首页 | 本学科首页   官方微博 | 高级检索  
相似文献
 共查询到20条相似文献,搜索用时 109 毫秒
1.
2.
Relatively few studies have addressed water management and adaptation measures in the face of changing water balances due to climate change. The current work studies climate change impact on a multipurpose reservoir performance and derives adaptive policies for possible future scenarios. The method developed in this work is illustrated with a case study of Hirakud reservoir on the Mahanadi river in Orissa, India, which is a multipurpose reservoir serving flood control, irrigation and power generation. Climate change effects on annual hydropower generation and four performance indices (reliability with respect to three reservoir functions, viz. hydropower, irrigation and flood control, resiliency, vulnerability and deficit ratio with respect to hydropower) are studied. Outputs from three general circulation models (GCMs) for three scenarios each are downscaled to monsoon streamflow in the Mahanadi river for two future time slices, 2045–65 and 2075–95. Increased irrigation demands, rule curves dictated by increased need for flood storage and downscaled projections of streamflow from the ensemble of GCMs and scenarios are used for projecting future hydrologic scenarios. It is seen that hydropower generation and reliability with respect to hydropower and irrigation are likely to show a decrease in future in most scenarios, whereas the deficit ratio and vulnerability are likely to increase as a result of climate change if the standard operating policy (SOP) using current rule curves for flood protection is employed. An optimal monthly operating policy is then derived using stochastic dynamic programming (SDP) as an adaptive policy for mitigating impacts of climate change on reservoir operation. The objective of this policy is to maximize reliabilities with respect to multiple reservoir functions of hydropower, irrigation and flood control. In variations to this adaptive policy, increasingly more weightage is given to the purpose of maximizing reliability with respect to hydropower for two extreme scenarios. It is seen that by marginally sacrificing reliability with respect to irrigation and flood control, hydropower reliability and generation can be increased for future scenarios. This suggests that reservoir rules for flood control may have to be revised in basins where climate change projects an increasing probability of droughts. However, it is also seen that power generation is unable to be restored to current levels, due in part to the large projected increases in irrigation demand. This suggests that future water balance deficits may limit the success of adaptive policy options.  相似文献   

3.
This work examines future flood risk within the context of integrated climate and hydrologic modelling uncertainty. The research questions investigated are (1) whether hydrologic uncertainties are a significant source of uncertainty relative to other sources such as climate variability and change and (2) whether a statistical characterization of uncertainty from a lumped, conceptual hydrologic model is sufficient to account for hydrologic uncertainties in the modelling process. To investigate these questions, an ensemble of climate simulations are propagated through hydrologic models and then through a reservoir simulation model to delimit the range of flood protection under a wide array of climate conditions. Uncertainty in mean climate changes and internal climate variability are framed using a risk‐based methodology and are explored using a stochastic weather generator. To account for hydrologic uncertainty, two hydrologic models are considered, a conceptual, lumped parameter model and a distributed, physically based model. In the conceptual model, parameter and residual error uncertainties are quantified and propagated through the analysis using a Bayesian modelling framework. The approach is demonstrated in a case study for the Coralville Dam on the Iowa River, where recent, intense flooding has raised questions about potential impacts of climate change on flood protection adequacy. Results indicate that the uncertainty surrounding future flood risk from hydrologic modelling and internal climate variability can be of the same order of magnitude as climate change. Furthermore, statistical uncertainty in the conceptual hydrological model can capture the primary structural differences that emerge in flood damage estimates between the two hydrologic models. Copyright © 2014 John Wiley & Sons, Ltd.  相似文献   

4.
Abstract

Reservoir operation is studied for the Daule Peripa and Baba system in Ecuador, where El Niño events cause anomalously heavy precipitation. Reservoir inflow is modelled by a Markov-switching model using El Niño–Southern Oscillation (ENSO) indices as input. Inflow is forecast using 9-month lead time ENSO forecasts. Monthly reservoir releases are optimized with a genetic algorithm, maximizing hydropower production during the forecast period and minimizing deviations from storage targets. The method is applied to the existing Daule Peripa Reservoir and to a planned system including the Baba Reservoir. Optimized operation is compared to historical management of Daule Peripa. Hypothetical management scenarios are used as the benchmark for the planned system, for which no operation policy is known. Upper bounds for operational performance are found via dynamic programming by assuming perfect knowledge of future inflow. The results highlight the advantages of combining inflow forecasts and storage targets in reservoir operation.
Editor D. Koutsoyiannis; Associate editor I. Nalbantis  相似文献   

5.
东南沿海水库下游地区基于动态模拟的洪涝风险评估   总被引:1,自引:1,他引:0  
我国东南沿海地区大多为一些中小流域,这些流域上游多建有水库工程,下游则为人口稠密的平原区,流域调蓄能力小,汇流时间短.同时,随着近年来城镇化快速发展,洪涝风险不断加大.因此,迫切需要开展水库下游不同暴雨重现期下的洪涝风险评估研究,以便为防洪决策提供技术支撑.为此,本文利用遥感、GIS、水文水动力学模型等相关技术方法,建立洪涝动态模拟模型来评估洪涝危险性;采用层次分析法和因子叠加法,从洪涝危险性和洪涝易损性两方面开展洪涝风险综合评估分析.研究表明,通过多学科与多技术手段相结合方法,来模拟预测不同暴雨重现期洪水动态淹没过程,再结合相关社会经济属性,可以有效地评估研究区洪涝灾害的风险,从而为水库调度及流域防洪减灾提供有力支撑.  相似文献   

6.
Streamflow forecasts are updated periodically in real time, thereby facilitating forecast evolution. This study proposes a forecast-skill-based model of forecast evolution that is able to simulate dynamically updated streamflow forecasts. The proposed model applies stochastic models that deal with streamflow variability to generate streamflow scenarios, which represent cases without forecast skill of future streamflow. The model then employs a coefficient of prediction to determine forecast skill and to quantify the streamflow variability ratio explained by the forecast. By updating the coefficients of prediction periodically, the model efficiently captures the evolution of streamflow forecast. Simulated forecast uncertainty increases with increasing lead time; and simulated uncertainty during a specific future period decreases over time. We combine the statistical model with an optimization model and design a hypothetical case study of reservoir operation. The results indicate the significance of forecast skill in forecast-based reservoir operation. Shortage index reduces as forecast skill increases and ensemble forecast outperforms deterministic forecast at a similar forecast skill level. Moreover, an effective forecast horizon exists beyond which more forecast information does not contribute to reservoir operation and higher forecast skill results in longer effective forecast horizon. The results illustrate that the statistical model is efficient in simulating forecast evolution and facilitates analysis of forecast-based decision making.  相似文献   

7.
大别山库区降水预报性能评估及应用对策   总被引:1,自引:0,他引:1  
对降水预报进行性能评估及应用对策研究可以更好地发挥降水预报在水库调度中的决策支持作用.基于大别山库区近10 a汛期(2007—2016年5月1日—9月30日)24~168 h共7个预见期降水预报和地面降水观测资料,采用正确率、TS评分、概率统计、ROC曲线以及CTS等方法评估大别山库区降水预报性能,并以响洪甸水库为重点研究区域分析降水预报在水库调度中的应用对策.结果表明:1)大别山库区各量级的降水预报都有正预报技巧;24~72 h预见期降水预报的TS评分较高且空报率、漏报率也较低,具有较高的预报性能;但96 h及以上预见期降水预报性能明显下降,中雨以上量级空报率、漏报率较大,特别是对大暴雨及其以上量级的降水预报性能显著下降.2)大别山库区预报降水量级与实况降水量级基本符合,预报降水量级大于等于实况降水量级的概率超过75%;虽然降水预报量级上呈现出过度预报的现象,但降水过程预报对水库调度仍有较好的应用价值,应用时要考虑到降水预报量级可能存在偏差.3)转折性天气预报96 h及以上预见期CTS评分较低,但72 h以内预见期的性能明显改进,尤其是24 h预见期CTS评分也提高到了38.2%;水库调度可从长预见期的降水预报获取降水过程及其可能发生转折的信息,根据短预见期的降水预报进行调度方案调整.  相似文献   

8.
Real time updating of rainfall-runoff (RR) models is traditionally performed by state-space formulation in the context of flood forecasting systems. In this paper, however, we examine applicability of generalized likelihood uncertainty estimation (GLUE) approach in real time modification of forecasts. Real time updating and parameter uncertainty analysis was conducted for Abmark catchment, a part of the great Karkheh basin in south west of Iran. A conceptual-distributed RR model, namely ModClark, was used for basin simulation, such that the basin’s hydrograph was determined by the superposition of runoff generated by individual cells in a raster-based discretization. In real time updating of RR model by GLUE method, prior and posterior likelihoods were computed using forecast errors that were obtained from the results of behavioral models and real time recorded discharges. Then, prior and posterior likelihoods were applied to modify forecast confidence limits in each time step. Calibration of parameters was performed using historical data while distribution of parameters was modified in real time based on new data records. Two scenarios of rainfall forecast including prefect-rainfall-forecast and no-rainfall-forecast were assumed in absence of a robust rainfall forecast model in the study catchment. The results demonstrated that GLUE application could offer an acceptable lead time for peak discharge forecast at the expense of high computational demand.  相似文献   

9.
: As with all dynamic programming formulations, differential dynamic programming (DDP) successfully exploits the sequential decision structure of multi-reservoir optimization problems, overcomes difficulties with the nonconvexity of energy production functions for hydropower systems, and provides optimal feedback release policies. DDP is particularly well suited to optimizing large-scale multi-reservoir systems due to its relative insensitivity to state-space dimensionality. This advantage of DDP encourages expansion of the state vector to include additional multi-lag hydrologic information and/or future inflow forecasts in developing optimal reservoir release policies. Unfortunately, attempts at extending DDP to the stochastic case have not been entirely successful. A modified stochastic DDP algorithm is presented which overcomes difficulties in previous formulations. Application of the algorithm to a four-reservoir hydropower system demonstrates its capabilities as an efficient approach to solving stochastic multi-reservoir optimization problems. The algorithm is also applied to a single reservoir problem with inclusion of multi-lag hydrologic information in the state vector. Results provide evidence of significant benefits in direct inclusion of expanded hydrologic state information in optimal feedback release policies.  相似文献   

10.
: As with all dynamic programming formulations, differential dynamic programming (DDP) successfully exploits the sequential decision structure of multi-reservoir optimization problems, overcomes difficulties with the nonconvexity of energy production functions for hydropower systems, and provides optimal feedback release policies. DDP is particularly well suited to optimizing large-scale multi-reservoir systems due to its relative insensitivity to state-space dimensionality. This advantage of DDP encourages expansion of the state vector to include additional multi-lag hydrologic information and/or future inflow forecasts in developing optimal reservoir release policies. Unfortunately, attempts at extending DDP to the stochastic case have not been entirely successful. A modified stochastic DDP algorithm is presented which overcomes difficulties in previous formulations. Application of the algorithm to a four-reservoir hydropower system demonstrates its capabilities as an efficient approach to solving stochastic multi-reservoir optimization problems. The algorithm is also applied to a single reservoir problem with inclusion of multi-lag hydrologic information in the state vector. Results provide evidence of significant benefits in direct inclusion of expanded hydrologic state information in optimal feedback release policies.  相似文献   

11.
司伟  包为民  瞿思敏  石朋 《湖泊科学》2018,30(2):533-541
空间集总式水文模型的洪水预报精度会受到面平均雨量估计误差的严重影响.点雨量监测值的误差类型、误差大小以及流域的雨量站点密度和站点的空间分布都会影响到面平均雨量的计算.为提高实时洪水预报精度,本文提出了一种基于降雨系统响应曲线洪水预报误差修正方法.通过此方法估计降雨输入项的误差,从而提高洪水预报精度.此方法将水文模型做为输入和输出之间的响应系统,用实测流量和计算流量之间的差值做为信息,通过降雨系统响应曲线,使用最小二乘估计原理,对面平均雨量进行修正,再用修正后的面平均雨量重新计算出流过程.将此修正方法结合新安江模型使用理想案例进行检验,并应用于王家坝流域的16场历史洪水以及此流域不同雨量站密度的情况下,结果证明均有明显修正效果,且在雨量站密度较低时修正效果更加明显.该方法是一种结构简单且不增加模型参数和复杂度的实时洪水修正的新方法.  相似文献   

12.
This study proposes a real-time error correction method for the forecasted water stage using a combination of forecast errors estimated by the time series models, AR(1), AR(2), MA(1) and MA(2), and the average deviation model to update the water stage forecast during rainstorm events. During flood forecasting and warning operations, the proposed real-time error correction method takes advantage of being individually and continuously implemented and the results not being updated to the hydrological model and hydraulic routings so as to save computational time by recalibrating the parameters of the proposed methods with real-time observation. For model validation, the current study adopts the observed and forecasted data on a severe typhoon, Morakot, collected at eight water level gauges in Southern Taiwan and provided by the flood forecast system FEWS_Taiwan, which is linked with the reliable quantitative precipitation forecast (QPF) at 3 h of lead time provided by the Center Weather Bureau in Taiwan, as the model validation. The results of numerical experiments indicate that the proposed real-time error correction method can effectively reduce the errors of forecasted water stages at the 1-, 2-, and 3-h lead time and so enhance the reliability of forecast information issued by the FEWS_Taiwan. By means of real-time estimating potential forecast error, the uncertainties in hydrology, modules as well as associated parameters, and physiographical features of the river can be reduced.  相似文献   

13.
Abstract

An updating technique is a tool to update the forecasts of mathematical flood forecasting model based on data observed in real time, and is an important element in a flood forecasting model. An error prediction model based on a fuzzy rule-based method was proposed as the updating technique in this work to improve one- to four-hour-ahead flood forecasts by a model that is composed of the grey rainfall model, the grey rainfall—runoff model and the modified Muskingum flow routing model. The coefficient of efficiency with respect to a benchmark is applied to test the applicability of the proposed fuzzy rule-based method. The analysis reveals that the fuzzy rule-based method can improve flood forecasts one to four hours ahead. The proposed updating technique can mitigate the problem of the phase lag in forecast hydrographs, and especially in forecast hydrographs with longer lead times.  相似文献   

14.
ABSTRACT

Among various strategies for sediment reduction, venting turbidity currents through dam outlets can be an efficient way to reduce suspended sediment deposition. The accuracy of turbidity current arrival time forecasts is crucial for the operation of reservoir desiltation. A turbidity current arrival time (TCAT) model is proposed. A multi-objective genetic algorithm (MOGA), a support vector machine (SVM) and a two-stage forecasting technique are integrated to obtain more effective long lead-time forecasts of inflow discharge and inflow sediment concentration. The multi-objective genetic algorithm (MOGA) is applied for determining the optimal inputs of the forecasting model, support vector machine (SVM). The two-stage forecasting technique is implemented by adding the forecasted values to candidate inputs for improving the long lead-time forecasting. Then, the turbidity current arrival time from the inflow boundary to the reservoir outlet is calculated. To demonstrate the effectiveness of the TCAT model, it is applied to Shihmen Reservoir in northern Taiwan. The results confirm that the TCAT model forecasts are in good agreement with the observed data. The proposed TCAT model can provide useful information for reservoir sedimentation management during desilting operations.  相似文献   

15.
Operational flood forecasting requires accurate forecasts with a suitable lead time, in order to be able to issue appropriate warnings and take appropriate emergency actions. Recent improvements in both flood plain characterization and computational capabilities have made the use of distributed flood inundation models more common. However, problems remain with the application of such models. There are still uncertainties associated with the identifiability of parameters; with the computational burden of calculating distributed estimates of predictive uncertainty; and with the adaptive use of such models for operational, real-time flood inundation forecasting. Moreover, the application of distributed models is complex, costly and requires high degrees of skill. This paper presents an alternative to distributed inundation models for real-time flood forecasting that provides fast and accurate, medium to short-term forecasts. The Data Based Mechanistic (DBM) methodology exploits a State Dependent Parameter (SDP) modelling approach to derive a nonlinear dependence between the water levels measured at gauging stations along the river. The transformation of water levels depends on the relative geometry of the channel cross-sections, without the need to apply rating curve transformations to the discharge. The relationship obtained is used to transform water levels as an input to a linear, on-line, real-time and adaptive stochastic DBM model. The approach provides an estimate of the prediction uncertainties, including allowing for heterescadasticity of the multi-step-ahead forecasting errors. The approach is illustrated using an 80 km reach of the River Severn, in the UK.  相似文献   

16.
An attempt of using stochastic hydrologic technique to assess the intrinsic risk of reservoir operation is made in this study. A stochastic simulation model for reservoir operation is developed. The model consists of three components: synthetic generation model for streamflow and sediment sequences, one-dimensional delta deposit model for sediment transport processes in reservoirs, and simulation model for reservoir operation. This kind of integrated simulation model can be used to simulate not only the inflow uncertainty of streamflow and sedimentation, but also the variation in operation rules of reservoirs. It is herein used for the risk assessment of a reservoir, and the simulation is performed for different operation scenarios. Simulation for the 100-year period of sediment transport and deposition in the river-reservoir system indicates that the navigation risk is much higher than that of hydropower generation or sediment deposition in the reservoir. The risk of sediment deposition at the river-section near the backwater profile is also high thereby the navigation at the river-segment near this profile takes high risk because of inadequate navigation depth.  相似文献   

17.
BMA集合预报在淮河流域应用及参数规律初探   总被引:1,自引:1,他引:0  
以淮河流域吴家渡水文站作为试验站点,采用基于贝叶斯平均法(BMA)的集合预报模型处理来源于马斯京根法、一维水动力学方法、BPNN(Back Propagation Neural Network)的预报流量序列,通过分析BMA的参数以及其预报结果,对各方法在淮河典型站点流量预报中的适用性进行验证与分析.经2003—2016年19场洪水模拟检验可知,BMA模型能够有效避免模型选择带来的洪水预报误差放大效应,可以提供高精度、鲁棒性强的洪水预报结果.通过进一步比较各模型统计最优的频率与BMA权重值之间的相关性,发现权重值不适用于对单场洪水预报精度评定,而适用于描述多场洪水预报中,模型为最优的统计频率;基于大量先验信息,提前获取BMA的权重等参数,将是指导模型选择、降低洪水预报不确定性、改进洪水预报技术的有效手段.  相似文献   

18.
Spatially distributed hydrologic models can be effectively utilized for flood event simulation over basins where a complex system of reservoirs affecting the natural flow regime is present. Flood peak attenuation through mountain reservoirs can, in fact, mitigate the impact of major floods in flood‐prone areas of the lower river valley. Assessment of this effect for a complex reservoir system is performed with a spatially distributed hydrologic model where the surface runoff formation and the hydraulic routing through each reservoir and the river system are performed at a fine spatial and time resolution. The Toce River basin is presented as a case study, because of the presence of 14 active hydroelectric dams that affect the natural flow regime. A recent extreme flood event is simulated using a multi‐realization kriging method for modelling the spatial distribution of rainfall. A sensitivity analysis of the key elements of the distributed hydrologic model is also performed. The flood hydrograph attenuation is assessed. Several possible reservoir storage conditions are used to characterize the initial condition of each reservoir. The results demonstrate how a distributed hydrologic model can contribute to defining strategies for reservoir management in flood mitigation. Copyright © 2004 John Wiley & Sons, Ltd.  相似文献   

19.
A method for quantifying inflow forecasting errors and their impact on reservoir flood control operations is proposed. This approach requires the identification of the probability distributions and uncertainty transfer scheme for the inflow forecasting errors. Accordingly, the probability distributions of the errors are inferred through deducing the relationship between its standard deviation and the forecasting accuracy quantified by the Nash–Sutcliffe efficiency coefficient. The traditional deterministic flood routing process is treated as a diffusion stochastic process. The diffusion coefficient is related to the forecasting accuracy, through which the forecasting errors are indirectly related to the sources of reservoir operation risks. The associated risks are derived by solving the stochastic differential equation of reservoir flood routing via the forward Euler method. The Geheyan reservoir in China is selected as a case study. The hydrological forecasting model for this basin is established and verified. The flood control operation risks in the forecast-based pre-release operation mode for different forecasting accuracies are estimated by the proposed approach. Application results show that the proposed method can provide a useful tool for reservoir operation risk estimation and management.  相似文献   

20.
Forecast ensembles of hydrological and hydrometeorologial variables are prone to various uncertainties arising from climatology, model structure and parameters, and initial conditions at the forecast date. Post‐processing methods are usually applied to adjust the mean and variance of the ensemble without any knowledge about the uncertainty sources. This study initially addresses the drawbacks of a commonly used statistical technique, quantile mapping (QM), in bias correction of hydrologic forecasts. Then, an auxiliary variable, the failure index (γ), is proposed to estimate the ineffectiveness of the post‐processing method based on the agreement of adjusted forecasts with corresponding observations during an analysis period prior to the forecast date. An alternative post‐processor based on copula functions is then introduced such that marginal distributions of observations and model simulations are combined to create a multivariate joint distribution. A set of 2500 hypothetical forecast ensembles with parametric marginal distributions of simulated and observed variables are post‐processed with both QM and the proposed multivariate post‐processor. Deterministic forecast skills show that the proposed copula‐based post‐processing is more effective than the QM method in improving the forecasts. It is found that the performance of QM is highly correlated with the failure index, unlike the multivariate post‐processor. In probabilistic metrics, the proposed multivariate post‐processor generally outperforms QM. Further evaluation of techniques is conducted for river flow forecast of Sprague River basin in southern Oregon. Results show that the multivariate post‐processor performs better than the QM technique; it reduces the ensemble spread and is a more reliable approach for improving the forecast. Copyright © 2012 John Wiley & Sons, Ltd.  相似文献   

设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号