首页 | 本学科首页   官方微博 | 高级检索  
相似文献
 共查询到20条相似文献,搜索用时 361 毫秒
1.
In this paper, we further elaborate on a methodology dedicated to the modeling of geotechnical data to be used as input in numerical simulation and TBM performance codes. The expression “geotechnical data” refers collectively to the spatial variability and uncertainty exhibited by the boundaries and the mechanical or other parameters of each geological formation filling a prescribed 3D domain. Apart from commercial design and visualization software such as AutoCAD Land Desktop® software and 3D solid modelling and meshing pre-processors, the new tools that are employed in this methodology include relational databases of soil and rock test data, Kriging estimation and simulation methods, and a fast algorithm for forward or backward analysis of TBM logged data. The latter refers to the continuous upgrade of the soil or rock mass geotechnical model during underground construction based on feedback from excavation machines for a continuous reduction of the uncertainty of predictions in unsampled areas. The approach presented here is non-intrusive since it may be used in conjunction with a commercial or any other available numerical tunneling simulation code. The application of these tools is demonstrated in Mas-Blau section of L9 tunnel in Barcelona.  相似文献   

2.
隧洞围岩分类与洞径和超欠挖之间的关系研究   总被引:5,自引:0,他引:5  
孙少锐  吴继敏  魏继红 《岩土力学》2005,26(8):1278-1282
岩体的地质结构特征是影响隧洞围岩超欠挖的主要因素,正确评价岩体的质量,对岩体进行分类,并研究岩体质量与隧洞超欠挖之间的关系对分析和预测隧洞超欠挖具有重要的意义。对隧洞围岩的RMR分类和Q分类与超欠挖之间的关系进行了详细研究,研究了在同类岩体条件下不同开挖洞径与隧洞超欠挖之间的关系,并由此建立了RMR分类和Q分类之间的关系,得出围岩的RMR分类和Q分类与隧洞超欠挖呈线性关系和对数线性关系,根据超欠挖建立起来的RMR分类和Q分类之间的关系比较符合工程实际。最后研究了超欠挖与围岩分类及洞径之间的复相关关系。  相似文献   

3.
Summary. Tunnel face and wall collapse are common during excavations performed by tunnel boring machines (TBMs) due to the difficulty of correctly identifying the properties of the excavated rock. This identification, however, can be simplified by using the cutting force to estimate rock strength, a method that has already proved quite successful in Japanese tunnel excavations. This paper summarizes knowledge relating to the cutting force obtained through tunnel excavation experience, and the relationship between rock strength and TBM operation is discussed. Although TBM operators rely on intuition to set the cutter head speed appropriately, this decision process represents a logical method of operation that takes advantage of the variable speed capability of the cutter head. Selection of appropriate support methods for the excavated face is also a critical issue in tunnel excavation. This selection process is based on the condition of the rock, which is difficult to determine quickly and accurately during tunnel excavation. The present paper uses the excavation of two tunnels to demonstrate that it is possible to assign rock mass classifications accurately based on rock strength when boring a uniform rock type. It is also shown that the rock mass can be classified from the rock strength normalized by the uniaxial compressive strength when boring through mixed rock types.  相似文献   

4.
Summary The paper analyses the influence of rock mass quality on the performance of a double shield TBM in the excavation of a tunnel in a gneiss formation which is characterized by high strength and low fracture intensity.As full observation of the rock conditions was prevented by the use of segmental lining, a geomechanical survey of the face was performed during maintenance downtime and the observed conditions were correlated with the machine performance parameters for that same day. A statistical analysis of the data shows that penetration rate correlates well with a slightly modified RMR index (in which the influence of the water conditions and joint orientation were discounted), but the most important factor is by far the partial rating of the RMR classification related to joint spacing only. However in tunnels characterized by greater variability in rock strength and joint conditions, it could be worthwhile using the complete RMR index.Given the toughness of the rock, failure of the cutter bearings and supports were a frequent occurrence during excavation. Owing to this factor the influence of rock quality on the rate of advance was found to be weak and the correlation more scattered.The results obtained for the Varzo tunnel were compared with those relative to other tunnels in granitic rocks and found to be in good agreement. However the relationships obtained should be considered valid only for this type of rock; machine behaviour could be found to be markedly different in other rock types, even where rock material strength and joint frequency are the same.  相似文献   

5.
TBM滚刀破岩过程影响因素数值模拟研究   总被引:3,自引:0,他引:3  
全断面岩石掘进机(TBM)的破岩效率主要受刀盘设计和岩体特征的影响。采用颗粒流方法建立了岩石试件与滚刀的数值模型,对TBM滚刀破岩过程的影响因素进行了分析。研究表明,单刃滚刀交替作用下强度较低的岩石中易形成规则的张拉裂纹而生成较大岩碴;强度较高的岩石中滚刀的侧向挤压促使形成块度较小的片状岩碴;双刃滚刀作用下岩石表面受到强烈挤压后出现较大的拉应力,使岩石更易破碎,且仅在强度较高的岩石中才易形成透镜状岩碴。滚刀破岩过程中存在能耗最小的最佳间距,该最佳间距随着岩石强度的增大而减小。滚刀破岩过程中,结构面对裂纹扩展具有显著的控制性作用,并阻隔损伤向结构面下的岩石中渗透;随着结构面与滚刀侵入方向夹角的减小,结构面将引导裂纹向岩石深部扩展,而当夹角较大时,结构面则会引导裂纹横向扩展,易导致大块岩碴的形成  相似文献   

6.
A Completely 3D Model for the Simulation of Mechanized Tunnel Excavation   总被引:2,自引:1,他引:1  
For long deep tunnels as currently under construction through the Alps, mechanized excavation using tunnel boring machines (TBMs) contributes significantly to savings in construction time and costs. Questions are, however, posed due to the severe ground conditions which are in cases anticipated or encountered along the main tunnel alignment. A major geological hazard is the squeezing of weak rocks, but also brittle failure can represent a significant problem. For the design of mechanized tunnelling in such conditions, the complex interaction between the rock mass, the tunnel machine, its system components, and the tunnel support need to be analysed in detail and this can be carried out by three-dimensional (3D) models including all these components. However, the state-of-the-art shows that very few fully 3D models for mechanical deep tunnel excavation in rock have been developed so far. A completely three-dimensional simulator of mechanised tunnel excavation is presented in this paper. The TBM of reference is a technologically advanced double shield TBM designed to cope with both conditions. Design analyses with reference to spalling hazard along the Brenner and squeezing along the Lyon–Turin Base Tunnel are discussed.  相似文献   

7.
The headrace tunnels at the Jinping II Hydropower Station cross the Jinping Mountain with a maximum overburden depth of 2,525 m, where 80% of the strata along the tunnels consist of marble. A number of extremely intense rockbursts occurred during the excavation of the auxiliary tunnels and the drainage tunnel. In particular, a tunnel boring machine (TBM) was destroyed by an extremely intense rockburst in a 7.2-m-diameter drainage tunnel. Two of the four subsequent 12.4-m-diameter headrace tunnels will be excavated with larger size TBMs, where a high risk of extremely intense rockbursts exists. Herein, a top pilot tunnel preconditioning method is proposed to minimize this risk, in which a drilling and blasting method is first recommended for the top pilot tunnel excavation and support, and then the TBM excavation of the main tunnel is conducted. In order to evaluate the mechanical effectiveness of this method, numerical simulation analyses using the failure approaching index, energy release rate, and excess shear stress indices are carried out. Its construction feasibility is discussed as well. Moreover, a microseismic monitoring technique is used in the experimental tunnel section for the real-time monitoring of the microseismic activities of the rock mass in TBM excavation and for assessing the effect of the top pilot tunnel excavation in reducing the risk of rockbursts. This method is applied to two tunnel sections prone to extremely intense rockbursts and leads to a reduction in the risk of rockbursts in TBM excavation.  相似文献   

8.
There are two kinds of excavation methods in underground engineering: the tunnel boring machine (TBM) and the drill-blasting method. A large number of studies have shown that the deformation and failure, the degree of disturbance, the stability and the reinforcement measures of surrounding rock using the TBM and drill-blasting method vary from each other. To accurately master these macroscopic damages, it is necessary to focus on the investigation of the micro-mechanical responses of the surrounding rock. Scanning electron microscopy tests, acoustic emission tests and tunnel acoustic detection tests were carried out to analyze the mechanical response of surrounding rock of tunnels, which were excavated in marble by, respectively, the TBM and the drill-blasting method. The tests results showed that most of the rock fractures cut by TBM is wipe along the crystal, and the failure mechanism is mainly cutting, while most of the rock fractures induced by the TBM coincide with crystal planes, its mechanism is mainly tensile. The stress–strain curves of rocks cut by the TBM method are rather flat around the peak strength, which means a strong resistance to deformation around the peak load. The response of AE for the rock cut by the TBM method appears after larger strains than the response of the rock constructed by the drill-blasting method. This suggests that the resistance to damage is higher under TBM excavation conditions. The relaxation depths of the tunnel excavated by the drill-blasting method are larger than the tunnel excavated by the TBM method. The research can provide more insight into tunnel failure mechanisms and provide a framework for reinforcement measures.  相似文献   

9.
全断面硬岩隧道掘进机(tunnel boring machine, TBM)对岩体条件极其敏感,且其前期投入较大,准确地评估岩体可掘性、预测TBM掘进性能对TBM隧道施工至关重要。基于来自中国、伊朗两国涵盖3种不同岩性的5条TBM施工引水隧洞约300组现场数据,以现场贯入度指数FPI为岩体可掘性评价指标,分析了岩石单轴抗压强度UCS、岩体完整性指数 、岩体主要结构面与洞轴线的夹角?、隧洞直径D等与岩体可掘性之间的关系;探讨了适用于岩体可掘性研究的岩体参数统一方法,进一步建立了精度较高的(相关系数为0.768)岩体可掘性经验预测方法。基于该预测方法,运用K中心聚类分析方法,将岩体可掘性分为6类,探讨了不同岩体可掘性条件下TBM平均单刀推力、刀盘转速分布规律,相应成果可为实际工程中TBM施工隧洞岩体可掘性评估、掘进参数的选择、施工进度的安排提供一定的指导。  相似文献   

10.
Pan  Yucong  Liu  Quansheng  Kong  Xiaoxuan  Liu  Jianping  Peng  Xingxin  Liu  Qi 《Acta Geotechnica》2019,14(4):1249-1268

In this study, determination of some machine parameters and performance prediction for tunnel boring machine (TBM) are conducted based on laboratory rock cutting test. Firstly, laboratory full-scale linear cutting test is carried out using 432-mm CCS (constant cross section) disc cutter in Chongqing Sandstone. Then, the input parameters for TBM cutterhead design are extracted; some TBM specifications are determined and then compared to the manufactured values. Finally, laboratory full-scale linear cutting test results are compared with the field TBM excavation performance data collected in Chongqing Yangtze River Tunnel. Results show that laboratory full-scale linear cutting test results, combined with some engineering considerations, can be used for the preliminary and rough design of TBM machine capacity. Meanwhile, combined with some modification factors, it can also well predict the field TBM excavation performance.

  相似文献   

11.
The competency of any TBM in any geological condition is determined by a rock or rock mass breakage process. A 12.24 km long tunnel between Maroshi and Ruparel College was excavated by Brihanmumbai municipal corporation (BMC) to improve water supply system of greater Mumbai, India, using open-type hard rock tunnel boring machines (TBMs). In this paper an attempt has been made to establish the relationship between rock mass characteristics i.e. RMR and UCS of the Deccan trap rocks and TBMs performance characteristics for 5.83 km long Maroshi–Vakola tunnel section of the Maroshi–Ruparel college tunnel project. To analyze the effect of variable rock mass conditions on the TBM performance, the operating parameters i.e. thrust force, torque and RPM of the machine, were recorded and intact rock strength was determined. The effect of rock mass properties on machine penetration rate (PR) and the relation with other operational parameters were analyzed. The rock strength affects the rock behaviour under compression. When the rolling cutters indent the rock, the stress exerted must be higher than the rock strength i.e.; the rock strength is directly relevant to the performance of TBM. Studies show that the penetration rate decreases with increase in uniaxial compressive strength (UCS). The comparison of measured penetration rate with empirical model developed by Graham, in which, the penetration rate is computed using UCS and average thrust per cutter, showed good agreement with coefficient of determination (R2), i.e. 0.97. The study shows that the TBM performance was maximum in rock mass rating (RMR) range from 40 to 75, while slower penetration was recorded both in very poor and very good rock masses.  相似文献   

12.
In this paper, preliminary support design of Kaletepe tunnel, located on Bilecik-Istanbul highway, Turkey, was analyzed by empirical and numerical methods. The rock mass rating (RMR) and rock mass quality (Q) systems were employed for empirical rock mass quality determination. Numerical analysis for the stress–strain distribution of the tunnel excavation and support systems was also carried out. The applied support performance was investigated at different sections of the tunnel route. It was seen that empirical and numerical approaches showed similar results. This indicates that when the empirical method is supported by numerical method, the preliminary support design will be more reliable.  相似文献   

13.
Twin tunnels can be used for many applications. Interaction between two tunnels is an important problem in tunnel engineering that should be studied specially. Numerical investigations are well adapted to field data and numerical methods can be used in design of rock pillar of twin circular tunnels. So far, no relationship has been provided to estimate the minimum stable rock pillar width. In this paper, the interaction between twin circular tunnels has been studied using 2D finite element analysis. To do this, a great number of twin tunnels were modeled in Phase2 software with different conditions of rock mass (RMR value) and depth of tunnel. Models were analyzed and minimum stable rock pillar width was determined. This process was repeated for three different ratios of K (ratio of horizontal stress to vertical stress, 0.5, 1, and 1.5). Finally, according to the linear and nonlinear regression methods, the best merit function was fitted to result of numerical analysis. Then, new approximate formula was proposed to estimate the minimum rock pillar width according to RMR value and depth of twin circular tunnels with different K values. The formulae are very accurate (coefficient of correlation equals to minimum 0.96) that can be used for estimating the minimum rock pillar width of twin circular tunnels.  相似文献   

14.
基于锦屏二级水电站深埋隧洞钻爆法及隧道掘进机(TBM)开挖过程中大量微震监测数据及不同等级的岩爆案例,对不同开挖方式下即时型岩爆的孕育及发生过程的能量释放展开研究,并运用分形几何原理研究微震能量分布的变化规律,得到以下结论:(1)即时型岩爆的孕育及发生过程中,岩爆区围岩岩体处于破坏加速集聚并不断扩展的过程;(2)钻爆法开挖过程中储存在岩体内的弹性应变能消耗于岩体破裂过程大于TBM开挖,而转化为岩体动能小于TBM开挖;(3)钻爆法开挖微震能量分形维度在即时型岩爆的孕育过程不断增加,岩爆临近前会增加到某个临界值以上;(4)TBM开挖即时型高等级岩爆能量分形维度值大于钻爆法开挖,并且其分形维度值可以反映低等级岩爆伴随发生的特征。  相似文献   

15.
何文君  张兵 《贵州地质》2006,23(1):66-68
针对隧道掘进机(Tunnel Boring Machine--TBM)施工隧洞中的围岩分类问题,指出TBM施工条件下的隧洞围岩分类应针对围岩的可钻掘性,充分考虑影响TBM掘进效率的主要工程地质因素,提出了在《工程岩体分级标准》围岩稳定性基本分级的基础上,依据岩石的单轴抗压强度、岩石的耐磨性和岩体的完整性将TBM施工条件下的隧洞围岩分为A(好)、B(一般)、C(差)3个级别的围岩分类新方法。  相似文献   

16.
Two headrace tunnels and the drainage tunnel were excavated by tunnel boring machines (TBMs) in Jinping II Hydropower Station. During TBM excavation, two types of slabbing failure were encountered in these deep buried marble tunnels. One is rock bursting and the other is non-violent slabbing. In order to study the rock burst and slabbing failure, a unique true triaxial rock burst test was carried out to simulate the rock burst process with different in situ stresses. Four rock samples in different marble layers were obtained in the site, and then four experiments are conducted under the same stressed conditions as the in situ field. The rock burst process and slabbing failure phenomena of the four experiments are in good accordance with the observations of corresponding excavation site. The failure modes of slabbing and rock burst in different rock groups can be predicted based on the experiments. The influence of the slabbing and rock burst failure on TBM excavation is analyzed in depth. Non-violent slabbing is beneficial to the rock breakage process. Rock burst with violent slabbing process greatly affects the tunnel support, cutter and cutterhead damage, gripper movement and force and so on.  相似文献   

17.
Summary. This paper exploits geological and borehole geotechnical data obtained in the exploratory phase of a tunneling project to investigate in a first place if the kriging interpolation scheme may effectively reproduce the spatial variability of rock mass quality (Rock Mass Rating, RMR) in the vicinity of tunnels. For this purpose a quick solver in Fortran has been developed that performs variography analysis of 3D spatial data, fast kriging estimations of RMR between borehole sampling locations at the centroids of the elements of the numerical model, and model validation. For the purpose of an integrated underground excavation design, a step further is made by incorporating into the 3D mechanical numerical model of the rock mass, the three-dimensional (3D) solid geological model, thus coupling the geology with the ground (geotechnical) model (i.e. each element of the numerical model is assigned a geological material). The mechanical properties of each finite difference cell (or Representative Elementary Volume) of the ground model were then prescribed according to its geological type, the spatial heterogeneity of the rock mass expressed quantitatively with the kriging model, and the upscaling calculations of the mechanical properties of the intact rocks determined in the laboratory, based on the size-effect (strength dependence on size) and Damage Theory. Furthermore, a preliminary numerical simulation of the advance of unsupported tunnels in the model of the heterogeneous rock mass was performed for illustration purposes.  相似文献   

18.
关于用岩体分类预测TBM掘进速率AR的讨论   总被引:1,自引:0,他引:1  
以Maen、Pieve、Cogolo和Varzo 4条隧道为例,本文分析说明了岩体质量分类系统不能预测TBM净掘进速率PR的原因:由于影响岩体可掘进性的因素与影响岩体质量的因素不一样,且岩体质量分类系统多采用半定性半定量的评分形式描述岩体条件,故岩体的质量分数值与TBM的净掘进速率PR很难有一一对应的关系。因此,岩体质量分类系统和基于此的预测模型不能够用来预测TBM的净掘进速率PR。根据TBM施工隧道岩体分类的目的及TBM施工的特点,提出预测TBM净掘进速率PR的岩体分类系统应与评价岩体稳定的岩体分类系统分开进行。用岩体可掘进性分类系统预测净掘进速率PR,用岩体质量分类系统预测TBM利用率U,从而计算出TBM的掘进速率AR。  相似文献   

19.
ABSTRACT

The local site experience is a valuable component for the success of rock mass classification systems as tunnel design methods. The Ituango hydroelectric project is a very important source of information in order to evaluate the usefulness of the main rock mass classification systems. The objective of this research is to improve understanding of some important features of excavated rock mass, such as discontinuities, block size, shear strength and joint alteration, by analyzing some hundreds of data obtained during excavation cycle.

The field study included a survey of exposures after drilling and blasting rounds. Rock mass classification and support measures for each type of terrain along 1400 m tunnel were performed. The rock mass classes could be better explained if shear strength, alteration or block size is calculated. The assessment of these data allows evaluating the block fall risk, improving support and liner. A local correlation between the RMR and Q system was also obtained.  相似文献   

20.
针对全断面隧道掘进机(TBM)开挖过程掌子面岩体软硬交替变化的特点,以兰州水源地建设工程为背景,采用模型试验与数值模拟方法研究了复合地层TBM开挖过程隧洞围岩的动态响应规律。通过开展相似配比试验配制了不同围岩强度比的复合地层岩体相似材料,运用光纤光栅技术全程捕捉了隧洞开挖过程复合地层应变演化规律,并分析了隧洞围岩的宏观破裂形态。模型试验结果表明:TBM推进过程中复合地层应变变化规律体现了掌子面推进的空间效应,软岩部分应变要大于硬岩部分应变,且随着开挖步数的增加两种岩层应变差值越大;隧洞内岩体完全挖除后,围岩宏观破裂形态表明因复合地层岩体物理力学性质的差异,上覆软岩变形破坏较为严重,破裂和变形较为显著,在软、硬岩层交界面出现“变形不协调”现象。选取工程沿线某洞段的地质力学参数,基于破坏接近度(FAI)指标评价了隧洞开挖过程中复合地层围岩的稳定性,数值结果表明:开挖过程软岩中FAI变化较为明显,塑性区和破坏区分布范围更广,而下部硬岩受开挖扰动影响较小,只有拱底小范围岩体进入破坏状态。模型试验和数值结果均说明交替变化的掌子面岩体在开挖过程中其围岩在变形破坏等规律方面存在明显差异,因此,TBM在复合地层施工可采取重点部位监测预警、提前采取相应措施等手段,减少或避免卡机事故的发生。该研究成果对于指导复合地层TBM施工具有一定的借鉴和指导意义。  相似文献   

设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号