首页 | 本学科首页   官方微博 | 高级检索  
相似文献
 共查询到20条相似文献,搜索用时 31 毫秒
1.
ABSTRACT

Sedimentation in navigable waterways and harbours is of concern for many water and port managers. One potential source of variability in sedimentation is the annual sediment load of the river that empties in the harbour. The main objective of this study was to use some of the regularly monitored hydro-meteorological variables to compare estimates of hourly suspended sediment concentration in the Saint John River using a sediment rating curve and a model tree (M5?) with different combinations of predictors. Estimated suspended sediment concentrations were multiplied by measured flows to estimate suspended sediment loads. Best results were obtained using M5? with four predictors, returning an R2 of 0.72 on calibration data and an R2 of 0.46 on validation data. Total load was underestimated by 1.41% for the calibration period and overestimated by 2.38% for the validation period. Overall, the model tree approach is suggested for its relative ease of implementation and constant performance.
EDITOR M.C. Acreman; ASSOCIATE EDITOR B. Touaibia  相似文献   

2.
3.
Since the 1970s, there has been both continuing and growing interest in developing accurate estimates of the annual fluvial transport (fluxes and loads) of suspended sediment and sediment‐associated chemical constituents. This study provides an evaluation of the effects of manual sample numbers (from 4 to 12 year?1) and sample scheduling (random‐based, calendar‐based and hydrology‐based) on the precision, bias and accuracy of annual suspended sediment flux estimates. The evaluation is based on data from selected US Geological Survey daily suspended sediment stations in the USA and covers basins ranging in area from just over 900 km2 to nearly 2 million km2 and annual suspended sediment fluxes ranging from about 4 Kt year?1 to about 200 Mt year?1. The results appear to indicate that there is a scale effect for random‐based and calendar‐based sampling schemes, with larger sample numbers required as basin size decreases. All the sampling schemes evaluated display some level of positive (overestimates) or negative (underestimates) bias. The study further indicates that hydrology‐based sampling schemes are likely to generate the most accurate annual suspended sediment flux estimates with the fewest number of samples, regardless of basin size. This type of scheme seems most appropriate when the determination of suspended sediment concentrations, sediment‐associated chemical concentrations, annual suspended sediment and annual suspended sediment‐associated chemical fluxes only represent a few of the parameters of interest in multidisciplinary, multiparameter monitoring programmes. The results are just as applicable to the calibration of autosamplers/suspended sediment surrogates currently used to measure/estimate suspended sediment concentrations and ultimately, annual suspended sediment fluxes, because manual samples are required to adjust the sample data/measurements generated by these techniques so that they provide depth‐integrated and cross‐sectionally representative data. Published 2014. This article is a U.S. Government work and is in the public domain in the USA.  相似文献   

4.
Abstract

The Pennsylvania Department of Transportation and the US Geological Survey are cooperating in several field studies to evaluate sediment control measures used during highway construction. Among the parameters being monitored are suspended sediment concentration and turbidity. Sediment loads are calculated from suspended sediment and water discharge data, but some sediment loads must be determined indirectly because it is virtually impossible to obtain sufficient suspended sediment samples to define all runoff conditions adequately. Sediment discharge-water discharge correlation curves have proved unreliable for streams affected by highway construction, so an alternative method using the turbidity record was developed during these studies.

The field data reveal a good correlation between daily mean discharge-weighted turbidity and daily mean discharge-weighted suspended sediment concentration. Turbidity is monitored and recorded continuously, and the daily mean discharge-weighted turbidity is calculated from the turbidity and water discharge data. During periods when there are insufficient suspended sediment data, the daily mean discharge-weighted suspended sediment concentration is determined from the turbidity-sediment correlation and used with the daily mean water discharge to calculate a daily sediment load.

This method of determining sediment loads from the turbidity record suggests a possiblity for computation of sediment loads by computer. Instrumentation now in use for recording water quality parameters on digital punch tape could be used to record the output from a turbidimeter. Then, for streams having a good correlation between suspended sediment concentration and turbidity, simultaneous water discharge and turbidity data could be used to determine sediment loads by computer.  相似文献   

5.
Abstract

Agricultural watersheds in the Czech Republic are one of the primary sources of non-point-source phosphorus (P) loads in receiving waters. Since such non-point sources are generally located in headwater catchments, streamflow and P concentration data are sparse. We show how very short daily streamflow and P concentration records can be combined with nearby longer existing daily streamflow records to result in reliable estimates of daily and annual P concentrations and loads. Maintenance of variance streamflow record extension methods (MOVE) can be employed to extend short streamflow records. Constituent load regressions are used to predict daily P constituent loads from streamflow and other time varying characteristics. Annual P loads are then estimated for individual watersheds. Resulting annual P load estimates ranged from 0.21 to 95.4 kg year-1 with a mean value of 11.77 kg year-1. Similarly annual P yield estimates ranged from 0.01 to 0.3 kg ha-1 year-1 with an average yield of 0.07 kg ha-1 year-1. We document how short records of daily streamflow and P concentrations can be combined with a national network of daily streamflow records in the Czech Republic to arrive at meaningful and reliable estimates of annual P loads for small agricultural watersheds.

Citation Beránková, T., Vogel, R. M., Fiala, D. & Rosendorf, P. (2010) Estimation of phosphorus loads with sparse data for agricultural watersheds in the Czech Republic. Hydrol. Sci. J. 55(8), 1417–1426.  相似文献   

6.
Hugh G. Smith 《水文研究》2008,22(16):3135-3148
Historically upland headwater catchments in south‐eastern Australia have undergone extensive gully erosion that has removed large amounts of sediment to lowlands. Recent research suggests these upland areas may continue to dominate fine sediment loads in lowland rivers. Improved understanding of sediment transfer through upland headwater catchments may have implications for interpreting downstream sediment supply. In this study a nested catchment design was utilized to examine suspended sediment yields and delivery from a small tributary sub‐catchment (1·64 km2) to the study catchment outlet (53·5 km2). Monitoring of suspended sediment concentration and discharge was undertaken for a period of nearly two years and used to estimate suspended sediment loads. Estimated total suspended sediment exports over the period of monitoring were 24·16 t from the sub‐catchment and 550·3 t from the catchment, which are generally less than previous reported small catchment yields in south‐eastern Australia. The extent of sediment delivery was examined using between‐site ratios of specific sediment yield per unit area and incised channel length. Sediment delivery was high under average rainfall conditions, but seasonally dependent. Both suspended sediment yields and the extent of delivery peaked over spring months, supplemented by remobilization of sediment stored during summer months in the main catchment channel. The findings of this study suggest much of the suspended sediment exported from small incised upland sub‐catchments (1–2 km2) may be delivered to downstream reaches under average rainfall conditions, which, in conjunction with the findings of previous research supports the potential importance of contributions from these areas to suspended sediment loads in lowland rivers during high flow periods. Copyright © 2007 John Wiley & Sons, Ltd.  相似文献   

7.
ABSTRACT

The suspended sediment rating curves for six stations on four rivers in western and northern Greece are investigated. For each station the suspended sediment load is a power function of the water discharge, which may be distinguished according to wet and dry seasons; the latter yields higher sediment loads for a given discharge than the former. This is due to the higher erosivity of dry season rainfall compared to wet season rainfall producing the same runoff. All rating curve exponents b lie in the range 2.5–3.5 for the wet and 2.0–3.0 for the dry season and are related to the constants a of the curves by empirical equations. The variation in a and b is explained in terms of the annual precipitation and area of the basin, the hypsometric fall, the main channel length, and the average bedslope of the river from the basin divide to the station, through empirical relationships, which also permit the prediction of rating curves for ungauged basins.  相似文献   

8.
Abstract

Rating curves are widely used for directly assessing changes in the suspended sediment delivery process and indirectly for estimating total yields. Four sampling methods were simulated over a 31-day record of suspended sediment from the North Fork of the Mad River near Korbel, California. The position and size of the four groups of plotted slope/intercept pairs indicated differences in bias and variance among the methods. Estimates of total yield for the 31-day period and for storms of three sizes were also biased according to sampling method. A standard bias-correcting technique improved yield estimates, but did not remove sampling bias uniformly. Methods of data collection have a large and systematic effect on the estimation of rating-curve parameters and on estimates of suspended sediment yield. Differences attributed to land management may, in fact, result from changes in sampling methods.  相似文献   

9.
Abstract

Water discharge and suspended and dissolved sediment data from three rivers (Napo, Pastaza and Santiago) in the Ecuadorian Amazon basin and a river in the Pacific basin (Esmeraldas) over a 9-year period, are presented. This data set allows us to present: (a) the chemical weathering rates; (b) the erosion rates, calculated from the suspended sediment from the Andean basin; (c) the spatio-temporal variability of the two regions; and (d) the relationship between this variability and the precipitation, topography, lithology and seismic activity of the area. The dissolved solids load from the Esmeraldas basin was 2 × 106 t year-1, whereas for the Napo, Pastaza and Santiago basins, it was 4, 2 and 3 × 106 t year-1, respectively. For stations in the Andean piedmont of Ecuador, the relationship between surface sediment and the total sediment concentration was found to be close to one. This is due to minimal stratification of the suspended sediment in the vertical profile, which is attributed to turbulence and high vertical water speeds. However, during the dry season, when the water speed decreases, sediment stratification appears, but this effect can be neglected in the sediment flux calculations due to low concentration rates. The suspended sediment load in the Pacific basin was 6 × 106 t year-1, and the total for the three Amazon basins was 47 × 106 t year-1. The difference between these contributions of the suspended sediment load is likely due to the tectonic uplift and the seismic and volcanic dynamics that occur on the Amazon side.

Editor Z.W. Kundzewicz

Citation Armijos, E., Laraque, A., Barba, S., Bourrel, L., Ceron, C., Lagane, C., Magat, P., Moquet, J.-S., Pombosa, R., Sondag, F., Vauchel, P., Vera, A., and Guyot, J.L., 2013. Yields of suspended sediment and dissolved solids from the Andean basins of Ecuador. Hydrological Sciences Journal, 58 (7), 1478–1494.  相似文献   

10.
Sediment fingerprinting appears to offer a valuable alternative to direct monitoring for elucidating the provenance of suspended sediment and the relative importance of spatial zones or subcatchments comprising larger (>500 km2) drainage basins. Against this background, a quantitative composite fingerprinting technique, incorporating both statistically verified multicomponent signatures and a multivariate sediment-mixing model, has been employed to determine the spatial origin of contemporary suspended sediment transported from the upper and middle reaches of the River Exe (601 km2) and River Severn (4325 km2) basins, UK. Spatial origin is addressed in terms of the relative contribution from three distinct geological subareas constituting each study basin. The consistency of the composite fingerprinting approach is examined using the estimates for mean and seasonal variations in source area contributions and also a comparison between the results obtained for individual flood events and alternative lines of evidence provided by flood travel times and the spatial distribution of precipitation. It is argued that fingerprinting estimates for sediment provenance are consistent with existing information on suspended sediment yields from different subcatchments within the study basins, although in the Severn, the role of storage and remobilization in producing signature ‘averaging’ may complicate comparison of the fingerprinting data with typical floodwater routing times. Validation represents the greatest problem for the cost–benefit of fingerprinting and scope still exists for further refinement of the procedures involved. © 1998 John Wiley & Sons, Ltd.  相似文献   

11.
Abstract

The study of sediment load is important for its implications to the environment and water resources engineering. Four models were considered in the study of suspended sediment concentration prediction: artificial neural networks (ANNs), neuro-fuzzy model (NF), conjunction of wavelet analysis and neuro-fuzzy (WNF) model, and the conventional sediment rating curve (SRC) method. Using data from a US Geological Survey gauging station, the suspended sediment concentration predicted by the WNF model was in satisfactory agreement with the measured data. Also the proposed WNF model generated reasonable predictions for the extreme values. The cumulative suspended sediment load estimated by this model was much higher than that predicted by the other models, and is close to the observed data. However, in the current modelling, the ANN, NF and SRC models underestimated sediment load. The WNF model was successful in reproducing the hysteresis phenomenon, but the SRC method was not able to model this behaviour. In general, the results showed that the NF model performed better than the ANN and SRC models.

Citation Mirbagheri, S. A., Nourani, V., Rajaee, T. & Alikhani, A. (2010) Neuro-fuzzy models employing wavelet analysis for suspended sediment concentration prediction in rivers. Hydrol. Sci. J. 55(7), 1175–1189.  相似文献   

12.
A hydrology–sediment modelling framework based on the model Topkapi-ETH combined with basin geomorphic mapping is used to investigate the role of localized sediment sources in a mountain river basin (Kleine Emme, Switzerland). The periodic sediment mobilization from incised areas and landslides by hillslope runoff and river discharge is simulated in addition to overland flow erosion to quantify their contributions to suspended sediment fluxes. The framework simulates the suspended sediment load provenance at the outlet and its temporal dynamics, by routing fine sediment along topographically driven pathways from the distinct sediment sources to the outlet. We show that accounting for localized sediment sources substantially improves the modelling of observed sediment concentrations and loads at the outlet compared to overland flow erosion alone. We demonstrate that the modelled river basin can shift between channel-process and hillslope-process dominant behaviour depending on the model parameter describing gully competence on landslide surfaces. The simulations in which channel processes dominate were found to be more consistent with observations, and with two independent validations in the Kleine Emme, by topographic analysis of surface roughness and by sediment tracing with 10 Be concentrations. This research shows that spatially explicit modelling can be used to infer the dominant sediment production process in a river basin, to inform and optimize sediment sampling strategies for denudation rate estimates, and in general to support sediment provenance studies. © 2020 John Wiley & Sons, Ltd.  相似文献   

13.
Abstract

Using daily suspended sediment and water discharge data, we calculated the current mean annual runoff and Specific Suspended Sediment Yield (SSY) for 66 mountainous and piedmont catchments in Chile. These catchments are located from the extreme north of Chile to Southern Patagonia and cover an exceptionally wide range of climates, slopes, and vegetation. The SSY ranges mainly between 0 and 700 t km-2 year-1 with some exceptions as high as 1780 t km-2 year-1. The SSY increases between the extreme north and 33°S and then decreases toward the south. Sediment and water discharge north of 33°S occur mainly during summer. Farther south the contribution of winter precipitation increases and predominates. When the SSY database is correlated with topographic, climatic and vegetation indices, it is found to correlate significantly with runoff and mean slope only. In order to concentrate on erosion processes in the mountain range, 32 mountainous catchments were selected along a strong north–south SSY gradient between 27°S and 40°S. From north to south, SSY increases strongly with runoff and then decreases, even while runoff keeps increasing. In catchments where SSY is low, although runoff is high, the mean slope is less than 40% and the vegetation cover is greater than 8%. For the other catchments, runoff variations explain 67% of the variance in sediment yields. Thus, SSY seems to be controlled by vegetation cover and slope thresholds. In addition, SSY also correlates with glacier cover. However, a correlation between SSY and seismicity, although possible, is ambiguous.

Citation Pepin, E., Carretier, S., Guyot, J. L. & Escobar, F. (2010) Specific suspended sediment yields of the Andean rivers of Chile and their relationship to climate, slope and vegetation. Hydrol. Sci. J. 55(7), 1190–1205.  相似文献   

14.
The aim of this study is to analyze suspended sediment transport in a Mediterranean agricultural catchment under traditional soil and water conservation practices. Field measurements were conducted in Can Revull, a small ephemeral catchment (1.03 km2) on the island of Mallorca. This study uses continuous turbidity records to analyse suspended sediment transport regimes, construct and interpret multiple regression models of total suspended sediment concentration (SSC) and of SSC related to stormflow discharge, and assess the sediment loads and yields of three hydrological years (2004–2005 to 2006–2007). An annual average SSC of 17.3 mg l?1, with a maximum of 2270 mg l?1, was recorded in the middle of the winter period when rainfall intensities are high and headwater slopes are ploughed and thus bare. Strong seasonal contrasts of baseflow dynamics associated with different degrees of dilution provide a large scatter in SSC and in the derived rating curves, reflecting that other factors control the supply of suspended sediment. Multiple regression models identify rainfall intensity as the most significant variable in sediment supply. However, under baseflow conditions, physical and biological processes generate sediment in the channel that is subsequently removed during high flow. In contrast, when baseflow is not present, rainfall intensity is the only process that supplies sediment to the channel, mostly from hillslopes. Considering the study period as average in terms of total annual rainfall and intensities, suspended sediment yields were an order of magnitude lower than those obtained in other Mediterranean catchments, a factor that can be related to the historical use of soil conservation practices. Copyright © 2009 John Wiley & Sons, Ltd.  相似文献   

15.
Abstract

The abilities of neuro-fuzzy (NF) and neural network (NN) approaches to model the streamflow–suspended sediment relationship are investigated. The NF and NN models are established for estimating current suspended sediment values using the streamflow and antecedent sediment data. The sediment rating curve and multi-linear regression are also applied to the same data. Statistic measures were used to evaluate the performance of the models. The daily streamflow and suspended sediment data for two stations—Quebrada Blanca station and Rio Valenciano station—operated by the US Geological Survey were used as case studies. Based on comparison of the results, it is found that the NF model gives better estimates than the other techniques.  相似文献   

16.
Current metre deployments, suspended sediment measurements and surface sediment samples were collected from three locations within distributary channels of the tidally dominated Fly River delta in southern Papua New Guinea. Net bedload transport vectors and the occurrence of elongate tidal bars indicate that mutually evasive ebb- and flood-dominant transport zones occur in each of the distributary channels. Suspended sediment experiments at two locations show a phase relationship between tidal velocity and sediment concentration such that the net suspended sediment flux is directed seaward. Processes that control the export of fluid muds with concentrations up to 10 g l−1 from the distributary channels across the delta front and onto the pro-delta are assessed in relation to the available data. Peak spring tidal current speeds (measured at 100 cm above the bed) drop off from around 100 cm s−1 within the distributary channels to <50 cm s−1 on the delta front. Gravity-driven, 2-m thick, fluid mud layers generated in the distributary channels are estimated to require at least 35 h to traverse the 20-km-wide, low-gradient (2×10−3 degrees) delta front. The velocities of such currents are well below those required for autosuspension. A 1-month time series of suspended sediment concentration and current velocity from the delta front indicates that tidal currents alone are unable to cause significant cross-delta mud transport. Wave-induced resuspension together with tides, storm surge and barotropic return-flow may play a role in maintaining the transport of fine sediment across the delta front, but insufficient data are available at present to make any reliable estimates.  相似文献   

17.
In situ turbidity meters are being increasingly used to generate continuous records of suspended sediment concentration in rivers. However, the usefulness of the information obtained depends heavily on the existence of a close relationship between fluctuations in suspended sediment concentration and turbidity and the calibration procedure that relates suspended sediment concentration to the turbidity meter's signal. This study assesses the relationship between suspended sediment concentration and turbidity for a small (1·19 km2) rural catchment in southern Brazil and evaluates two calibration methods by comparing the estimates of suspended sediment concentration obtained from the calibrated turbidity readings with direct measurements obtained using a USDH 48 suspended sediment sampler. With the first calibration method, the calibration relationship is derived by relating the turbidity readings to simultaneous measurements of concentration obtained from suspended sediment samples collected from the vicinity of the turbidity probe during flood events. With the second method, the calibration is based on the readings obtained from the turbidity meter when the probe immersed in samples of known concentration prepared using soils collected from the catchment. Overall, there was a close link between fluctuations in suspended sediment concentration and turbidity in the stream at the outlet of the catchment, and the estimates of sediment concentration obtained using the first calibration method corresponded closely with the conventionally measured sediment concentrations. However, use of the second calibration method introduced appreciable errors. When the estimated sediment concentrations were compared with the measured values, the mean errors were ± 122 mg l?1 and + 601 mg l?1 for the first and second calibration procedures respectively. Copyright © 2007 John Wiley & Sons, Ltd.  相似文献   

18.
Arthur J. Horowitz 《水文研究》2003,17(17):3387-3409
In the absence of actual suspended sediment concentration (SSC) measurements, hydrologists have used sediment rating (sediment transport) curves to estimate (predict) SSCs for subsequent flux calculations. Various evaluations of the sediment rating‐curve method were made using data from long‐term, daily sediment‐measuring sites within large (>1 000 000 km2), medium (<1 000 000 to >1000 km2), and small (<1000 km2) river basins in the USA and Europe relative to the estimation of suspended sediment fluxes. The evaluations address such issues as the accuracy of flux estimations for various levels of temporal resolution as well as the impact of sampling frequency on the magnitude of flux estimation errors. The sediment rating‐curve method tends to underpredict high, and overpredict low SSCs. As such, the range of errors associated with concomitant flux estimates for relatively short time‐frames (e.g. daily, weekly) are likely to be substantially larger than those associated with longer time‐frames (e.g. quarterly, annually) because the over‐ and underpredictions do not have sufficient time to balance each other. Hence, when error limits must be kept under ±20%, temporal resolution probably should be limited to quarterly or greater. The evaluations indicate that over periods of 20 or more years, errors of <1% can be achieved using a single sediment rating curve based on data spanning the entire period. However, somewhat better estimates for the entire period, and markedly better annual estimates within the period, can be obtained if individual annual sediment rating curves are used instead. Relatively accurate (errors <±20%) annual suspended sediment fluxes can be obtained from hydrologically based monthly measurements/samples. For 5‐year periods or longer, similar results can be obtained from measurements/samples collected once every 2 months. In either case, hydrologically based sampling, as opposed to calendar‐based sampling is likely to limit the magnitude of flux estimation errors. Published in 2003 John Wiley & Sons, Ltd.  相似文献   

19.
One year of instantaneous suspended sediment concentration, C, and instantaneous discharge, Q, data collected at Ngarradj downstream of the Jabiluka mine site indicate that the use of a simple CQ rating curve is not a reliable method for estimating suspended sediment loads from the Ngarradj catchment. The CQ data are not only complicated by hysteresis effects within the rising and falling stages of individual events, but also by variable depletion of available suspended sediment through multipeaked runoff events. Parameter values were fitted to an event‐based suspended sediment load–Q relationship as an alternative to the CQ relationship. Total suspended sediment load and Q data for 10 observed events in the Ngarradj stream catchment were used to fit parameter values to a suspended sediment load–Q relationship, using (a) log–log regression and (b) iterative parameter fitting techniques. A more reliable and statistically significant prediction of suspended sediment load from the Ngarradj catchment is obtained using an event‐based suspended sediment load–Q relationship. Fitting parameters to the event‐based suspended sediment load–Q relationship using iterative techniques better predicts long‐term suspended sediment loads compared with log–log regression techniques. Copyright © 2004 John Wiley & Sons, Ltd.  相似文献   

20.
《水文科学杂志》2013,58(3):656-666
Abstract

The use of support vector machines—a new regression procedure in water resources—was investigated for predicting suspended sediment concentration/load in rivers. The method was applied to the observed streamflow and suspended sediment data of two rivers in the USA, which have already been used in earlier studies using soft computing techniques. The estimated suspended sediment values were found to be in good agreement with the observed ones. Negative sediment estimates, which were encountered in the soft computing calculations, are not produced by this method. The results indicate that this approach may give better performance than those described in the literature using different methodologies.  相似文献   

设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号