (ANN), is used in predicting the stability of crown pillars left over large excavations. Data for the training and verification of the networks were obtained from the literature. Four artificial networks, based on two different architectures, were used. The networks used different numbers of input parameters to predict the stability or failure of crown pillars. Multi‐layer perceptron networks using mine type, dip of orebody, overburden thickness, pillar thickness, pillar length, stope height, backfill height, Rock Mass Rating (RMR) of the host rock and RMR of the orebody showed excellent performance in training and verification. Adding three more variables, namely pillar width, rock density and pillar thickness to width ratio, showed symptoms of over‐learning without degrading performance significantly. Radial basis function networks were capable of predicting crown pillar behaviour on the basis of few input functions. It was shown that mine type, dip and pillar thickness to width ratio can be used for a preliminary estimation of stability. Copyright © 2006 John Wiley & Sons, Ltd.  相似文献   

18.
We studied an underground coal gasification technique using strip mining-face mining gasifier controlled retraction injection technology (SMFM). This green mining approach offers several advantages over conventional strip mining but the stress distribution and stability of SMFM operations remain largely untested. In particular, hyperbolic coking pillars are used in SMFM compared with rectangular pillars used in traditional strip mining, which can influence the ultimate bearing capacity and stability. We use numerical simulations to investigate the influence of different factors (arch height, pillar height and width, mechanical characteristics), under the coupling effect of high temperature, on the ultimate bearing capacity of hyperbolic pillars. Our results indicate that arch height has a strong influence on pillar stress, while changes in pillar width and height are less significant. A stability evaluation method is proposed and tested on a case study in Inner Mongolia. Our theoretical results have practical significance for the promotion and application of SMFM.  相似文献   

19.
Flyrock arising from blasting operations is one of the crucial and complex problems in mining industry and its prediction plays an important role in the minimization of related hazards. In past years, various empirical methods were developed for the prediction of flyrock distance using statistical analysis techniques, which have very low predictive capacity. Artificial intelligence (AI) techniques are now being used as alternate statistical techniques. In this paper, two predictive models were developed by using AI techniques to predict flyrock distance in Sungun copper mine of Iran. One of the models employed artificial neural network (ANN), and another, fuzzy logic. The results showed that both models were useful and efficient whereas the fuzzy model exhibited high performance than ANN model for predicting flyrock distance. The performance of the models showed that the AI is a good tool for minimizing the uncertainties in the blasting operations.  相似文献   

20.
Prediction of global stability in room and pillar coal mines   总被引:1,自引:0,他引:1  
Global stability is a necessary prerequisite for safe retreat mining and one of the crucial and complex problems in room and pillar mining, so its prediction plays an important role in the safety of retreat mining and the reduction of pillar failure risk. In this study, we have tried to develop predictive models for anticipating global stability. For this purpose, two of the most popular techniques, logistic regression analysis and fuzzy logic, were taken into account and a predictive model was constructed based on each. For training and testing of these models, a database including 80 retreat mining case histories from 18 room and pillar coal mines, located in West Virginia State, USA, was used. The models predict global stability based on the major contributing parameters of pillar stability. It was found that both models can be used to predict the global stability, but the comparison of two models, in terms of statistical performance indices, shows that the fuzzy logic model provides better results than the logistic regression. These models can be applied to identify the susceptibility of pillar failure in panels of coal mines, and this may help to reduce the casualties resulting from pillar instability. Finally, the sensitivity analysis was performed on database to determine the most important parameters on global stability. The results revealed that the pillar width is the most important parameter, whereas the depth of cover is the least important one.  相似文献   