在介绍青藏高原多年冻土退化背景及其工程影响的基础上,通过主要冻土路基现场监测和沿线调查,对青藏铁路冻土路基2002年以来的地温发展过程、热学稳定性及次生冻融灾害进行了分析。结果表明:青藏铁路自2006年通车后冻土路基整体稳定,列车运行速度达100 km/h,达到设计要求,但不同结构路基的热学稳定性不同,采取"主动冷却"方法的路基稳定性显著优于传统普通填土路基。管道通风路基、遮阳棚路基及U型块石路基冷却下伏多年冻土的效果显著,块石基底路基左右侧对称性较差,而处于强烈退化冻土区和高温冻土区的普通路基热稳定性差,需结合路基所在区域局地气候因素予以调整或补强。以热融性、冻胀性及冻融性灾害为主的次生冻融灾害对路基稳定性存在潜在危害,主要表现为路基沉陷、掩埋、侧向热侵蚀等,其中目前最为严重的病害是以路桥过渡段沉降为代表的热融性灾害。  相似文献   

2.
This paper investigates the stability of the earthen roadbed built in the warm and ice-rich permafrost region. The varying thermal regime of the subgrade and the ongoing settlement of the roadbed were observed at field. The temperature data demonstrate that in warm and ice-rich permafrost regions, adoption of earthen roadbed results in warming of the underlying permafrost. It is primarily because the earthen roadbed traps the warm-season absorbed heat in the natural ground. In addition, the carried heat of the earthen roadbed that was constructed in warm season propagates downward to warm the underlying soil. The warming permafrost layer promotes the roadbed settlement, which was mostly linearly developed in the past five service years. A comprehensive analysis for the varying thermal regime and the ongoing settlement shows that the unfrozen water liberated from the warming, undrained layer experiences consolidation. The deformation of the undrained soils is mainly responsible for settlement of the roadbed. In comparison, the temperature variation of this warming permafrost layer is found to be less beneath roadbeds protected by thermosyphons or crushed rock revetments. The installation of thermosyphons into the earthen roadbed is recommended to prevent the further degradation of the underlying permafrost.  相似文献   

3.
青藏铁路路基创造性采用了主动冷却路基的设计理念修建而成,目前铁路已经安全运营超过10年。青藏铁路路基修筑在多年冻土之上,路基下部冻土温度变化是衡量路基是否稳定的关键因素。基于长期(2008—2019年)地温观测资料,对昆仑山垭口南坡青藏铁路K980+000低温多年冻土区块石路基坡脚至坡脚外30 m范围内的冻土上限变化、年际地温变化、季节性地温变化进行分析,研究了路基工程行为对低温多年冻土的长期影响机制。结果表明:冻土地温不断升高,冻土上限逐年下移;与天然孔比较,路基坡脚处地温增温幅度反而较小,主要可能受块石路基冷却效应的影响;冷季与暖季呈现出不对称的增温趋势。冻土路基普遍增温的趋势仍然存在,出于对多年冻土的保护与保证工程稳定性的考虑,应尽量采用冷却路基的思想修建路基。同时,应加强对路基的监测,分析长期增温过程后路基稳定性变化,并对路基下部冻土的变化做出定量研究。  相似文献   

4.
青藏铁路多年冻土斜坡段路基稳定性对铁路长期运营具有潜在的威胁,分析评价当前和未来斜坡路基稳定性可指导路基工程的正确设计和施工,从而保证铁路的安全运营。多年冻土地温变化使斜坡路基稳定性分析不同于普通土路基,其冻融交界面位置是制约斜坡路基稳定性的关键所在。通过对安多试验段3a来的地温监测,分析路基地温变化规律,并预测了未来50a内试验段地温的变化趋势,建立了当前和未来条件下的斜坡路基稳定性模型,计算分析了斜坡路基的稳定性。通过上述研究,取得以下认识和结论:(1)铁路路堤的填筑,引起多年冻土温度场重分布;由于坡向不对称和几何不对称,使得地温场存在不对称;(2)依据冻融界面位置和活动层的地温特征将冻土路基划分为4个不同时期,即冬季严寒期(1~2月)、春夏融化活动期(3~8月)、最大融深期(9~10月)及回冻活动期(11~12月);通过计算对比分析,每年最大融深期的稳定性系数最小;(3)数值分析的预测结果表明,20a以后,安多段试验段路基的多年冻土完全退化,在所预测的第10年最大融深期稳定性系数最小。  相似文献   

5.
碎石层的"热半导体"作用   总被引:11,自引:2,他引:9  
碎石层在冰缘地区有广泛分布.众多文献报道,碎石层具有降低其下地温的作用,根据这些现象,对其致冷形成机理进行了研究.结果表明:对封闭的倾斜碎石层,其致冷机制主要基于Rayleigh-Bènard对流;对开放的倾斜碎石层,其致冷机制包括“烟囱效应”和风引起的强迫对流.并进一步用模型试验、数值模拟和现场的实体试验对致冷机理进行了验证.碎石层己在青藏铁路建设中得到广泛应用,并被证明起到了冷却路基的作用.这一措施效果显著、施工简便、环境友好且成本相对较低,可用于多种冻土工程,以适应全球变暖的影响.  相似文献   

6.
青藏铁路多年冻土工程的研究与实践   总被引:29,自引:11,他引:18  
孙永福 《冰川冻土》2005,27(2):153-162
青藏铁路建设需穿越高原多年冻土区, 在探明沿线多年冻土分布特征的基础上, 合理确定了青藏铁路线路的走向方案.在多年的冻土研究和工程实践的指导下, 有针对性地开展了 5 个不同类型冻土工程试验研究, 取得重要科研成果, 指导设计和施工.全面总结4 a来青藏铁路多年冻土工程的研究与实践, 提出了“主动降温, 冷却地基, 保护冻土”的设计思想, 制定了路基、桥涵、隧道成套工程技术措施和先进施工工艺, 对确保多年冻土工程质量发挥了重要作用.  相似文献   

7.
一般地区路基土体变形主要受土体压密过程控制,青藏铁路冻土路基变形则主要是受土体冷生过程影响和控制。通过对填土路基修筑后土体冷生过程以及工程实测数据分析,指出冻融过程不同阶段冻土路基变形与土体冷生过程有着密切关系。认为控制填土路基冷生过程稳定时间和填土路基地温场形态,是减少冷生过程和铁路长期运营过程中路基变形、保证冻土区路基工程长期稳定性的有效途径。此认识已经在青藏铁路冻土区路基工程建设实践中得到证明。  相似文献   

8.
青藏铁路冻土区块石护坡路基热传递特性   总被引:2,自引:0,他引:2  
李国玉  李宁  康佳梅 《冰川冻土》2007,29(2):315-321
块石护坡路基是青藏铁路建设中一种有效的冷却地基保护冻土工程措施.考虑高原夏季夜间冷空气对块石护坡路基温度场的影响,对青藏铁路北麓河块石护坡试验路基夏季某一整天的温度场、热流量和热流密度进行了分析,研究块石护坡路基昼夜间热传递特性.结果表明:块石护坡路基在夏季白天吸收热量,在夜间冷空气的作用下路基释放一部分热量,说明夏季夜间存在一定的降温效果.另外考虑一年内冷暖季块石护坡的热传递差异,对块石护坡路基冷暖季的温度场、热流量和热流密度变化情况进行研究,探讨其冷暖季热传递特性,结果显示:块石护坡路基暖季处于吸热状态,冷季处于放热状态;从一年的热流量变化看,块石护坡路基冷季的放热量大于吸热量,路基储存冷能有利于保护冻土.  相似文献   

9.
青藏铁路普通路基下冻土过程动态评价   总被引:1,自引:0,他引:1  
本文主要利用青藏铁路北麓河厚层地下冰试验段中普通路基下部冻土温度的监测资料,对路基下部冻土温度变化和热收支特征进行了分析,并对修筑普通路基后多年冻土热融蚀敏感性和热稳定性进行了计算。结果表明,修筑普通铁路路基后,虽然多年冻土人为上限有较大幅度抬升,但原天然上限以下多年冻土温度却逐年升高,表现为显著的吸热状态。同时冻土热融蚀敏感性增强,冻土热稳定性下降,对路基热稳定性将产生较大的影响。  相似文献   

10.
路基施工对青藏高原多年冻土的影响   总被引:2,自引:2,他引:0  
青藏高原上施工会扰动其下多年冻土的存在状态. 近些年来, 高原上相继修建的大量的线性工程, 这些大型工程的建设必将进行多年冻土区的开挖和夯填, 从而会引起下伏多年冻土的结构发生很大变化. 研究了路基施工对青藏高原多年冻土的影响, 并以青藏铁路、青藏公路沿线典型实例进行分析. 结果表明: 开挖施工扰动最大, 可引起斜坡失稳滑塌、地表积水和热融湖塘等;填土路堤会引起其下伏多年冻土升温, 路基两侧形成的小气候往往起着提高地面温度的作用;挡水、排水设施施工也会导致多年冻土上限下降, 地表沉陷. 可见, 填土路基、开挖、地表工程扰动都会导致多年冻土发生变化, 这些冻土变化对路基稳定必将构成威胁.  相似文献   

11.
青藏铁路块石气冷结构路堤下冻土温度场变化分析   总被引:18,自引:7,他引:11  
马巍  吴青柏  程国栋 《冰川冻土》2006,28(4):586-595
基于青藏铁路沿线多年冻土区温度监测断面,选取了不同冻土分区中的8个块石路堤结构(块石路基、块石护坡、块石路基加块石护坡)断面,对其下温度场的变化分析研究.结果表明:经过2~3个冻融循环后,块石结构路堤下冻土上限已抬升了1.4~5.3 m,说明块石路堤结构已起到了积极调节下伏冻土温度的作用.结果也显示,在上限抬升的同时,其下部的冻土地温也在升高,但是这种过程已逐渐被块石路堤结构的降温所抑制,而这种抑制程度受控于不同的冻土区域.在不同的冻土分区中,无论是何种形式的块石路堤结构,其降温趋势是不同的.Ⅳ和Ⅲ冻土区块石路堤基底的负温积累比较明显,而I和Ⅱ区的较弱.  相似文献   

12.
在冻土地区公路建设中,由于冻融作用的存在,路基边坡土体的力学性质在周期性的冻融作用下极易发生变化。选取不同条件下的青藏公路典型路基边坡为研究对象,通过有限差分法对边坡进行剪应变对比研究。结果表明,在冻结条件下土体冻结时剪应变变化量很小,处于较稳定状态;而消融到最大状态时在含水量大的冻融界面形成软弱带,剪应变变化量很大,路基边坡处于欠稳定状态。冻融条件下土的粘聚力、内摩擦角、重度的折减引起该边坡整体抗剪强度不足,致使路基边坡有较大的剪应变。   相似文献   

13.
应用冷却路基原理建设青藏铁路   总被引:9,自引:6,他引:3  
More than half of the total length of the Qinghai-Tibet Railroad (QTR) traverses warm (0 to-1℃) permafrost areas, and about 40% of its total length is in ice-rich permafrost areas. Thc construction of the QTR also must consider the impacts of climatic warming along the QTR during the next 50~100 years. The latest projection indicates a warming of 2.2 to 2.6℃ on the Qinghai-Tibet Plateau (QTP) by the year 2050. Therefore, the key to the successful construction of the QTR is to protect permafrost from being thawed. Although railroad construction in permafrost areas has had a history of more than 100 years, the troubled sections of the railroads in permafrost areas have been greater than 30% of their total length. Based on the experiences and lessons learned from the road construction in permafrost areas, both in China and abroad, the author proposes that the principle of “active cooling” of railroad roadbed by lowering permafrost temperatures should be used in designing QTR, rather than that of “passive protection” of permafrost through increasing thermal resistance of roadway, such as increasing fill thickness and/or using insulative materials. This is especially important for the road sections in warm, ice-rich permafrost. In addition, this paper proposes several methods for “cooling the roadbcd” by controlling radiation, convection and conduction through modifying roadway structure and using different fill materials.  相似文献   

14.
青藏铁路多年冻土区工程复杂性分析   总被引:1,自引:1,他引:1  
青藏铁路穿越550km多年冻土区,多年冻土地温、冻土类型以及沿线生态环境等存在较大的差异,使多年冻土区工程较为复杂。因此本文提出了冻土工程复杂性概念,建立冻土工程复杂性评价模型,并利用GIS平台对青藏铁路沿线唐古拉山越岭地段工程复杂性进行了分析和研究。研究结果表明,青藏铁路穿越的唐古拉山越岭地段工程复杂性相对较小,而青藏公路的工程复杂性相对较大。这表明了青藏公路沿线冻土工程比青藏铁路沿线更为复杂,在各种因素的影响下,青藏公路路基稳定性变化比青藏铁路更加复杂。  相似文献   

15.
王釭 《冰川冻土》2007,29(2):327-332
结合工程实例详细介绍青藏铁路高原多年冻土地段片石通风路堤的参数选择、施工方法以及保证措施.通过以上的施工技术,取得了相应的阶段性成果:片石路基片石层顶面、底面与路基基底位置处地温分别低于普通路基相同位置处地温,片石路基有利于降低路基地温,是一种有效的主动保护多年冻土工程措施;片石路基在调节路基阴阳坡地温起到了积极的作用,减轻了路基地温不对称性的发生;对比片石路基和普通路基的路基变形量,片石路基的变形量相对较小.  相似文献   

16.
采用多孔介质中流体的连续性方程、动量方程及能量方程,针对青藏铁路的气温和地质条件,对抛石护坡路基(无保温材料)及其在靠近路基顶部增设保温材料后的温度场特征进行了分析和比较.结果表明:在年平均气温为-4.0℃的青藏高原多年冻土区,考虑未来50 a气温上升2.6℃条件下,抛石护坡路基对其下部多年冻土可起到一定的保护作用;但由于气温升高的影响,路基中心处出现终年融化夹层;计算中发现当抛石护坡达到一定厚度时,单纯依靠增加抛石护坡厚度并不能明显增加其对路基中心处的降温效果;而增设保温材料后的抛石护坡路基可有效减小路基中出现的融化夹层,确保冻土路基的稳定.因此,建议在高温多年冻土区使用抛石护坡路基结构时,应考虑使用保温材料作为一种对抛石护坡路基进行保温补强的措施.  相似文献   

17.
青藏铁路多年冻土区普通路基热状况监测分析   总被引:1,自引:1,他引:0  
基于现场地温监测数据,选取年平均地温不同的监测断面对青藏铁路普通路基的热状况进行分析,包括多年冻土上限变化及其地温变化、下伏多年冻土温度变化、原天然地表附近热收支等方面. 结果表明:在低温多年冻土区,路基下部多年冻土上限均有所提升,且新近形成的人为上限较为稳定,冷季时负温积累显著;路基下伏多年冻土总体热稳定性较好. 而在高温多年冻土区,左(阳坡)路肩下部多年冻土上限多表现为下降,右(阴坡)路肩下部多年冻土上限有升有降,但是新近形成的上限均温度较高且有进一步升温的趋势;与天然场地地温相比,路基下部多年冻土均出现一定的升温. 尤其在高温极不稳定多年冻土区,天然场地多年冻土自身处于吸热升温状态;路基修筑后,下部多年冻土已经出现了融化夹层及双向退化的情况,路基热稳定性较差. 对于普通路基来说,由于青藏高原强烈的太阳辐射及青藏铁路总体走向原因,普通阴阳坡效应显著,左、右路肩下部多年冻土热稳定性差异较大.  相似文献   

18.
青藏铁路沿线多年冻土分布特征及其对环境变化的响应   总被引:1,自引:0,他引:1  
针对青藏高原特殊的自然气候条件,按照地形、地貌把青藏铁路沿线多年冻土分为15个区段,并分别介绍了各个区段多年冻土特征. 结果表明:在外界环境变化,包括全球气候变暖及工程活动的双重效应下,青藏铁路沿线多年冻土及其存在状态发生了极大变化,这些变化主要包括年平均气温升高、多年冻土退化、热融灾害增加、寒区工程病害不断加剧等. 多年冻土及其存在状态发生变化不但导致生态环境恶化,而且对青藏铁路沿寒区工程的安全运营、维护及发展提出新的挑战.  相似文献   

19.
Widespread warm permafrost with a high ice content is a key problem for the roadbed stability of the Qinghai–Tibet Railway. A new approach is proposed to alleviate the effect of global warming and engineering construction on permafrost by cooling the roadbed and positively protecting the permafrost. Measures for cooling the roadbed by adjusting solar radiation, conduction, and convection are studied and applied to prevent ground ice from thawing and to ensure roadbed stability in permafrost regions. The results of monitoring permafrost embankments at Beiluhe and along the Qinghai–Tibet Railway show that the measures adopted for cooling the roadbed are very effective in raising permafrost table and reducing the soil temperature.  相似文献   

20.
石梁宏  李双洋  尹楠 《冰川冻土》2021,43(1):195-203
多年冻土是含有冰的特殊土体,在自然环境变化及工程扰动下易发生冻胀融沉变形,严重威胁着青藏高原工程建筑物的安全稳定,特别对青藏铁路的畅通运营提出了严峻挑战。以青藏铁路五道梁地区路基断面为研究对象,采用颗粒离散单元法,通过建立热-力离散元计算模型,对路基的温度场和变形进行了计算和预测。结果表明:离散单元法克服了有限元方法无法模拟颗粒间导热与接触粘结作用的瓶颈,能够从微观层面阐释宏观变化,较为真实地反映冻土的导热和力学变形;离散单元法数值计算分析发现,随着运营时间的增加,路基存在冻土退化问题,而且路基中颗粒间热交换复杂,在0 ℃等温线区域和路基坡脚处,颗粒间相互作用更为突出。热-力耦合离散元为冻土工程研究提供了新思路,可更好地为寒区工程服务。  相似文献   