首页 | 本学科首页   官方微博 | 高级检索  
相似文献
 共查询到20条相似文献,搜索用时 31 毫秒
1.
The adjustment of the bankfull channel area in the Lower Yellow River has been dramatically affected by altered flow regimes caused by human activities. This paper presents a study on the effects of altered discharge and suspended sediment load on the bankfull area at Gaocun, a representative hydrometric station in the Lower Yellow River. The analysis demonstrates the cumulative effect of previous years' flow and sediment conditions on channel adjustment, a phenomenon commonly occurring in geomorphic systems due to the delayed channel response to flow and sediment conditions. A methodology for the prediction of bankfull area was developed based on the general concept that the rate of adjustment is proportional to the difference between the bankfull area and its equilibrium value. The proposed methodology is not only applicable for the prediction of the bankfull area in response to the changes in flow and sediment conditions in the Lower Yellow River, but can also be extended to other studies where the response times have a key role to play in the assessment of channel adjustment to external changes. Copyright © 2008 John Wiley & Sons, Ltd.  相似文献   

2.
This paper presents a study on the characteristics of multiple time scales of bankfull discharge and its delayed response to changes of flow conditions using continuous wavelet analysis for data from selected hydrological stations in the Yellow River basin. Results showed that bankfull discharge series had one or two dominant time scales. For example, the Huayuankou station in the lower reach of the Yellow River had two dominant time scales of 19-20 years and 545 years. The dominant time scales of the bankfull discharge series were generally consistent with the dominant time scales of water discharge and sediment concentration series, indicating that the channel morphology inherits the characteristics of the hydrological system in terms of multiple time scales. In addition, the wavelet coefficients of the bankfull discharge series had a phase difference in relation to those of the sediment concentration series, with a delay time that varied from 3 to 16 years at different sites. This delay time or relaxation time is a result of the delayed response of bankfull discharge to flow conditions, which was significant for channel adjustments in response to changes of flow conditions. The findings of the multiple time scales and the delayed response are of importance for further study of channel morphology of fluvial systems.  相似文献   

3.
Bankfull discharge is a key parameter in the context of river engineering and geomorphology, as an indicator of flood discharge capacity in alluvial rivers, and varying in response to the incoming flow and sediment regimes. Bankfull channel dimensions have significantly adjusted along the Lower Yellow River (LYR) due to recent channel degradation, caused by the operation of the Xiaolangdi Reservoir, which has led to longitudinal variability in cross‐sectional bankfull discharges. Therefore, it is more representative to describe the flood discharge capacity of the LYR, using the concept of reach‐averaged bankfull discharge. Previous simple mean methods to estimate reach‐scale bankfull discharge cannot meet the condition of flow continuity or account for the effect of different spacing between two sections. In this study, a general method to calculate cross‐sectional bankfull discharge using the simulated stage‐discharge relation is outlined briefly, and an integrated method is then proposed for estimating reach‐scale bankfull discharge. The proposed method integrates a geometric mean based on the log‐transformation with a weighted average based on the spacing between two consecutive sections, which avoids the shortcomings of previous methods. The post‐flood reach‐scale bankfull discharges in three different channel‐pattern reaches of the LYR were estimated annually during the period from 1999 to 2010 using the proposed method, based on surveyed post‐flood profiles at 91 sedimentation sections and the measured hydrological data at seven hydrometric sections. The calculated results indicate that: (i) the estimated reach‐scale bankfull discharges can effectively represent the flood discharge capacity of different reaches, with their ranges of variation being less than those of typical cross‐sectional bankfull discharges; and (ii) the magnitude of the reach‐scale bankfull discharge in each reach can respond well to the accumulative effect of incoming flow and sediment conditions. Finally, empirical relationships for different reaches in the LYR were developed between the reach‐scale bankfull discharge and the previous four‐year average discharge and incoming sediment coefficient during flood seasons, with relatively high correlation coefficients between them being obtained, and the reach‐scale bankfull discharges in different reaches predicted by the delayed response model were also presented for a comparison. These relations for the prediction of reach‐scale bankfull discharges were validated using the cross‐sectional profiles and hydrological data measured in 2011. Copyright © 2013 John Wiley & Sons, Ltd.  相似文献   

4.
The equilibrium relations for water and sediment transport refer to the relative balance of sediment transport and the relative stability of river courses formed by the automatic adjustment of riverbeds.This is the theoretical basis for the comprehensive management of sediment in the Yellow River.Based on the theories of sediment carrying capacity and the delayed response of riverbed evolution,in this study,the equilibrium relations for water and sediment transport in the Yellow River are established.These relations include the equilibrium relationships between water and sediment transport and bankfull discharge in the upper and lower Yellow River and between water and sediment transport and the Tongguan elevation in the middle Yellow River.The results reveal that for the Ningmeng reach,the Tongguan reach,and the lower Yellow River,erosion and deposition in the riverbeds are adjusted automatically,and water and sediment transport can form highly constrained equilibrium relationships.These newly established equilibrium relationships can be applied to calculate the optimal spatial allocation scheme for sediment in the Yellow River.  相似文献   

5.
Upstream damming often causes significant downstream geomorphic adjustments. Remarkable channel changes have occurred in the Jingjiang Reach of the Middle Yangtze River, since the onset of the Three Gorges Project (TGP). Therefore, it is important to investigate the variations in different fluvial variables, for better understanding of the channel evolution characteristics as an example of the Jingjiang Reach. Recent geomorphic adjustments in the study reach have been investigated quantitatively, including variations in sediment rating curve, fluvial erosion intensity, channel deformation volume and bankfull channel geometry. These fluvial variables adjusted in varying degrees in response to the altered flow and sediment regime caused by the TGP operation. A focus of this study has been especially on variation in the bankfull channel geometry. Calculated bankfull dimensions at section‐ and reach‐scale indicate that: (i) there were significant bank‐erosion processes in local regions without bank‐protection engineering, with empirical relations being developed to reproduce the variation in bankfull widths at four typical sections; (ii) the variation in the reach‐scale channel geometry occurred mainly in the component of bankfull depth, owing to the construction of large‐scale bank‐revetment works, with the depth increasing from 13.7 m in 2002 to 15.0 m in 2014, and with an increase in the corresponding bankfull area of about 11%; and (iii) the reach‐scale bankfull channel dimensions responded to the previous 5‐year average fluvial erosion intensity during flood seasons at Zhicheng, with higher correlations for the depth and area being obtained when calibrated by the measurements in 2002–2012. Furthermore, these relations developed for the section‐ and reach‐scale bankfull channel geometry were also verified by the observed data in 2013–2014, with encouraging results being obtained. Copyright © 2016 John Wiley & Sons, Ltd.  相似文献   

6.
Along the lower reaches of the Waipaoa River, New Zealand, cross‐section survey data indicate there was a 23 per cent decrease in bankfull width and a 22 per cent reduction in channel cross‐section area between 1948 and 2000, as the channel responded to increased inputs of fine (suspended) sediment following deforestation of the headwaters in late C19 and early C20. We determined the bankfull discharge within a ~39 km long reach by routing known discharges through the one‐dimensional MIKE 11 flow model. The model runs suggest that the bankfull discharge varies between ~800 and ~2300 m3 s?1 and that the average recurrence interval is 4 ± 2 years on the annual maximum series; by contrast, the effective flow (360 m3 s?1) is equaled or exceeded three times a year. The variability in bankfull discharge arises because the banks tend to be lower in places where flood flows are constricted than in reaches where overbank flow is dispersed over a wide area, and because scour has counteracted aggradation in some locations. There is no downstream variation in Shields stress, or in relative shear stress, within the study reach. Bankfull shear stress is, on average, five times greater than the shear stress required to initiate motion. At the effective discharge it is more than twice the threshold value. The effective discharge probably has more relevance than the bankfull discharge to the overall picture of sediment movement in the lower reaches of the Waipaoa River but, because width is constrained by the stability and resistance of the bank material to erosion during high flows that also scour the bed, the overall channel geometry is likely determined by discharges at or near bankfull. Copyright © 2006 John Wiley & Sons, Ltd.  相似文献   

7.
三峡工程运用后城陵矶-武汉河段河床调整及崩岸特点   总被引:1,自引:1,他引:0  
为研究近期城汉河段河床调整及崩岸特点,利用实测水沙及地形等资料,采用河段平均的方法,计算了城汉河段断面形态的调整过程,主要包括平滩河槽形态调整及其与前期水沙条件之间的关系.计算结果表明:城汉河段平滩河宽由2003年的1710 m增加至2016年的1732 m,增幅为1.28%,平滩水深由2003年的16.47 m增加至2016年的17.95 m,增幅为9.0%;白螺矶、界牌、簰洲及武汉等河段河床调整以纵向冲深为主,但陆溪口河段河床调整横向展宽与纵向冲深同步发展;2006-2016年城汉河段多年平均崩退速率为5.5 m/a,崩岸总长19.6 km,占岸线总长的8.3%,右岸占55.3%.簰洲河段岸线崩长占城汉河段岸线崩退总长的75.9%.此外还分析了河床边界与水沙条件等因素对重点河段(簰洲河段)崩岸过程的影响,来水来沙条件占主导地位,局部区域崩岸的发生依赖于河床边界条件;建立了典型断面平滩河宽与前期水沙条件之间的经验关系,较好地反映了水沙条件变化对崩岸过程的影响.  相似文献   

8.
This paper studies relations between bankfull discharge,lateral cross section variation and the incoming flow and sediment condition in the Lower Yellow River using measured data from 1950 to 2003.Since 1950 the bankfull discharge has obviously decreased and the ratio of channel width to flow depth has increased.The critical annual average incoming sediment coefficient(defined as the ratio of sediment concentration to discharge) and discharge at the Huayuankou station are approximately 0.012 and 1,850 m3s-1,respectively,for no accumulative deposition occurring in the reach from Huayuankou to Lijin.On this basis,a mathematical model is used to study the scale of the main channel in the Lower Yellow River and its corresponding bankfull discharge under possible incoming flow and sediment conditions in the near future.The main factors influencing the scale of the main channel are analyzed,and measures to shape and maintain a medium-sized channel are discussed.The results show the effect of various water and sediment combinations released from the Xiaolangdi Reservoir on the shaping of the main channel and suggest that under recent incoming flow and sediment conditions,it is possible to shape and maintain a medium-sized channel with a bankfull discharge of approximate 4,000 m3 s-1.  相似文献   

9.
The channel boundary conditions along the Lower Yellow River (LYR) have been altered significantly since the 1950s with the continual reinforcement and construction of both main and secondary dykes and river training works. To evaluate how the confined complex channel–floodplain system of the LYR responds to floods, this study presents a detailed investigation of the relationship between the tempo‐spatial distribution of sedimentation/erosion and overbank floods occurred in the LYR. For large overbank floods, we found that when the sediment transport coefficient (ratio of sediment concentration of flow to flow discharge) is less than 0.034, the bankfull channel is subject to significant erosion, whereas the main and secondary floodplains both accumulate sediment. The amount of sediment deposited on the main and secondary floodplains is closely related to the ratio of peak discharge to bankfull discharge, volume of water flowing over the floodplains, and sediment concentration of overbank flow, whereas the degree of erosion in the bankfull channel is related to the amount of sediment deposited on the main and secondary floodplains, water volume, and sediment load in flood season. The significant increase in erosion in the bankfull channel is due to the construction of the main and secondary dykes and river training works, which are largely in a wide and narrow alternated pattern along the LYR such that the water flowing over wider floodplains returns to the channel downstream after it drops sediment. For small overbank floods, the bankfull channel is subject to erosion when the sediment transport coefficient is less than 0.028, whereas the amount of sediment deposited on the secondary floodplain is associated closely with the sediment concentration of flow. Over the entire length of the LYR, the situation of erosion in the bankfull channel and sediment deposition on the main and secondary floodplains occurred mainly in the upper reach of the LYR, in which a channel wandering in planform has been well developed.  相似文献   

10.
三峡工程运行后,坝下游河道发生持续冲刷。本文研究了长江中游(955 km)不同河段沿程演变差异及其原因。总体而言,河床形态调整幅度自上而下减弱,这是因为在河床持续冲刷过程中,水流含沙量沿程恢复,故越往下游冲刷相对缓慢。平面形态方面,长江中游岸线崩退及洲滩变形的强度均呈沿程减弱趋势,且在荆江河段最为显著。断面形态方面,河床冲深幅度在宜枝下段>荆江河段>宜枝上段>城汉河段>汉湖河段。理论上距离三峡工程最近的河段冲刷应最为剧烈,但由于宜枝上段床沙粗化显著,限制了冲刷的进一步发展。过流能力方面,宜枝河段由于距洞庭湖较远,并未受到入汇顶托作用,故其平滩流量的调整基本由进口水沙条件控制,并随着河床冲深下切而增大;对于荆江、城汉和汉湖河段,河床冲刷虽显著,但支流或湖泊的入汇顶托对平滩流量产生的影响大于前者,故平滩流量总体随上下游水位差同步波动。  相似文献   

11.
We consider the evolution of the hydraulic geometry of sand-bed meandering rivers. We study the difference between the timescale of longitudinal river profile adjustment and that of channel width and depth adjustment. We also study the effect of hydrological regime alteration on the evolution of bankfull channel geometry. To achieve this, a previously developed model for the spatiotemporal co-evolution of bankfull channel characteristics, including bankfull discharge, bankfull width, bankfull depth and down-channel bed slope, is used. In our modelling framework, flow variability is considered in terms of a specified flow duration curve. Taking advantage of this unique feature, we identify the flow range responsible for long-term bankfull channel change within the specified flow duration curve. That is, the relative importance of extremely high short-duration flows compared to moderately high longer duration flows is examined. The Minnesota River, MN, USA, an actively meandering sand-bed stream, is selected for a case study. The longitudinal profile of the study reach has been in adjustment toward equilibrium since the end of the last glaciation, while its bankfull cross-section is rapidly widening due to hydrological regime change in the last several decades. We use the model to demonstrate that the timescale for longitudinal channel profile adjustment is much greater than the timescale for cross-sectional profile adjustment due to a lateral channel shift. We also show that hydrological regime shift is responsible for the recent rapid widening of the Minnesota River. Our analysis suggests that increases in the 5–25% exceedance flows play a more significant role in recent bankfull channel enlargement of the Minnesota River than increase in either the 0.1% exceedance flow or the 90% exceedance flow. © 2020 John Wiley & Sons, Ltd.  相似文献   

12.
Since 1960, geomorphic effectiveness has been quantified by analytically combining measures of the frequency and the magnitude of geomorphic processes, most often for the case of sediment yield in rivers via the calculation of effective discharge, Qeff. Here we leverage the Qeff analysis approach to develop an alternative metric, the functional‐equivalent discharge Qfed, which is the discharge that will reproduce the magnitude of the sediment load generated by the full hydrologic distribution. Qfed is intended to be a more representative metric of hydrologic variability than Qeff: whereas Qeff provides a measure of the effectiveness of individual flow rates, Qfed incorporates a measure of the average effectiveness of the entire flow distribution. We develop an analytical approximation of Qfed based on relatively few parameters, apply the approach to a set of suspended sediment load data and describe how Qfed varies broadly with sediment and hydrologic conditions. Copyright © 2007 John Wiley & Sons, Ltd.  相似文献   

13.
The lower Yellow River channel was maintained by artificial levees between 1580 and 1849. During this period, 280 levee breaches occurred. To estimate sediment storage on the floodplains outside the levees, a regression model with a decadal time step was developed to calculate the outflow ratio for the years when levee breaching occurred. Uncertainty analysis was used to identify the likely outflow ratio. Key variables of the model include annual water discharge, a proxy for levee conditions, and potential bankfull discharge of the channel before flood season. Uncertainty analysis reveals an outflow ratio of 0.35–0.56. We estimate that during this period, 18.8–30.1% of the total ~312 Gt of sediment load was deposited on the floodplains outside the levees. Human-accelerated erosion in the Loess Plateau caused a 4-fold increase in sediment delivery to the lower Yellow River, which could not be accommodated by channel morphodynamic changes. As a result, 21.2–27.5% of the total sediment load was deposited within the levees, creating a super-elevated channel bed that facilitated an uncommonly high breach outflow ratio. Hence, the factor of a large super-elevation relative to the mean main channel depth should be considered when designing diversions to restore floodplains. © 2018 John Wiley & Sons, Ltd.  相似文献   

14.
Regulated rivers generally incise below dams that cut off sediment supply, but how that happens and what the consequences are at different spatial scales is poorly understood. Modern topographic mapping at meter‐scale resolution now enables investigation of the details of spatial processes. In this study, spatial segregation was applied to a meter‐scale raster map of topographic change from 1999 to 2008 on the gravel‐cobble, regulated lower Yuba River in California to answer specific scientific questions about how a decadal hydrograph that included a flood peak of 22 times bankfull discharge affected the river at segment, reach, and morphological unit scales. The results show that the river preferentially eroded sediment from floodplains compared to the channel, and this not only promoted valley‐wide sediment evacuation, but also facilitated the renewal and differentiation of morphological units, especially in the channel. At the reach scale, area of fill and mean net rate of elevational change were directly correlated with better connectivity between the channel and floodplain, while the mean rate of scour in scour areas was influenced by the ratio of slope to bankfull Froude number, a ratio indicative of lateral migration versus vertical downcutting. Hierarchical segregation of topographic change rasters proved useful for understanding multi‐scalar geomorphic dynamics. Copyright © 2016 John Wiley & Sons, Ltd.  相似文献   

15.
The response of sediment discharge rate to the following four ecohydrological factors: temperature, rainfall, evapotranspiration (ET), and stream flow was evaluated by conducting wavelet analysis on Luergou small catchment data ranging from 1982 to 2000. For sediment discharge rate, there was an overall trend of reduction that included a periodic oscillation of 6 to 7 years per cycle. Rainfall also had an overall trend of reduction that included two periodic oscillations of 7 years per cycle and 2 years per cycle, respectively. Stream flow had the same trend as rainfall but had one periodic oscillation of 6 to 7 years per cycle. In contrast with rainfall and stream flow, the trends for temperature and ET each showed an overall increasing tendency, and both had the same two periodic oscillations of 6 to 7 years per cycle and 4 years per cycle, respectively. The sediment discharge rate had significant relationships with the four ecohydrological factors, with stream flow and rainfall having positive correlations, while ET and temperature had negative correlations. The correlation between ET and sediment discharge rate became stronger when ET was compared to the sediment discharge rate of the following year. The relationship between sediment discharge rate and the four ecohydrological factors was further expressed by the multi-linear regression model that was constructed, which makes sediment discharge rate a function of stream flow, rainfall, ET, and temperature.  相似文献   

16.
1 mTRonvcnox: moareS Aun CoxcmSAJluvial rivers have the pOtenhal to adjust their shaPe and dimensions to all flows that tranSPOrtsediment, but Inglis (l94l) suggested that, for rivers that are in regime, a single steady flow could beidenhfied which would Produce the same bankfll dimensions as the natural sequence of events. Hereferrd to this now as the dondnan discharge.Wolman and Mller (l960) idenhfied that the flow doing most bed material transPort over a period ofyears may be taken tO…  相似文献   

17.
Bankfull discharge is identified as an important parameter for studying river morphology, sediment motion, flood dynamics and their ecological impacts. In practice, the determination of this discharge and its hydrological characteristics is not easy, and a choice has to be made between several existing methods. To evaluate the impact of the choice of methods, five bankfull elevation definitions and four hydrological characterizations (determination of duration and frequency of exceedance applied to instantaneous or mean daily data) were compared on 16 gravel‐bed river reaches located in France (the catchment sizes vary from 10 km2 to 1700 km2). The consistency of bankfull discharge estimated at reach scale and the hydraulic significance of the five elevation definitions were examined. The morphological definitions (Bank Inflection, Top of Bank) were found more relevant than the definitions based on a geometric criterion. The duration of exceedance was preferred to recurrence intervals (partial duration series approach) because it is not limited by the independency of flood events, especially for low discharges like those associated with the Bank Inflection definition. On average, the impacts of the choice of methods were very important for the bankfull discharge magnitude (factor of 1·6 between Bank Inflection and Top of Bank) and duration of exceedance or frequency (respectively a factor 1·8 and 1·9 between mean daily and instantaneous discharge data). The choice of one combination of methods rather than another can significantly modify the conclusions of a comparative analysis in terms of bankfull discharge magnitude and its hydrological characteristics, so that one must be cautious when comparing results from different studies that use different methods. Copyright © 2006 John Wiley & Sons, Ltd.  相似文献   

18.
Equilibrium is defined as a single-valued, temporally invariant functional relationship between the values of an output variable and the values of the input variable(s) in a geomorphic system. Disequilibrium occurs if the output deviates from the functional relationship by more than a consensual degree. Natural geomorphic variables are characterized by a relaxation time. Output variables are insensitive to cyclical inputs with frequencies much greater than the relaxation time, but can respond completely for sufficiently low frequencies. Rapid trends, recent step changes or pulse inputs, and intermediate frequency inputs can cause disequilibrium. The gradient of sand-bed alluvial channels (the output variable) is determined by sediment and water delivery from slopes (the input variables), and changes in this hydraulic regime require regrading by erosion and deposition. Initial stages of adjustment to changed regime in a long, unbranched channel with sediment and water delivery only at the upstream end propagate downstream, but later stages of adjustment occur simultaneously throughout the reach. In a dendritic channel network the gradient responds rather uniformly throughout the network to changes in regime during all stages of adjustment. The time scale of adjustment to changed regime depends upon the size of the channel network (or stream length), the sediment and water discharges, and to a lesser degree upon the magnitude of the change. Grade as defined by Mackin (1948) is synonymous with equilibrium as used in this paper if ‘a period of years’ is replaced by ‘a time period commensurate with the relaxation time of the gradient’. The use of the term grade is best restricted to a single-valued relationship between channel gradient and the hydraulic regime.  相似文献   

19.
Field, laboratory, and numerical modelling research are increasingly demonstrating the potential of riparian tree colonization and growth to influence fluvial dynamics and the evolution of fluvial landforms. This paper jointly analyses multi‐temporal, multispectral ASTER data, continuous river stage and discharge data, and field observations of the growth rates of the dominant riparian tree species (Populus nigra) along a 21 km reach of the Tagliamento River, Italy. Research focuses on the period 2004–2009, during which there was a bankfull flood on 24 October 2004, followed by 2 years with low water levels, nearly 2 years with only modest flow pulses, and then a final period from 15 August 2008 that included several intermediate to bankfull flow events. This study period of increasing flow disturbance allows the exploration of vegetation dynamics within the river's active corridor under changing flow conditions. The analysis demonstrates the utility of ASTER data for investigating vegetation dynamics along large fluvial corridors and reveals both spatial and temporal variations in the expansion, coalescence, and erosion of vegetated patches within the study reach. Changes in the extent of the vegetated area and its dynamics vary along the study reach. In sub‐reaches where riparian tree growth is vigorous, the vegetated area expands rapidly during time periods without channel‐shaping flows, and is subsequently able to resist erosion by bankfull floods. In contrast, in sub‐reaches where tree growth is less vigorous, the vegetated area expands at a slower rate and is more readily re‐set by bankfull flood events. This illustrates that the rate of growth of riparian trees is crucial to their ability to contribute actively to river corridor dynamics. Copyright © 2011 John Wiley & Sons, Ltd.  相似文献   

20.
Average pool spacing between five and seven bankfull widths has been documented in environments throughout the world, but has limited theoretical justification in coarse‐bedded and bedrock environments. Pool formation in coarse‐bedded and bedrock channels has been attributed to bedrock and boulder constrictions. Because the spacing of these constrictions may be irregular in nature, it is difficult to reconcile pool‐formation processes with the supposedly rhythmic spacing of pools and riffles. To address these issues, a simulation model for pool and riffle formation is used to demonstrate that semi‐rhythmic spacing of pools with an approximate spacing of five to seven bankfull widths can be recreated from a random distribution of obstructions and minimum pool‐ and riffle‐length criteria. It is assumed that a pool–riffle couplet will achieve a minimum length based on dominant‐discharge conditions. Values for the minimum‐length assumption are based on field data collected in New England and California, while the theoretical basis relies on the demonstrated hydraulic response of individual pools to elongation. Results from the simulations show that the location of pools can be primarily random in character, but still assume an average spacing between four and eight bankfull widths for a variety of conditions. Field verification data generally support the model but highlight a highly skewed distribution of pool‐forming elements and pool spacing. The relation between pool spacing and bankfull widths is attributed to the common geometric response of these features to dominant‐discharge conditions. Copyright © 2001 John Wiley & Sons, Ltd.  相似文献   

设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号