首页 | 本学科首页   官方微博 | 高级检索  
相似文献
 共查询到20条相似文献,搜索用时 437 毫秒
1.
Debris flow fan affects the river profile and landscape evolution.The propagation of multiple debris flows along a river can cause inundation and breaching risk,which can be exemplified by the Min River after the Wenchuan earthquake,Sichuan province,China.In this work,large flume tests were conducted to examine the interactions between debris flows and water current with the fan geometry,momentum,runout distance,deposited width,the relative water level upstream and dominated stress.The results reveal that stony flow commonly travels at a high speed and forms a long rectangle shape fan,while the muddy flow generally travels at a low speed and forms a fan-shaped depositional area.The stony flow can block a river even when the momentum is close to the water current;the muddy flow can block a river when the momentum is lower than that of water current.In case of complete river damming,the relative water level upstream indicates that the inundation risk from the muddy flow damming river would be higher than the inundation risk of stony flow.The diversion ratio of muddy flow decreases as damming ratio.Comparison of dimensionless numbers reveals that stony flow is dominated by grain collision stress combined with turbulent mixing stress,while the muddy flow is dominated by viscous shear stress over friction stress.The fan geometry,damming ratio,diversion ratio,and the dominated stress all together indicate that stony flow strongly interacts with water current while the muddy flow does not.The results can be helpful for understanding the physical interactions between water current and various debris flows,and debris flow dynamics at the channel confluence area.  相似文献   

2.
We investigate experimentally the depositions of two contiguous debris flows flowing into a main river reach.The aim of the present experimental research is to analyze the geometry and the mutual interactions of debris flow deposits conveyed by these tributaries in the main channel.A set of 19 experiments has been conducted considering three values of the confluence angle,two slopes of the tributary,and three different triggering conditions(debris flows occurring simultaneously in the tributaries,or occurring first either in the upstream or in the downstream tributary).The flow rate along the main channel was always kept constant.During each experiment the two tributaries had the same slope and confluence angle.The analysis of the data collected during the experimental tests indicates that the volume of the debris fan is mainly controlled by the slope angle,as expected,while the shape of the debris deposit is strongly influenced by the confluence angle.Moreover,in the case of multiple debris flows,the deposit shape is sensitive to the triggering conditions.Critical index for damming formation available in literature has been considered and applied to the present case,and,on the basis of the collected data,considerations about possible extension of such indexes to the case of multiple confluences are finally proposed.  相似文献   

3.
Debris flows and landslides, extensively developing and frequently occurring along Parlung Zangbo, seriously damage the Highway from Sichuan to Tiebt(G318) at Bomi County. The disastrous debris flows of the Tianmo Watershed on Sept. 4, 2007, July 25, 2010 and Sept. 4, 2010, blocked Parlung Zangbo River and produced dammed lakes, whose outburst flow made 50 m high terrace collapse at the opposite bank due to intense scouring on the foot of the terrace. As a result, the traffic was interrupted for 16 days in 2010 because that 900 m highway base was destructed and 430 m ruined. These debris flows were initiated by the glacial melting which was induced by continuous higher temperature and the following intensive rainfall, and expanded by moraines along channels and then blocked Parlung Zangbo. At the outlet of watershed,the density, velocity and peak discharge of debris flow was 2.06 t/m3, 12.7 m/s and 3334 m3/s, respectively. When the discharge at the outlet and the deposition volume into river exceeds 2125 m3/s and 126×103 m3, respectively, debris flow will completely blocked Parlung Zangbo. Moreover,if the shear stress of river flow on the foot of terrace and the inclination angel of terrace overruns 0. 377 N/m2 and 26°, respectively, the unconsolidated terrace will be eroded by outburst flow and collapse. It was strongly recommended for mitigation that identify and evade disastrous debris flows, reduce the junction angel of channels between river and watershed, build protecting wall for highway base and keep appropriate distance between highway and the edge of unconsolidated terrace.  相似文献   

4.
Natural dams are formed when landslides are triggered by heavy rainfall during extreme weather events in the mountainous areas of Taiwan.During landslide debris movement, two processes occur simultaneously: the movement of landslide debris from a slope onto the riverbed and the erosion of the debris under the action of high-velocity river flow. When the rate of landslide deposition in a river channel is higher than the rate of landslide debris erosion by the river flow, the landslide forms a natural dam by blocking the river channel. In this study, the effects of the rates of river flow erosion and landslide deposition(termed the erosive capacity and depositional capacity, respectively) on the formation of natural dams are quantified using a physics-based approach and are tested using a scaled physical model.We define a dimensionless velocity index vde as the ratio between the depositional capacity of landslide debris(vd) and the erosive capacity of water flow(ve).The experimental test results show that a landslidedam forms when landslide debris moves at high velocity into a river channel where the river-flow velocity is low, that is, the dimensionless velocity index vde 54. Landslide debris will not have sufficient depositional capacity to block stream flow when the dimensionless velocity index vde 47. The depositional capacity of a landslide can be determined from the slope angle and the friction of the sliding surface, while the erosive capacity of a dam can be determined using river flow velocity and rainfall conditions. The methodology described in this paper was applied to seven landslide dams that formed in Taiwan on 8 August 2009 during Typhoon Morakot,the Tangjiashan landslide dam case, and the YingxiuWolong highway K24 landslide case. The dimensionless velocity index presented in this paper can be used before a rainstorm event occurs to determine if the formation of a landslide dam is possible.  相似文献   

5.
A large number of debris flows occurred in the Wenchuan earthquake zone after the 12 May 2008 earthquake.The risks posed by these debris flows were rather high.An appropriate model is required to predict the possible runout distance and impacted area.This paper describes a study on the runout characteristics of the debris flows that occurred in the Wenchuan earthquake zone over the past four years.A total of 120 debris flows are analyzed.Separate multivariate regression models are established for the runout distances of hill-slope debris flows and channelized debris flows.The control variables include type of debris flow,debris flow volume,and elevation difference.Comparison of the debris flows occurring before and after the earthquake shows that the runout distance increased after the earthquake due to sufficient material supply and increased mobility of the source materials.In addition,the runout distances of annual debris flow events in 2008,2010 and 2011 are analyzed and compared.There is a tendency that the runout distance decreases over time due to the decreasing source material volume and possible changes of debris flow type.Comparison between the debris flows in the earthquake zone and the debris flows in Swiss Alps,Canada,Austria,and Japan shows that the former have a smaller mobility.  相似文献   

6.
The upper Yangtze River region is one of the most frequent debris flow areas in China. The study area contains a cascade of six large hydropower stations located along the river with total capacity of more than 70 million kilowatts. The purpose of the study was to determine potential and dynamic differences in debris flow susceptibility and intensity with regard to seasonal monsoon events. We analyzed this region’s debris flow history by examining the effective peak acceleration of antecedent earthquakes, the impacts of antecedent droughts, the combined effects of earthquakes and droughts, with regard to topography, precipitation, and loose solid material conditions. Based on these factors, we developed a debris flow susceptibility map. Results indicate that the entire debris flow susceptibility area is 167,500 km2, of which 26,800 km2 falls within the high susceptibility area, with 60,900 km2 in medium and 79,800 km2 are in low susceptibility areas. Three of the six large hydropower stations are located within the areas with high risk of debris flows. The synthetic zonation map of debris flow susceptibility for the study area corresponds with both the investigation data and actual distribution of debris flows. The results of debris flow susceptibility provide base-line data for mitigating, assessing, controlling and monitoring of debris flows hazards.  相似文献   

7.
The mega debris flow occurred on August 13 th 2010 in Qingping town,China(hereafter called ’8.13’ Debris Flow) have done great damage to the local habitants as well as to the re-construction projects in the quake-hit areas,and the channel-fill deposit problem caused by the debris flow was the most destructive.Moreover,it is of high possibility that an even severe deposit problem would reappear and result in worse consequences.In order to maximize risk reduction of this problem,relevant departments of the government established a series of emergency river restoration schemes,for which the numerical analysis is an important procedure to evaluate and determine the optimized one.This study presents a numerical analysis by applying a twodimensional debris flow model combined with a relevant water-sediment model to simulate the deposit during the progress of the debris flow,and to calculate and analyze the river flow field under both the present condition and different restoration conditions.The results show that the debris flow model,which takes the confluence of the Wenjia Gully to the main river into account,could simulate the deposit process quite well.In the reproduced debris flow from the simulation of the ’8.13’ Debris Flow,the original river flow path has switched to a relatively lower place just along the right bank with a high speed of near 7m.s-1 after being blocked by the deposit,which is highly hazardous.To prevent this hazard,a recommended scheme is derived through inter-comparison of different restoration conditions.It shows that the recommended scheme is able to reduce the water level and as well to regulate the flow path.Based on the given conditions of the mainstream and the tributary confluence for the simulated ’8.13’ Debris Flow,when encountering a debris flow with deposit volume less than 0.5 million m3,the river channel can endure a 20-year return flood;however,when the deposit volume increases to 2 million m3,the flood capacity of the river will be greatly impacted and the scheme becomes invalid.The recommended scheme supported by the present study has been applied to the emergency river restoration after this mega-debris flow.  相似文献   

8.
Debris flows are recurrent natural hazards in many mountainous regions.This paper presents a numerical study on the propagation of debris flows in natural erodible open channels,in which the bed erosion and sedimentation processes are important.Based on the Bingham fluid theory,a mathematical model of the two-dimensional non-constant debris flow is developed.The governing equations include the continuity and momentum conservation equations of debris flow,the sediment convection-diffusion equation,the bed erosion-deposition equation and the bed-sediment size gradation adjustment equation.The yield stress and shear stress components are included to describe the dynamic rheological properties.The upwind control-volume Finite Volume Method (FVM) is applied to discretize the convection terms.The improved SIMPLE algorithm with velocity-free-surface coupled correction is developed to solve the equations on non-orthogonal,quadrilateral grids.The model is applied to simulate a debris flow event in Jiangjia Gully,Yunnan Province and to predict the flow pattern and bed erosion-deposition processes.The results show the effectiveness of the proposed numercial model in debris flow simulation and potential hazard analysis.  相似文献   

9.
A large amount of loose debris materials were deposited on the slope of mountainous areas after the 2008 Ms 8.0 Wenchuan earthquake. During and after the earthquake, these loose debris deposits collapsed and slide into valleys or rivers, changing river sediment supply condition and channel morphology. To investigate the mechanisms of granular flow and deposition, the dynamics of slope failure and sediment transportation in typical mountainous rivers of different intersection angles were analyzed with a coupling model of Computational Fluid Dynamics and Discrete Element Method(CFD-DEM). The numerical results show that the change of intersection angle between the granular flow flume and the river channel can affect the deposit geometry and the fluid flow field significantly. As the intersection angle increases, the granular velocity perpendicular to the river channel increases, while the granular velocity parallel to the river channel decreases gradually. Compared to the test of dry granular flow, the CFD-DEM coupling tests show much higher granular velocity and larger volume of sediments entrained in the river. Due to the river flow, particles located at the edge of the deposition will move downstream gradually and the main section of sediments deposition moves from the center to the edge of the river channel. As a result, sediment supply in the downstream river will distribute unevenly. Under the erosion of fluid flow, the proportion of fine particles increases, while the proportion of coarse particles decreases gradually in the sediment deposition. The build-up of accumulated sediment mass will cause a significant increase in water level in the river channel, thus creating serious flooding hazard in mountainous rivers.  相似文献   

10.
四川省小流域泥石流危险性评价   总被引:1,自引:0,他引:1  
泥石流危险性评价是泥石流防灾减灾的重要内容。本文以四川省为研究区,以DEM为数据源,通过提取水流方向,计算汇流累积量,实现四川省小流域划分。基于收集的已查明泥石流流域资料,分析了泥石流孕灾环境与成灾特点,选择流域高差、流域面积为指标,建立基于能量条件的潜势泥石流流域判识模型,对划分的小流域进行判识,识别出7798个小流域具备泥石流发生所需能量条件,面积为31.1×104 km2,占四川省总面积的64.18 %。进而建立了泥石流危险性评价指标体系和可拓物元模型,开展了小流域泥石流危险性评价,划分了危险度等级,得到中度、高度、极高危险区的小流域个数分别为1946、1725和1002个,面积分别为9.1×104、7.7×104和3.4×104 km2,中度以上危险区面积共20.2×104 km2,占四川省总面积的41.67%。最后对评价结果可靠性和各等级泥石流危险区在各地市级行政区、各大流域的分布进行了分析。其结果对促进泥石流判识与危险性评价理论,区域泥石流防灾减灾与山区可持续发展等具有重要的理论和现实意义。  相似文献   

11.
The occurrence of debris flow is affected by many factors. Risk zoning of debris flow plays a vital role in the early-warning and prediction of abrupt geological hazards, and exploration of new method is needed in the early-warning and prediction of geological hazards. The extension theory is a new method to solve contradiction matters. Based on extension theory, AHP and GIS, the risk zoning model of debris flow was established in this paper. The result of this research provides a new way in the risk zoning, early-warning and prediction of debris flow  相似文献   

12.
《山地科学学报》2020,17(1):156-172
Loose deposits, rainfall and topography are three key factors that triggering debris flows.However, few studies have investigated the effects of loose deposits on the whole debris flow process.On June 28, 2012, a catastrophic debris flow occurred in the Aizi Valley, resulting in 40 deaths.The Aizi Valley is located in the Lower Jinsha River,southwestern Sichuan Province, China. The Aizi Valley debris flow has been selected as a case for addressing loose deposits effects on the whole debris flow process through remote sensing, field investigation and field experiments. Remote sensing interpretation and laboratory experiments were used to obtain the distribution and characteristics of the loose deposits, respectively. A field experiment was conducted to explore the mechanics of slope debris flows, and another field investigation was conducted to obtain the processes of debris flow formation, movement and amplification. The results showed that loose deposits preparation, slope debris flow initiation,gully debris flow confluence and valley debris flow amplification were dominated by the loose deposits.Antecedent droughts and earthquake activities may have increased the potential for loose soil sources in the Aizi Valley, which laid the foundation for debris flow formation. Slope debris flow initiated under rainfall, and the increase in the water content as well as the pore water pressure of the loose deposits were the key factors affecting slope failure. The nine gully debris flows converged in the valley, and the peak discharge was amplified 3.3 times due to a blockage and outburst caused by a large boulder. The results may help in predicting and assessing regional debris flows in dry-hot and seismic-prone areas based on loose deposits, especially considering large boulders.  相似文献   

13.
On 13 August 2010, a catastrophic debris flow with a volume of 1.17 million m3 occurred in Xiaojiagou Ravine near Yingxiu town of Wenchuan county in Sichuan Province, China. The main source material was the landslide deposits retained in the ravine during the 2008 Wenchuan earthquake. This paper describes a two-dimensional hybrid numerical method that simulates the entire process of the debris flow from initiation to transportation and finally to deposition. The study area is discretized into a grid of square zones. A two dimensional finite difference method is then applied to simulate the rainfall-runoff and debris flow runout processes. The analysis is divided into three steps; namely, rainfall-runoff simulation, mixing water and solid materials, and debris flow runout simulation. The rainfall-runoff simulation is firstly conducted to obtain the cumulative runoff near the location of main source material and at the outlet of the first branch. The water and solid materials are then mixed to create an inflow hydrograph for the debris flow runout simulation. The occurrence time and volume of the debris flow can be estimated in this step. Finally the runout process of the debris flow is simulated. When the yield stress is high, it controls the deposition zone. When the yield stress is medium or low, both yield stress and viscosity influence the deposition zone. The flow velocity is largely influenced by the viscosity. The estimated yield stress by the equation, τ y = ρghsin θ, and the estimated viscosity by the equation established by Bisantino et al. (2010) provide good estimates of the area of the debris flow fan and the distribution of deposition depth.  相似文献   

14.
Alternation of high and low resistance sedimentary beds,active tectonics,large rivers,and slope erosion in valleys consequently resulted in landslide in dammed lakes within the Zagros range.This study presents the results in the analysis of geological and topographic data,satellite imageries,morphotectonics and hydrodynamics of drainage networks about the landslide dammed lakes.There are four landslides in central Zagros(Zagros FoldThrust Belt,ZFTB)which have formed five dammed lakes named,Seymareh,Jaidar,Shur,Shimbar,and Godar.According to the results,damming landslides occurred in the active-tectonic regions on the slopes of anticlines and in valleys with undercutting effects of rivers on their slopes consisting of alternations of loose and resistant beds.The studied landslide dams in narrow valleys are formed as a result of blocking river by sliding debris slopes and rock slides.This study also indicates the formation of Jaidar and Godar in one stage and the presence of Lake Terrace sequence in Seymareh,Shur and Shimbar lakes.The observed sequences of terrace formation in these lakes are caused by four Seymareh Landslides followed by the three-stage excavation of Shur andShimbar lakes.  相似文献   

15.
In order to calculate the suspended sediment discharge of the flood debris flows into the main river,a small scale flume test was designed to simulate the process of confluence of Jiangjia Ravine and Xiangjiang River in Yunnan province,China.By test observation and data analysis,suspended sediment discharge of Debris flow after its entry into the main river was found to have a close relation with the bulk density,the confluence angle of the Debris flow and the main river,the ratio between per unit width discharge of Debris flow and main river.Based on the measured and simulated results,and statistical analysis,an empirical formula was proposed for the suspended SDR(Sediment Delivery Ratio) of the main river after the confluence of Debris flow.Compared with the observed results of Debris flow in 2009,the error between the data calculated by the empirical formula and the monitored data is only about 10%.  相似文献   

16.
The Wenchuan earthquake caused numerous landslides and collapses that provide abundant unconsolidated material for future mobilization as debris flows.Debris flows will be very active and cause considerable damage for some time in the affected area.Because of environmental changes related to the earthquake,many potentially dangerous debris flow gullies have yet to be identified.This paper selects the upper Min River from Yinxiu to Wenchuan as the study area,interprets the unconsolidated deposits,and discusses their relationship to distance from the fault.Then,applying that information and the values of other factors relating to debris flow occurrence,the locations of potential debris flows are analyzed by multi-factor comprehensive identification and rapid identification.The multi-factor comprehensive identification employs fuzzy matter-element extension theory.The volume of unconsolidated material in the study area is about 3.28 × 108 m3.According to the analysis by multi-factor comprehensive identification,47 gullies have a high probability for potential debris flow,8 gullies have a moderate probability,and 1 gully has a low probability.  相似文献   

17.
The occurrence of debris flow is affected by many factors. Risk zoning of debris flow plays a vital role in the early-warning and prediction of abrupt geological hazards, and exploration of new method is needed in the early-warning and prediction of geological hazards. The extension theory is a new method to solve contradiction matters. Based on extension theory, AHP and GIS, the risk zoning model of debris flow was established in this paper. The result of this research provides a new way in the risk zoning, early-warning and prediction of debris flow  相似文献   

18.
Techniques of gully-specific debris flow hazard assessment developed in four periods since the end of the1980s have been discussed in the present paper. The improvement for the empirical assessment method is the sectional-ized function transformation for the factor value, rather than the classified logical transformation. The theoretical equationof the gully-specific debris flow hazard is expressed as the definite integral of an exponential function and its numericalsolution is expressed by the Poisson Limit Equation. Current methods for assessment of debris flow hazard in China arestill valid and practical. The further work should be put on the study of the reliability (or uncertainty) of the techniques.For the future, we should give a high priority to the relationship between debris flow magnitude and its frequency of occur-rence, make more developments of prediction model on debris flow magnitude, so as to finally reach the goal of assessingthe hazard of debris flow by theoretical model, and realize both actuality assessment and prediction appraisal of debris flow.  相似文献   

19.
针对传统方法难以定量描述大尺度泥石流形成机理的问题,提出一种联合SAR卫星影像相位信息和后向散射信息全面识别泥石流发育机制的方法,并使用该方法探究云南省德钦县一中河泥石流物源汇集及失稳模式.通过后向散射系数反演研究区土壤含水量的时空变化趋势,利用升降轨Sentinel-1 A数据获取坡表二维形变.结果表明,研究区土壤含...  相似文献   

20.
The magnitude-frequency(MF) relationship of debris flows is the basis for engineering designs and risk quantification. However, because of the lack of debris flow monitoring data, research progress in this area has been relatively slow. The MF relationship of debris flows in Jiangjia Gully, Yunnan Province was evaluated based on a regression analysis of 178 debris flow events that occurred from 1987-2004. The magnitude-cumulative frequency(MCF) relationship of the debris flows in the Jiangjia Gully is consistent with the linear logarithmic transformation function. Moreover, observed data for debris flows in Hunshui Gully of Yunnan Province and Huoshao Gully, Liuwan Gully, and Niwan Gully of Gansu Province were used to verify the function. The results showed that the MCF relationship of highfrequency debris flows is consistent with the power law equation, although the regression coefficients in the equation are considerably different. Further analysis showed a strong correlation between the differences in the constants and the drainage area and daily maximum precipitation.  相似文献   

设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号