首页 | 本学科首页   官方微博 | 高级检索  
相似文献
 共查询到20条相似文献,搜索用时 31 毫秒
1.
Abstract

Walling & Webb (1981) made empirical comparisons amongst a number of methods for the estimation of suspended sediment loads. This paper presents expressions for the means and variances of three of the estimates compared by Walling & Webb, on the assumption that suspended sediment concentration, c, and mean daily discharge, q, are bivariate lognormally distributed. With this assumption, not inconsistent with the literature and with data, one of the three estimates is unbiased and the other two are biassed, the bias being an exponential function of the correlation and standard deviations in the lognormal distribution. This confirms the empirical finding of Walling & Webb and supports theoretical results of Ferguson (1987) which were established without distributional assumptions. Expressions for the variances of the three estimators of suspended sediment loads also confirm the empirical result of Walling & Webb, the unbiassed estimate having variance of order 1/n whilst the biassed estimates have variances of order 1/n2.  相似文献   

2.
《水文科学杂志》2013,58(6):899-915
Abstract

The results are described of 16 years operation of a measuring station for the automatic recording of water discharge, bed load and suspended sediment transport in the Rio Cordon catchment, a small alpine basin (5 km2) located in northeastern Italy. Hillslope erosion processes were investigated by surveying individual sediment sources repeatedly. Annual and seasonal variations of suspended sediment load during the period 1986–2001 are analysed along with their contribution to the total sediment yield. The results show that suspended load accounted for 76% of total load and that most of the suspended sediment transport occurred during two flood events: an extreme summer flash flood in September 1994 (27% of the 16-years total suspended load) and a snowmelt-induced event in May 2001 accompanied by a mud flow which fed the stream with sediments. The role of active sediment source areas is discussed in relation to the changes in flood peak—suspended load trends which became apparent after both the 1994 and the 2001 events.  相似文献   

3.
Since the 1970s, there has been both continuing and growing interest in developing accurate estimates of the annual fluvial transport (fluxes and loads) of suspended sediment and sediment‐associated chemical constituents. This study provides an evaluation of the effects of manual sample numbers (from 4 to 12 year?1) and sample scheduling (random‐based, calendar‐based and hydrology‐based) on the precision, bias and accuracy of annual suspended sediment flux estimates. The evaluation is based on data from selected US Geological Survey daily suspended sediment stations in the USA and covers basins ranging in area from just over 900 km2 to nearly 2 million km2 and annual suspended sediment fluxes ranging from about 4 Kt year?1 to about 200 Mt year?1. The results appear to indicate that there is a scale effect for random‐based and calendar‐based sampling schemes, with larger sample numbers required as basin size decreases. All the sampling schemes evaluated display some level of positive (overestimates) or negative (underestimates) bias. The study further indicates that hydrology‐based sampling schemes are likely to generate the most accurate annual suspended sediment flux estimates with the fewest number of samples, regardless of basin size. This type of scheme seems most appropriate when the determination of suspended sediment concentrations, sediment‐associated chemical concentrations, annual suspended sediment and annual suspended sediment‐associated chemical fluxes only represent a few of the parameters of interest in multidisciplinary, multiparameter monitoring programmes. The results are just as applicable to the calibration of autosamplers/suspended sediment surrogates currently used to measure/estimate suspended sediment concentrations and ultimately, annual suspended sediment fluxes, because manual samples are required to adjust the sample data/measurements generated by these techniques so that they provide depth‐integrated and cross‐sectionally representative data. Published 2014. This article is a U.S. Government work and is in the public domain in the USA.  相似文献   

4.
A general method is proposed which measures the increase in uncertainty when sampling effort is reduced in sediment fingerprinting. The method gives quantitative measures of how reduced sampling of material in one of the source areas, and/or of suspended sediment in streams, increases the uncertainties in the proportions of sediment contributed from the sources. Because the proportions of sediment contributed by the source areas must add to one, standard errors of the estimated proportions cannot be used as the usual measures of uncertainty: the paper uses instead the volume of the joint 95% confidence region for the estimated proportions. The paper shows how the uncertainty in this volume changes as numbers of suspended sediment samples, and the numbers of samples collected from cropped fields, are reduced by successive steps from 24 (20, in the case of cropped fields) to 16, 12, 8, 4 and 2 samples. As expected, uncertainty increases rapidly as the number of samples – whether of suspended sediment or from cropped fields – is reduced drastically. The pattern of increasing uncertainty is similar both for reductions in suspended sediment sampling, and for reduced sampling from cropped areas. When the number of suspended sediment samples, and the number of samples from cropped fields, are reduced to the same values, the increase in uncertainty from fewer suspended sediment samples was always slightly greater than the increased uncertainty from the reduced sampling of cropped areas, although this finding took no account of differences in the costs of field sampling and laboratory analysis. Copyright © 2016 John Wiley & Sons, Ltd.  相似文献   

5.
In situ turbidity meters are being increasingly used to generate continuous records of suspended sediment concentration in rivers. However, the usefulness of the information obtained depends heavily on the existence of a close relationship between fluctuations in suspended sediment concentration and turbidity and the calibration procedure that relates suspended sediment concentration to the turbidity meter's signal. This study assesses the relationship between suspended sediment concentration and turbidity for a small (1·19 km2) rural catchment in southern Brazil and evaluates two calibration methods by comparing the estimates of suspended sediment concentration obtained from the calibrated turbidity readings with direct measurements obtained using a USDH 48 suspended sediment sampler. With the first calibration method, the calibration relationship is derived by relating the turbidity readings to simultaneous measurements of concentration obtained from suspended sediment samples collected from the vicinity of the turbidity probe during flood events. With the second method, the calibration is based on the readings obtained from the turbidity meter when the probe immersed in samples of known concentration prepared using soils collected from the catchment. Overall, there was a close link between fluctuations in suspended sediment concentration and turbidity in the stream at the outlet of the catchment, and the estimates of sediment concentration obtained using the first calibration method corresponded closely with the conventionally measured sediment concentrations. However, use of the second calibration method introduced appreciable errors. When the estimated sediment concentrations were compared with the measured values, the mean errors were ± 122 mg l?1 and + 601 mg l?1 for the first and second calibration procedures respectively. Copyright © 2007 John Wiley & Sons, Ltd.  相似文献   

6.
ABSTRACT

Total suspended sediment (TSS) data for 1960–1970 and from recent investigations (1990–2000) are used to evaluate the variability in sediment yield of the Sanaga catchment (Cameroon) and the equivalent rates of erosion. At the annual and seasonal time scales, total suspended sediment concentrations for the Mbam sub-catchment are three to four times higher than for the Sanaga basin, reflecting the higher sensitivity of the former to erosion. Classical clockwise hysteresis loops are observed in both sub-catchments, despite a significant increase in human-induced catchment changes. At the multi-year time frame (over a 40-year period), it appears that the second half of the 1990s is marked by a downward trend in TSS. This shift is due to the control infrastructures (river impoundments and ponds) installed in certain parts of the whole catchment, combined with a drop in annual rainfall and river discharge.
Editor Z.W. Kundzewicz; Associate editor not assigned  相似文献   

7.
The dynamics of suspended sediment transport were monitored continuously in a large agricultural catchment in southwest France from January 2007 to March 2009. The objective of this paper is to analyse the temporal variability in suspended sediment transport and yield in that catchment. Analyses were also undertaken to assess the relationships between precipitation, discharge and suspended sediment transport, and to interpret sediment delivery processes using suspended sediment‐discharge hysteresis patterns. During the study period, we analysed 17 flood events, with high resolution suspended sediment data derived from continuous turbidity and automatic sampling. The results revealed strong seasonal, annual and inter‐annual variability in suspended sediment transport. Sediment was strongly transported during spring, when frequent flood events of high magnitude and intensity occurred. Annual sediment transport in 2007 yielded 16 614 tonnes, representing 15 t km?2 (85% of annual load transport during floods for 16% of annual duration), while the 2008 sediment yield was 77 960 tonnes, representing 70 t km?2 (95% of annual load transport during floods for 20% of annual duration). Analysis of the relationships between precipitation, discharge and suspended sediment transport showed that there were significant correlations between total precipitation, peak discharge, total water yield, flood intensity and sediment variables during the flood events, but no relationship with antecedent conditions. Flood events were classified in relation to suspended sediment concentration (SSC)–discharge hysteretic loops, complemented with temporal dynamics of SSC–discharge ranges during rising and falling flow. The hysteretic shapes obtained for all flood events reflected the distribution of probable sediment sources throughout the catchment. Regarding the sediment transport during all flood events, clockwise hysteretic loops represented 68% from river deposited sediments and nearby source areas, anticlockwise 29% from distant source areas, and simultaneity of SSC and discharge 3%. Copyright © 2010 John Wiley & Sons, Ltd.  相似文献   

8.
Arthur J. Horowitz 《水文研究》2003,17(17):3387-3409
In the absence of actual suspended sediment concentration (SSC) measurements, hydrologists have used sediment rating (sediment transport) curves to estimate (predict) SSCs for subsequent flux calculations. Various evaluations of the sediment rating‐curve method were made using data from long‐term, daily sediment‐measuring sites within large (>1 000 000 km2), medium (<1 000 000 to >1000 km2), and small (<1000 km2) river basins in the USA and Europe relative to the estimation of suspended sediment fluxes. The evaluations address such issues as the accuracy of flux estimations for various levels of temporal resolution as well as the impact of sampling frequency on the magnitude of flux estimation errors. The sediment rating‐curve method tends to underpredict high, and overpredict low SSCs. As such, the range of errors associated with concomitant flux estimates for relatively short time‐frames (e.g. daily, weekly) are likely to be substantially larger than those associated with longer time‐frames (e.g. quarterly, annually) because the over‐ and underpredictions do not have sufficient time to balance each other. Hence, when error limits must be kept under ±20%, temporal resolution probably should be limited to quarterly or greater. The evaluations indicate that over periods of 20 or more years, errors of <1% can be achieved using a single sediment rating curve based on data spanning the entire period. However, somewhat better estimates for the entire period, and markedly better annual estimates within the period, can be obtained if individual annual sediment rating curves are used instead. Relatively accurate (errors <±20%) annual suspended sediment fluxes can be obtained from hydrologically based monthly measurements/samples. For 5‐year periods or longer, similar results can be obtained from measurements/samples collected once every 2 months. In either case, hydrologically based sampling, as opposed to calendar‐based sampling is likely to limit the magnitude of flux estimation errors. Published in 2003 John Wiley & Sons, Ltd.  相似文献   

9.
Understanding spatio-temporal suspended sediment dynamics is more important in large watersheds due to the decisive role of local source apportionment in sediment transport and yield. The Talar River with a large mountainous watershed in northern Iran, which plays a vital role in water supply for agriculture and drinking, recently has faced quality degradation. The current study explores the relative contribution of suspended sediment sources using geochemical tracers and fingerprinting techniqu...  相似文献   

10.
ABSTRACT

Sedimentation in navigable waterways and harbours is of concern for many water and port managers. One potential source of variability in sedimentation is the annual sediment load of the river that empties in the harbour. The main objective of this study was to use some of the regularly monitored hydro-meteorological variables to compare estimates of hourly suspended sediment concentration in the Saint John River using a sediment rating curve and a model tree (M5?) with different combinations of predictors. Estimated suspended sediment concentrations were multiplied by measured flows to estimate suspended sediment loads. Best results were obtained using M5? with four predictors, returning an R2 of 0.72 on calibration data and an R2 of 0.46 on validation data. Total load was underestimated by 1.41% for the calibration period and overestimated by 2.38% for the validation period. Overall, the model tree approach is suggested for its relative ease of implementation and constant performance.
EDITOR M.C. Acreman; ASSOCIATE EDITOR B. Touaibia  相似文献   

11.
Abstract

A laboratory experiment was designed to determine the spectral characteristics of different types of sediment suspended in water in the visible and near infrared wavelengths (0.45–0.9 μm) using a four-channel radiometer. Field collected sediments were resuspended in water to produce different concentration levels for the measurement of radiance. Spectral measurements of turbid water showed a distinctive difference in the behaviour of radiance with change in the inorganic suspended sediment concentration and type. It was noted that the correlation between the suspended sediment concentration and the radiance varied with the mineral composition of the sediment. The clay minerals of low specific gravity had larger values of radiance than those from high specific gravity nonclay minerals. Based on the results obtained, it appears that an algorithm to estimate suspended sediment concentration can be developed from radiance.  相似文献   

12.
Based on rainfall erosion of soil and suspended sediment transport in storm events, a method is proposed to predict peak suspended sediment concentration and suspended sediment yield in watersheds based on rainfall characteristics prior to peak rainfall intensity. The rainfall characteristics factors that dominate peak suspended sediment concentration Cp are rainfall erosion factor Ref, first peak rainfall intensity of area-average rainfall ip1 and antecedent precipitation index Iap; the rainfall characteristics factors that dominate suspended sediment yield Yss in storm events are total rainfall P, suspended sediment yield factor Rsf and antecedent precipitation index Iap. This research focuses on watersheds in Liau-Kwei observation station along Lao-Nung River in southern Taiwan as the research object, and adopts the PSED-model to simulate the discharge hydrograph, suspended sediment concentration hydrograph and suspended sediment yield in 11 storm events for analysis. The analytical results show that there is a good correlation between the above-mentioned rainfall characteristics factors and Cp as well as Yss, thus enabling Cp and Yss to be predicted by using Expressions (13) and (14). These two expressions are utilized to predict Cp and Yss of Typhoon Morakot in 2009, and the results are compared with those from simulation by using the PSED-model. The result of comparison shows there is a good capability in predicting. For the watersheds where it is necessary to predict Cp and Yss of a storm event for the benefit of effective operation of water resource facilities, the aforesaid rainfall characteristics factors can be utilized to establish applicable models for prediction.  相似文献   

13.
Glacierised basins are significant sources of sediments generated by glacial retreat. Estimation of suspended sediment transfer from glacierised basins is very important in reservoir planning for hydropower projects in Himalaya. The present study indicates that storage and release of sediment in proglacial streams may categorise the pattern of suspended sediment transfer from these basins. Assessment of suspended sediment concentration (SSC), suspended sediment load (SSL) and yield has been undertaken for Dunagiri Glacier basin located in Garhwal Himalaya (30o33'20”N, 79o53'36”E), and its results are compared with the Gangotri and Dokriani glaciers sharing close proximity. Out of the total drainage basin area, about 14.3 % of the area is glacierised. Data were collected for five ablation seasons (1984–1989, barring 1986). The mean daily SSCs for July, August and September were 333.9, 286.0 and 147.15 mg/l, respectively, indicating highest concentration of mean daily suspended sediment in July followed by August. SSL trends were estimated to be 93.0, 57.0 and 21.3 tonnes. About 59% of the total SSL of the melt period was transported during the months of August and September. Sediment yield for the study basin was computed to be 296.3 t km?2 yr ?1. It is observed that the cumulative proportion of SSC precedes the discharge throughout the melt season except in the year 1987. Release of SSL in terms of total load is less in the early part of melt season than in the later stage as compared to that of discharge. Diurnal variations in SSC reach their maximum at 2400 h, and therefore, SSC was found to be high during night (2000–0400 h). There was a good relationship between SSC and SSL with discharge for the ablation seasons (1988 and 1989). Mean monthly SSC and mean monthly SSL provide a good exponentional relationship with mean monthly temperature. Copyright © 2012 John Wiley & Sons, Ltd.  相似文献   

14.
Abstract

Water discharge and suspended and dissolved sediment data from three rivers (Napo, Pastaza and Santiago) in the Ecuadorian Amazon basin and a river in the Pacific basin (Esmeraldas) over a 9-year period, are presented. This data set allows us to present: (a) the chemical weathering rates; (b) the erosion rates, calculated from the suspended sediment from the Andean basin; (c) the spatio-temporal variability of the two regions; and (d) the relationship between this variability and the precipitation, topography, lithology and seismic activity of the area. The dissolved solids load from the Esmeraldas basin was 2 × 106 t year-1, whereas for the Napo, Pastaza and Santiago basins, it was 4, 2 and 3 × 106 t year-1, respectively. For stations in the Andean piedmont of Ecuador, the relationship between surface sediment and the total sediment concentration was found to be close to one. This is due to minimal stratification of the suspended sediment in the vertical profile, which is attributed to turbulence and high vertical water speeds. However, during the dry season, when the water speed decreases, sediment stratification appears, but this effect can be neglected in the sediment flux calculations due to low concentration rates. The suspended sediment load in the Pacific basin was 6 × 106 t year-1, and the total for the three Amazon basins was 47 × 106 t year-1. The difference between these contributions of the suspended sediment load is likely due to the tectonic uplift and the seismic and volcanic dynamics that occur on the Amazon side.

Editor Z.W. Kundzewicz

Citation Armijos, E., Laraque, A., Barba, S., Bourrel, L., Ceron, C., Lagane, C., Magat, P., Moquet, J.-S., Pombosa, R., Sondag, F., Vauchel, P., Vera, A., and Guyot, J.L., 2013. Yields of suspended sediment and dissolved solids from the Andean basins of Ecuador. Hydrological Sciences Journal, 58 (7), 1478–1494.  相似文献   

15.
Seasonal suspended sediment transfer in glaciated catchments is responsive to meteorological, geomorphological, and glacio-fluvial conditions, and thus is a useful indicator of environmental system dynamics. Knowledge of multifaceted fluvial sediment-transfer processes is limited in the Alaskan Arctic – a region sensitive to contemporary environmental change. For two glaciated sub-catchments at Lake Peters, northeast Brooks Range, Alaska, we conducted a two-year endeavour to monitor the hydrology and meteorology, and used the data to derive multiple-regression models of suspended sediment load. Statistical selection of the best models shows that incorporating meteorological or temporal explanatory variables improves performances of turbidity- and discharge-based sediment models. The resulting modelled specific suspended sediment yields to Lake Peters are: 33 (20–60) t km−2 yr−1 in 2015, and 79 (50–140) t km−2 yr−1 in 2016 (95% confidence band estimates). In contrast to previous studies in Arctic Alaska, fluvial suspended sediment transfer to Lake Peters was primarily influenced by rainfall, and secondarily influenced by temperature-driven melt processes associated with clockwise diurnal hysteresis. Despite different sub-catchment glacier coverage, specific yields were the same order of magnitude from the two primary inflows to Lake Peters, which are Carnivore Creek (128 km2; 10% glacier coverage) and Chamberlin Creek (8 km2; 23% glacier coverage). Seasonal to longer-term sediment exhaustion and/or contrasting glacier dynamics may explain the lower than expected relative specific sediment yield from the more heavily glacierized Chamberlin Creek catchment. Absolute suspended sediment yield (t yr−1) from Carnivore Creek to Lake Peters was 27 times greater than from Chamberlin Creek, which we attribute to catchment size and sediment supply differences. Our results provide a foundational understanding of the current sediment transfer regime and are useful for predicting changes in fluvial sediment transport in glaciated Alaskan Arctic catchments.  相似文献   

16.
ABSTRACT

Suspended solids are present in every river, but high quantities can worsen the ecological conditions of streams; therefore, effective monitoring and analysis of this hydrological variable are necessary. Frequency, seasonality, inter-correlation, extreme events, trends and lag analyses were carried out for peaks of suspended sediment concentration (SSC) and discharge (Q) data from Slovenian streams using officially monitored data from 1955 to 2006 that were made available by the Slovenian Environment Agency. In total more than 500 station-years of daily Q and SSC data were used. No uniform (positive or negative) trend was found in the SSC series; however, all the statistically significant trends were decreasing. No generalization is possible for the best fit distribution function. A seasonality analysis showed that most of the SSC peaks occurred in the summer (short-term intense convective precipitation produced by thunderstorms) and in the autumn (prolonged frontal precipitation). Correlations between Q and SSC values were generally relatively small (Pearson correlation coefficient values from 0.05 to 0.59), which means that the often applied Q–SSC curves should be used with caution when estimating annual suspended sediment loads. On average, flood peak Q occurred after the corresponding SSC peak (clockwise-positive hysteresis loops), but the average lag time was rather small (less than 1 day).
Editor M.C. Acreman; Associate editor Y. Gyasi-Agyei  相似文献   

17.
Abstract

This paper presents a reach-scale sediment balance of a large impounded Mediterranean river (the lower Ebro, 1998–2008). Multi-temporal sediment storage and the influence of floods and tributaries on the sediment load were examined using continuous discharge and turbidity records. The mean annual suspended sediment load at the reach outlet (Xerta) is 0.12?×?106 t, corroborating previous results. Suspended sediment concentrations were low (SSCmean?=?13 mg L-1), attaining a maximum of 274 mg L-1. Erosion processes (channel-scour, bank erosion) are dominant, and net export of sediment occurs over the long term. Unexpectedly, ephemeral tributaries were found to contribute significantly: sediment delivered during torrential events attained 5% of the Ebro annual load, and was even larger than that in flushing flows. Overall, most of the suspended sediment load is transported by floods (up to 65% in some years). The results constitute basic information to underpin current management actions aiming to achieve the sustainability of the riverine and deltaic system.

Editor D. Koutsoyiannis; Associate editor D. Hughes

Citation Tena, A., Batalla, R.J. and Vericat, D., 2012. Reach-scale suspended sediment balance downstream from dams in a large Mediterranean river. Hydrological Sciences Journal, 57 (5), 831–849.  相似文献   

18.
Abstract

The study of sediment load is important for its implications to the environment and water resources engineering. Four models were considered in the study of suspended sediment concentration prediction: artificial neural networks (ANNs), neuro-fuzzy model (NF), conjunction of wavelet analysis and neuro-fuzzy (WNF) model, and the conventional sediment rating curve (SRC) method. Using data from a US Geological Survey gauging station, the suspended sediment concentration predicted by the WNF model was in satisfactory agreement with the measured data. Also the proposed WNF model generated reasonable predictions for the extreme values. The cumulative suspended sediment load estimated by this model was much higher than that predicted by the other models, and is close to the observed data. However, in the current modelling, the ANN, NF and SRC models underestimated sediment load. The WNF model was successful in reproducing the hysteresis phenomenon, but the SRC method was not able to model this behaviour. In general, the results showed that the NF model performed better than the ANN and SRC models.

Citation Mirbagheri, S. A., Nourani, V., Rajaee, T. & Alikhani, A. (2010) Neuro-fuzzy models employing wavelet analysis for suspended sediment concentration prediction in rivers. Hydrol. Sci. J. 55(7), 1175–1189.  相似文献   

19.
The efficacy of in‐stream nephelometric turbidometry as a surrogate for total suspended solids (TSS) and total phosphorus (TP) concentrations was evaluated for use in low turbidity (<50 NTU) subalpine watersheds at Lake Tahoe, California–Nevada, USA. Continuous turbidity records for the 1999, 2000 and 2001 snowmelt seasons and data from water quality samples (1982–2000) were examined to determine watershed sediment delivery dynamics. Strong correlations were found between turbidity and both TSS and TP concentration. The strong correlation indicates that turbidity can serve as a good surrogate for direct measurement in these watersheds. The watersheds displayed clockwise hysteresis: sediment flushing and depletion, on daily, seasonal and decadal time‐scales. The hysteresis curves had strong concave shapes, indicating a sensitive response to peak flow. A pronounced seasonal trend was observed for the ratio of suspended sediment concentration (SSC)/discharge over time, indicating early season flushing of available sediment. Significant linear relationships (p < 0·05) were found for 12 of 17 years. Comparison of annual sediment rating curve coefficients indicated smaller coefficients during high sediment loading years and in the years following. The smaller coefficients are evidence of sediment depletion during high flow years. The effect of hysteresis on monitoring methods was illustrated by comparing turbidity estimates of TSS load with sediment rating curve estimates of SSC. After accounting for differences in SSC/TSS methods of analysis, daily loads calculated with turbidity methods were 58–98% of rating curve estimates for the spring snowmelt seasons of 1999–2001. Copyright © 2006 John Wiley & Sons, Ltd.  相似文献   

20.
Abstract

Abstract The prediction and estimation of suspended sediment concentration are investigated by using multi-layer perceptrons (MLP). The fastest MLP training algorithm, that is the Levenberg-Marquardt algorithm, is used for optimization of the network weights for data from two stations on the Tongue River in Montana, USA. The first part of the study deals with prediction and estimation of upstream and down-stream station sediment data, separately, and the second part focuses on the estimation of downstream suspended sediment data by using data from both stations. In each case, the MLP test results are compared to those of generalized regression neural networks (GRNN), radial basis function (RBF) and multi-linear regression (MLR) for the best-input combinations. Based on the comparisons, it was found that the MLP generally gives better suspended sediment concentration estimates than the other neural network techniques and the conventional statistical method (MLR). However, for the estimation of maximum sediment peak, the RBF was mostly found to be better than the MLP and the other techniques. The results also indicate that the RBF and GRNN may provide better performance than the MLP in the estimation of the total sediment load.  相似文献   

设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号