首页 | 本学科首页   官方微博 | 高级检索  
相似文献
 共查询到20条相似文献,搜索用时 375 毫秒
1.
Debris flows and landslides, extensively developing and frequently occurring along Parlung Zangbo, seriously damage the Highway from Sichuan to Tiebt(G318) at Bomi County. The disastrous debris flows of the Tianmo Watershed on Sept. 4, 2007, July 25, 2010 and Sept. 4, 2010, blocked Parlung Zangbo River and produced dammed lakes, whose outburst flow made 50 m high terrace collapse at the opposite bank due to intense scouring on the foot of the terrace. As a result, the traffic was interrupted for 16 days in 2010 because that 900 m highway base was destructed and 430 m ruined. These debris flows were initiated by the glacial melting which was induced by continuous higher temperature and the following intensive rainfall, and expanded by moraines along channels and then blocked Parlung Zangbo. At the outlet of watershed,the density, velocity and peak discharge of debris flow was 2.06 t/m3, 12.7 m/s and 3334 m3/s, respectively. When the discharge at the outlet and the deposition volume into river exceeds 2125 m3/s and 126×103 m3, respectively, debris flow will completely blocked Parlung Zangbo. Moreover,if the shear stress of river flow on the foot of terrace and the inclination angel of terrace overruns 0. 377 N/m2 and 26°, respectively, the unconsolidated terrace will be eroded by outburst flow and collapse. It was strongly recommended for mitigation that identify and evade disastrous debris flows, reduce the junction angel of channels between river and watershed, build protecting wall for highway base and keep appropriate distance between highway and the edge of unconsolidated terrace.  相似文献   

2.
Accurate prediction of the hydrographs of outburst floods induced by landslide dam overtopping failure is necessary for hazard prevention and mitigation. In this study, flume model tests on the breaching of landslide dams were conducted. Unconsolidated soil materials with wide grain size distributions were used to construct the dam. The effects of different upstream inflow discharges and downstream bed soil erosion on the outburst peak discharge were investigated. Experimental results reveal that the whole hydrodynamic process of landslide dam breaching can be divided into three stages as defined by clear inflection points and peak discharges. The larger the inflow discharge, the shorter the time it takes to reach the peak discharge, and the larger the outburst flood peak discharge. The scale of the outburst floods was found to be amplified by the presence of an erodible bed located downstream of the landslide dam. This amplification decreases with the increase of upstream inflow. In addition, the results show that the existence of an erodible bed increases the density of the outburst flow, increasing its probability of transforming from a sediment flow to a debris flow.  相似文献   

3.
On 23 July 2009, a catastrophic debris flows were triggered by heavy rainfall in Xiangshui gully, Kangding county, southwestern China. This debris flow originating shortly after a rainstorm with an intensity of 28 mm per hour transported a total volume of more than 480×103 m3 debris, depositing the poorly sorted sediment including boulders up to 2-3 m in diameter both onto an existing debris fans and into the river. Our primary objective for this study was to analyze the characteristics of the triggering ra...  相似文献   

4.
Zhatai gully is a typical debris flow channel in Butuo county of Sichuan province, southwestern China. The geomorphologic features are analyzed and the physical-dynamic characteristics are discussed on the basis of field investigation and laboratory tests. Geomorphologic analysis indicates that Zhatai-gully drainage in relation to debris flow can be divided into source area, transport area, and deposition area. The source area has a steep slope and has very limited vegetation cover, which favors runoff, allowing loose solid materials to be mobilized easily and rapidly. In the transport area, there are many small landslides, lateral lobes, and loose materials distributed on both banks. These landslides are active and constantly providing abundant source of soils for the debris flows. In the deposition area, three old debris-flow deposits of different ages can be observed. The dynamic calculation shows that within the recurrence intervals of 50 and 100 years, debris flow discharges are 155.77m3/s and 1y8.19m3/s and deposition volumes are 16.39 x 104 m3 and 18.14 x 104 m3, respectively. The depositional fan of an old debris flow in the outlet of the gully can be subdivided into six layers. There are three debris flow deposits on left and two on the right side of the gully. Grain-size tests of sediments from the soil, gulley bed deposits, and the fresh and old debris flow deposits showed that high amounts of clay and fine gravel were derived from the soil in the source area whereas much of the gravel fraction were sourced from the gully bed deposits. Comprehensive analysis indicates that Zhatai gully is viscous debris-flow gully with moderate to high frequency and moderate to large magnitude debris flows. The risk of a debris flow disaster in Zhatai-gully is moderate and poses a potential threat to the planned hydroelectric dam. Appropriate engineering measures are suggested in the construction and protection of the planned hydroelectric station.  相似文献   

5.
Debris flows have caused serious human casualties and economic losses in the regions strongly affected by the Ms8.0 Wenchuan earthquake of 2008. Debris flow mitigation and risk assessment is a key issue for reconstruction.The existing methods of inundation simulation are based on historical disasters and have no power of prediction.The rain-flood method can not yield detailed flow hydrograph and does not meet the need of inundation simulation. In this paper,the process of water flow was studied by using the Arc-SCS model combined with hydraulic method,and then the debris flow runoff process was calculated using the empirical formula combining the result from Arc-SCS.The peak discharge and runoff duration served as input of inundation simulation. Then,the dangerous area is predicted using kinematic wave method and Manning equation.Taking the debris flow in Huashiban gully in Beichuan County,Sichuan Province,China on 24 Sep.2008 as example,the peak discharge of water flow and debris flow were calculated as 35.52 m3·s-1 and 215.66 m3·s-,with error of 4.15%compared to the measured values.The simulated area of debris-flow deposition was 161,500 m2,vs.the measured area of 144,097 m2,in error of 81.75%.The simulated maximum depth was 12.3 m,consistent with the real maximum depth between 10 and 15 m according to the field survey.The minor error is mainly due to the flow impact on buildings and variations in cross-section configuration.The present methodology can be applied to predict debris flow magnitude and evaluate its risk in other watersheds inthe earthquake area.  相似文献   

6.
The erosion shape and the law of development of debris flow sabo dam downstream is a weak part in the study on debris flow erosion. The shape and development of scour pit have an important effect on the stability and safety of debris flow sabo dam, which determines the foundational depth of the dam and the design of protective measures downstream. Study on the scouring law of sabo dam downstream can evaluate the erosion range and reasonably arrange auxiliary protective engineering. Therefore, a series of flume experiments are carried out including different debris flow characteristics (density is varying from 1.5 t/m3 to 2.1 t/m~) and different gully longitudinal slopes. The result shows that the scour pit appears as an oval shape in a plane and deep in the middle while superficial at the ends in the longitudinal section, the position of the maximum depth point moves towards downstream with an increase of flume slope angle. The maximum depth of scour pit is mainly affected by the longitudinal slope of gully, density of debris flow, and the characteristics of gully composition (particle size and the viscosity of soil). The result also indicates that the viscosity of soil will weaken the erosion extent. The interior slopes of scour pit are different between the upstream and the downstream, and the downstream slope is smaller than the upper one. For the viscous and non-viscous sands with the same distribution of gradation, the interior slope of non- viscous sand is smaller than the viscous sand.According to tbe regression analysis on the experimental data, the quantitative relationship between the interior slope of scour pit, slope of repose under water and the longitudinal slope of gully is established and it can be used to calculate the interior slope of scour pit. The results can provide the basis for the parameter design of the debris flow control engineering foundation.  相似文献   

7.
The mega debris flow occurred on August 13 th 2010 in Qingping town,China(hereafter called ’8.13’ Debris Flow) have done great damage to the local habitants as well as to the re-construction projects in the quake-hit areas,and the channel-fill deposit problem caused by the debris flow was the most destructive.Moreover,it is of high possibility that an even severe deposit problem would reappear and result in worse consequences.In order to maximize risk reduction of this problem,relevant departments of the government established a series of emergency river restoration schemes,for which the numerical analysis is an important procedure to evaluate and determine the optimized one.This study presents a numerical analysis by applying a twodimensional debris flow model combined with a relevant water-sediment model to simulate the deposit during the progress of the debris flow,and to calculate and analyze the river flow field under both the present condition and different restoration conditions.The results show that the debris flow model,which takes the confluence of the Wenjia Gully to the main river into account,could simulate the deposit process quite well.In the reproduced debris flow from the simulation of the ’8.13’ Debris Flow,the original river flow path has switched to a relatively lower place just along the right bank with a high speed of near 7m.s-1 after being blocked by the deposit,which is highly hazardous.To prevent this hazard,a recommended scheme is derived through inter-comparison of different restoration conditions.It shows that the recommended scheme is able to reduce the water level and as well to regulate the flow path.Based on the given conditions of the mainstream and the tributary confluence for the simulated ’8.13’ Debris Flow,when encountering a debris flow with deposit volume less than 0.5 million m3,the river channel can endure a 20-year return flood;however,when the deposit volume increases to 2 million m3,the flood capacity of the river will be greatly impacted and the scheme becomes invalid.The recommended scheme supported by the present study has been applied to the emergency river restoration after this mega-debris flow.  相似文献   

8.
In the Wenchuan Earthquake area,many co-seismic landslides formed blocking-dams in debris flow channels. This blocking and bursting of landslide dams amplifies the debris flow scale and results in severe catastrophes. The catastrophic debris flow that occurred in Qipan gully(Wenchuan,Southwest China) on July 11,2013 was caused by intense rainfall and upstream cascading bursting of landslide dams. To gain an understanding of the processes of dam bursting and subsequent debris flow scale amplification effect,we attempted to estimate the bursting debris flow peak discharges along the main gully and analyzed the scale amplification process. The results showed that the antecedent and triggering rainfalls for 11 July debris flow event were 88.0 mm and 21.6 mm,respectively. The event highlights the fact that lower rainfall intensity can trigger debris flows after the earthquake. Calculations of the debris flow peak discharge showed that the peak discharges after the dams-bursting were 1.17–1.69 times greater than the upstream peak discharge. The peak discharge at the gully outlet reached 2553 m~3/s which was amplified by 4.76 times in comparison with the initial peak discharge in the upstream. To mitigate debris flow disasters,a new drainage channel with a trapezoidal V-shaped cross section was proposed. The characteristic lengths(h1 and h2) under optimal hydraulic conditions were calculated as 4.50 m and 0.90 m,respectively.  相似文献   

9.
Ma  Yanyan  Li  Guangxue  Ye  Siyuan  Zhang  Zhiheng  Zhao  Guangming  Li  Jingyang  Zhou  Chunyan  Ding  Wenjie  Yang  Xin 《中国海洋湖沼学报》2010,28(6):1362-1370
The water and sediment discharge regulation (WSDR) project, which has been performed since 2002 before flood season every year, is of great significance to the river management in China. Until 2007, six experiments have been fulfilled to evaluate the effect of the project on the natural environment. To fill the gap of investigations, a study on flood and suspended sediment transportation and channel changing along the distributary channel of the Huanghe (Yellow) River was conducted during the WSDR project period in 2007. The lower channel was scoured rapidly and the channel became unobstructed gradually several days after the flood peak water was discharged from the Xiaolangdi Reservoir. Within four days after the flood peak at 3 000 m3/s entered the distributary, the channel in the river mouth area was eroded quickly. Both the mean values of area and depth of the main channel were tripled, and the maximum flood carrying capacity increased to 5 500 m3/s or more. Then, the river channel was silted anew in a very short time after completion of the WSDR. Favored by the WSDR project, the river status in April 2008 became better than that of the year before. The adjustment ranges of main channel parameters were about 30%, 10%, and 10% at sections C2, Q4, and Q7, respectively. The process of rapid erosion-deposition was more active 15 km away in the channel from the river mouth due to the marine influence. It is reasonable for discharging sediment at concentration peak from Xiaolangdi Reservoir at the end of the flood peak. As a result, the sediment peak reached the river mouth about two days later than that of the water current. In addition, the WSDR project has improved the development of the estuarine wetland. Wetland vegetation planted along the river banks restrained the water flow as a strainer and improved the main channel stability. It is suggested to draw water at mean rate of 150 m3/s from the Huanghe River during flood periods, because at the rate the water in the wetland would be stored and replenished in balance. Moreover, we believe that cropland on the river shoal of the lower Huanghe River should be replaced by wetland. These activities should achieve the Huanghe River management strategy of “To concentrate flow to scour sediment, stabilize the main channel, and regulate water and sediment”.  相似文献   

10.
Changes in glacial lakes and the consequences of these changes, particularly on the development of water resources and management of glacial lake outburst flood(GLOF) risk, has become one of the challenges in the sustainable development of high mountain areas in the context of global warming. This paper presents the findings of a study on the distribution of, and area changes in, glacial lakes in the Koshi basin in the central Himalayas.Data on the number of glacial lakes and their area was generated for the years 1977, 1990, 2000, and 2010 using Landsat satellite images. According to the glacial lake inventory in 2010, there were a total of 2168 glacial lakes with a total area of 127.61 km~2 and average size of 0.06 km~2 in the Koshi basin. Of these,47% were moraine dammed lakes, 34.8% bedrock dammed lakes and 17.7% ice dammed lakes. The number of glacial lakes increased consistently over the study period from 1160 in 1977 to 2168 in 2010, an overall growth rate of 86.9%. The area of glacial lakes also increased from 94.44 km~2 in 1977 to 127.61 km~2 in 2010, a growth rate of 35.1%. A large number of glacial lakes in the inventory are small in size(≤ 0.1km~2). End moraine dammed lakes with area greater than 0.1 km~2 were selected to analyze the change characteristics of glacial lakes in the basin. The results show that, in 2010, there were 129 lakes greater than 0.1 km~2 in area; these lakes had a total area of 42.92km~2 in 1997, increasing to 63.28 km~2 in 2010. The distribution of lakes on the north side of the Himalayas(in China) was three times higher than on the south side of the Himalayas(in Nepal).Comparing the mean growth rate in area for the 33 year study period(1977-2010), the growth rate on the north side was found to be a little slower than that on the south side. A total of 42 glacial lakes with an area greater than 0.2 km~2 are rapidly growing between 1977 and 2010 in the Koshi basin, which need to be paid more attention to monitoring in the future and to identify how critical they are in terms of GLOF.  相似文献   

11.
冰湖溃决灾害是指冰湖坝体突然破坏引发溃决洪水或溃决泥石流的现象,对下游人类活动和自然环境造成严重影响。近年来,藏东南地区冰川快速退缩,冰湖数量和规模显著增加,冰湖溃决事件广泛发生。基于1995-2021年多时相Landsat系列遥感影像、Sentinel-2A遥感影像,结合RAMMS水文动力学模型方法,对藏东南地区多依弄巴流域内冰湖、冰川进行动态变化分析,模拟冰崩危险体触发冰湖溃决和冰湖溃决泥石流的演进过程,根据泥石流模拟中的流速和流深对冰湖溃决可能影响的区域进行危险性分区。结果表明:流域内冰川面积由1995年的14.05 km2退缩为2021年的9.43 km2,年均退缩率约为0.15 km2/a。流域内共发育3处冰崩危险体,均可能触发冰湖溃决。潜在危险冰湖在全溃情况下,溃决泥石流会冲出沟口堵塞然乌湖湖口和帕隆藏布主河道,对下游居民和道路造成影响,影响范围约4.05 km2,其中高危险性区域约2.55 km2。危险性评价结果可为多依弄巴流域未来土地利用规划和防灾减灾提供依据,也能为藏东南地区冰湖溃决型泥石流危险评估提供参考。   相似文献   

12.
Beam dams are a highly effective and commonly used open-type check dam in debris-flow hazard mitigation. In this study, dimensional analysis was used to obtain empirical equations for quantitatively determining the sediment-trapping and flow-regulating characteristics of a beam dam. To determine the coefficients of the empirical equations, flume experiments were conducted to simulate the trapping and regulating processes. The flow pattern, trapping, and regulating characteristics were investigated when debris flows passed through a beam dam. Debris-flow bulk density and peak discharge, and sediment-trapping ratios, were measured directly and indirectly. The results showed that three blocking actions occurred, and that blockage-breaking considerably influenced the trapping and regulating performance of the beam dam. The relative opening size and the sediment concentration were the two main factors affecting the performance of the beam dam. The ratio of trapping sediment decreased with relative opening, and increased with sediment concentration as well as reducing ratio of bulk density and reducing ratio of peak discharge. The sediment concentration and relative opening were the leading factors influencing the trapping and regulating sediment of a beam dam, followed by flume gradient. The results showed that the calculated values obtained using empirical equations were in good agreement with the values derived from the experiments, and that the deviation was acceptable. Finally, taking Zechawa Gully as an example, using the empirical equations we designed the opening size of a beam dam aimed to trap sediment and regulate peak discharge of debris flow in the main gully.  相似文献   

13.
Mine waste debris flows continue to occur in China, and the disaster prevention and mitigation of these flows faces severe challenges since the mechanisms determining erosion and transport of mine waste along gullies are not yet fully understood. The erosion and delivery process of mine waste heaps was reproduced through flume experiments with the method based on field survey data of the Daxicha mine waste debris flow gully in the Xiaoqinling gold mining area. The results showed that the erosion and movement of mine wastes could be divided into three modes: minimal sediment movement, sediment sorting and delivery, and a large amount of sediment transfer. Moreover, there was an obvious amplification effect on peak discharge along with the formation and failure of temporary landslide dams during the erosion process. The correlation between the coefficient of peak discharge amplification and three dimensionless influencing factors, flume gradient, dimensionless volume, and dimensionless particle size, were comprehensively analyzed. An empirical formula for the coefficient of peak discharge amplification was proposed and verified based on 16 sets of experimental data. These preliminary results can provide a scientific reference for future research on disaster prevention and mitigation of mine waste debris flows.  相似文献   

14.
The cumulative effect of cascade hydropower stations on river ecological environment has been widely concerned because of the significant streamflow hydrology change induced by dam constructions. The characteristics of the change in the lower reaches of the Jinsha River, China are analyzed based on long-term(1952–2015) hydrological and sedimentological data. The averaging coefficient, reservoir regulation coefficient(RRC), incoming sediment coefficient(ISC), and sediment transport modulus(STM), which reflect the variation of streamflow and sediment regimes, are defined and calculated. The results show that the construction and regulation of reservoirs reduces flow in flood season, increases flow in dry season, significantly altering the monthly discharge regimes. These alterations also led directly to changes in the timing of extreme flows at Pingshan Station. The monthly flow records at the basin outlet are reconstructed using stepwise regression, to reduce reservoir impacts. Comparisons of observed and reconstructed monthly flows demonstrate that the previous studies overestimated the cumulative effects of cascade reservoirs on flow processes. Furthermore, this study clearly illustrates that the reduction in sediment trapping and sediment transportation capacity together lead to the sharp reduction in annual sediment yield at the Pingshan Station. The earlier constructed reservoirs have more obvious effects on the ISC and STM than the more recent reservoirs and the effect of sediment trapping is related to reservoir location, on the main stream versus tributaries.  相似文献   

15.
TheSonghuaRiver,oneofthemajorriversinNortheastChina,hastwosources:thenorthsourceistheNenjiangRiverandthesouthsourceistheSecondSonghuaRiver.ThetrunkstreamoftheNenjiangRiver,risingatthesouthernfootoftheYilehuliMountain,is1370kmlonganditswatershedareais…  相似文献   

16.
THEORIGINANDCHARACTERISTICSOFTHEGLACIALDEBRISFLOWINTHEDUKUHIGHWAYOFTIANSHANMOUNTAINS,CHINA¥XiongHeigang(DepartmentofGeography...  相似文献   

17.
The Wenchuan earthquake caused numerous landslides and collapses that provide abundant unconsolidated material for future mobilization as debris flows.Debris flows will be very active and cause considerable damage for some time in the affected area.Because of environmental changes related to the earthquake,many potentially dangerous debris flow gullies have yet to be identified.This paper selects the upper Min River from Yinxiu to Wenchuan as the study area,interprets the unconsolidated deposits,and discusses their relationship to distance from the fault.Then,applying that information and the values of other factors relating to debris flow occurrence,the locations of potential debris flows are analyzed by multi-factor comprehensive identification and rapid identification.The multi-factor comprehensive identification employs fuzzy matter-element extension theory.The volume of unconsolidated material in the study area is about 3.28 × 108 m3.According to the analysis by multi-factor comprehensive identification,47 gullies have a high probability for potential debris flow,8 gullies have a moderate probability,and 1 gully has a low probability.  相似文献   

18.
Debris flow often causes enormous loss to life and property,especially on alluvial fans.Engineering structures such as retention check dams are essential to reduce the damage.In hazard mitigation evaluation and planning it is of significance to determine the location,size and type of dam and the effects of damage mitigation.We present a numerical simulation method using Kanako simulator for hazard mitigation planning of debris flow disaster in Tanjutani Gully,Kyoto City,Japan.The simulations were carried out for three situations:1) the simulations of erosion,deposition,hydrograph changing and inundation when there were no mitigation measures;2) the simulations of check dams in four locations(470 m,810 m,1,210 m and 1,610 m from the upstream end) to identify the best location;3) the simulations of check dams of three types(closed,slit and grid) to analyze their effects on sediment trapping and discharge reduction.Based on the simulations,it was concluded that two closed check dams(located at 470 m and 1,610 m from the upstream end) in the channel and a drainage channel on the alluvial fan can reduce the risk on the alluvial fan to an acceptable level.  相似文献   

19.
As there are many heavily sediment-laden rivers in China, with high sediment concentration and a large quantity of sediment load, the sedimentation problems of the reservoirs built on those rivers are so serious that the amount of sediment deposited in the reservoirs is great and the rate of sedimentation is accelerated. According to the statistics, up to the end of 1981, a total amount of 11.5×109m3 of sediment were accumulated in those reservoirs, i.e. 14.2% of the total designed capacity were lost. The average annual loss in storage capacity reached 2.3 percent, being the highest in the world. Silting of impounding lakes not only has an effect on the benefits of the reservoirs and seriously threatens the life of reservoirs, but also results in many environmental problems which were not fully estimated in the planning of the reservoirs. In this paper, the situation of reservoir deposition in China are described from the following aspects: 1) the characteristics of hydrology and sediment of the rivers; 2) the seriousness of reservoir sedimentation in China; 3) problems caused by reservoir deposition; 4) the methods of minimizing sediment deposition, etc.  相似文献   

20.
PROBLEMSOFRESERVOIRSEDIMENTATIONINCHINAJiangNaisen(姜乃森)FuLingyan(傅玲燕)ChinaInstituteofWaterResourcesandHydropowerResearch,Beij...  相似文献   

设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号