首页 | 本学科首页   官方微博 | 高级检索  
相似文献
 共查询到20条相似文献,搜索用时 916 毫秒
1.
INTRODUCTIONThe planned outer ring road in Shanghai City crosses the Huangpu mver, a tribuop of the YangtzeXiver Veq near the river mouth. The sinldng method is reconunended in constIUchon of submergedcrossing-river tonnel which is 725m long and has a transversal section of M.6InX8.75m. For the design ofthe consAnction scheme, sediment dePosihon the in the excavated trench serves as an impoftaIltparameter. Physical mode exPeriments were then conducted to inveshgate the rate of sedim…  相似文献   

2.
Floodplains are depositional features of riverine landscapes that display complex sedimentation patterns that are amenable to multi‐scale approaches. We examined sedimentation in the Lower Balonne floodplain, Queensland, Australia, at three different spatial scales: the channel (103 km), floodplain process zone (10 km) and geomorphic unit (102 m) scales, and compared scale‐related patterns evident from stratigraphy with those evident from quantitative multivariate analysis. Three stratigraphic sequences were found in the Lower Balonne floodplain: generally fining upward, episodic fining upward, and mud‐dominated. Stratigraphical analysis revealed the detailed character of sedimentary sequences embedded within the scale patterns derived from multivariate analysis. Multivariate statistical analyses of a range of textural and geochemical data revealed different patterns of floodplain sedimentation at each scale. At the channel scale, sediment texture and geochemistry were more heterogeneous in the Culgoa River than in Briarie Creek. At the floodplain process zone scale clear patterns of sediment texture and geochemistry were observed along the upper, mid and lower floodplain process zones of Briarie Creek, but not along the Culgoa River. At the geomorphic unit scale, clear patterns of sediment texture and geochemistry were observed among the bank, buried channel and flat floodplain units of the Culgoa River, but were not as clear in Briarie Creek. Recognition of rivers as hierarchically organized systems is an emerging paradigm in river science. Our study supports this paradigm by demonstrating that different sedimentation patterns occur at different scales to reveal a hierarchically organized floodplain environment. Copyright © 2006 John Wiley & Sons, Ltd.  相似文献   

3.
Side channel construction is a common intervention applied to increase a river's conveyance capacity and to increase its ecological value. Past modelling efforts suggest two mechanisms affecting the morphodynamic change of a side channel: (1) a difference in channel slope between the side channel and the main channel and (2) bend flow just upstream of the bifurcation. The objective of this paper was to assess the conditions under which side channels generally aggrade or degrade and to assess the characteristic timescales of the associated morphological change. We use a one‐dimensional bifurcation model to predict the development of side channel systems and the characteristic timescale for a wide range of conditions. We then compare these results to multitemporal aerial images of four side channel systems. We consider the following mechanisms at the bifurcation to be important for side channel development: sediment diversion due to the bifurcation angle, sediment diversion due to the transverse bed slope, partitioning of suspended load, mixed sediment processes such as sorting at the bifurcation, bank erosion, deposition due to vegetation, and floodplain sedimentation. There are limitations to using a one‐dimensional numerical model as it can only account for these mechanisms in a parametrized manner, but the model reproduces general behaviour of the natural side channels until floodplain‐forming processes become important. The main result is a set of stability diagrams with key model parameters that can be used to assess the development of a side channel system and the associated timescale, which will aid in the future design and maintenance of side channel systems. © 2017 The Authors. Earth Surface Processes and Landforms published by John Wiley & Sons Ltd.  相似文献   

4.
洞庭湖冲淤变化分析(1956-1995年)   总被引:23,自引:1,他引:22  
施修端  夏薇  杨彬 《湖泊科学》1999,11(3):199-205
根据1956-1995年洞庭湖水文泥沙原型观测和地形测绘等翔实资料,运用输沙量法和地形法对洞庭湖冲瘀变化进行了认真的统计分析,分析结果表明,洞庭湖来水量以四水为主,占57.8%,来沙量以四口为主,多年平均沉积率为74.0%,出湖仅占26.0%;淤积量及湖水沙量随着四分流分沙比的减少而减少。  相似文献   

5.
1 INTRODUCTION The transport of sediment in rivers with active floodplains is a two-dimensional process because the main channel and the floodplain can have very different transport capacities. Therefore, two-dimensional (2D) models are often used to simulate the streamwise and transverse variations of sediment erosion and deposition. Many 2D numerical models have been presented to simulate sediment transport in floodplains (James, 1985; Pizzuto, 1987; Howard, 1992; Nicholas and Walli…  相似文献   

6.
The method of multiple regression is used to analyze the influences of flood events from the coarse sediment producing areas on the channel siltation and fluvial process of the lower Yellow River based on the flood events from 1950 to 1985. The results showed that the flood events from the coarse sediment producing areas carry larger amounts of sediment load and coarser particle sizes than from other source areas, which increases deposition in the lower river channel. And there exist good correlations between channel siltation of the lower reaches of the Yellow River and the coming water and sediment of flood events from the coarse sediment producing areas. Through these correlations, the amounts of sediment deposition in the lower river channel could be roughly estimated based on the runoff and sediment load of flood events from the coarse sediment producing areas. The sediment deposition caused the fluvial process. There exists a complex response of channel form change to the coming water and sediment load of flood events from the coarse sediment producing areas. When the sediment concentration is smaller than 200kg/m3, the ratio between wide-depth ratio after flood and wide-depth ratio before flood((B/h)a / (B/h)b) will increase with the increase of the maximum sediment concentration; when the sediment concentration is near 200kg/m3, (B/h)a / (B/h)b reaches the maximum value; and when the sediment concentration reaches the limits of hyperconcentrated flow, (B/h)a / (B/h)b will decrease with the increase of the maximum sediment concentration. Generally, flood events from the coarse sediment producing areas made channel form of the lower Yellow River deeper and narrower, but a large amount of sediment deposition simultaneously occurs. So, the impacts of flood events from the coarse sediment producing areas on the channel of the lower Yellow River are lessened.  相似文献   

7.
A metal-contaminated overbank deposit in west-central South Dakota resulted from the discharge of a large volume of mine tailings into a river system between the late 1800s and 1977. The deposit along the Belle Fourche River is typically up to 2 m thick and extends about 90 m away from the channel along the insides of meander bends. The sediments contain above-background levels of copper, iron, manganese, zinc, and particularly arsenic, which is commonly two orders of magnitude above background level in the contaminated sediments. Carbonate minerals in the deposit limit the desorption of arsenic by preventing acid formation. Arsenic concentrations provide a measure of the dilution of mine tailings by uncontaminated sediment. The arsenic appears to have been transported and deposited as arsenopyrite, but is now at least partially associated with iron oxides and hydroxides. Within individual samples, arsenic concentration has an inverse relation with grain size that results from the more efficient accumulation of arsenic on the greater surface area of the smaller particles. Arsenic concentration is inversely related to the sample weight percent finer than 16 μm, however, as a consequence of the dilution of the contaminated sediments by uncontaminated sediment with a finer grain-size distribution. Dilution by uncontaminated sediment from tributaries cause arsenic concentrations to decrease by a factor of 3 along 100 km of floodplain. An influx at high streamflow of uncontaminated sediment from terraces and the premining floodplain as well as from tributaries causes arsenic concentrations in parts of the contaminated deposit that are farthest away from the channel to be two to three times less than arsenic concentrations in overbank sediment that is immediately adjacent to the channel.  相似文献   

8.
Experiments with the 10 m Flood Channel Facility at HR Wallingford, UK, indicate a fundamental dependency of the overbank deposition pattern of channel suspended sediments on channel planform. Two experiments (100 and 140 l s?1) in a 1·95 m wide straight channel showed deposition concentrated in a berm along the channel bank. Little sediment was transferred further onto the floodplain. For the larger flow, the berm formed further from the channel. A single experiment (103 l s?1) with a 1·31 m wide meandering channel showed deposition across the entire floodplain tongue between successive meanders. Maximum deposition occurred on the downstream side of the meander, just past the bend apex. These generalized flume results complement the real‐world but site‐specific data of field studies. Copyright © 2002 John Wiley & Sons, Ltd.  相似文献   

9.
金沙江下游4个梯级水电站总装机容量相当于两座三峡水库,是“西电东送”中部地区的源头工程,工程效益发挥对经济社会发展意义重大。2012年以来,向家坝、溪洛渡、乌东德和白鹤滩电站等陆续蓄水运行,层层拦截金沙江的泥沙,2013—2020年向家坝出库年输沙量均值下降至152万t,减幅超过99%。大量泥沙淤积在梯级水库内,同时向家坝以下河道发生长距离冲刷。本文以自金沙江下游工程筹建以来的观测资料为基础,针对梯级水库的泥沙淤积和坝下游河道冲刷规律开展研究,结果表明:金沙江下游四个梯级电站自建成运行至2020年底,累计淤积泥沙约5.98亿m3,其中溪洛渡库区淤积量占比达92.5%,2013-2020年溪洛渡和向家坝水库排沙比分别为2.64%和22.2%,其水库泥沙主要淤积在常年回水区的干流河道内,以死库容内淤积为主,侵占有效库容的比例小于1.3%。金沙江下游库区干流河道的峡谷特征明显,淤积多表现为主河槽的平铺式淤高。溪洛渡和向家坝库区淤积的泥沙沿程分选特征明显,越靠近坝前,中数粒径减小、细颗粒泥沙沙量百分数增加,极细颗粒泥沙会在库区一定范围内大量沉积。向家坝下游河床普遍冲刷,但...  相似文献   

10.
This study focused on a spatial and temporal analysis of the active channel and associated floodplain lakes using aerial photographs spanning five decades (1942, 1962, 1985, 1999) over a 140 km long reach of the Sacramento. Planimetric changes were analysed longitudinally and temporally to highlight the spatial structures and their evolution through time. The results underline complex changes and space–time pattern in bank erosion, channel length and active channel width. The bank erosion and also channel lengthening were higher between 1962 and 1985 than in the two periods studied before and after. Active channel width significantly decreased from 1942 to 1999; partly progressively from upstream to downstream with local widening whatever the studied periods. Similarly the floodplain lakes observed before 1942–1962 were significantly different in size and geometry from those which appeared during the most recent period. The creation of lakes is less frequent after the 1940s, with a secondary peak of occurrence during the 1962–1985 period. The interpretation of these changes is complex because of various human pressures acting over different time scales (bank protection, flow diversion, sediment starvation, land‐use changes) and various natural influences (flood sequences through out the period, geological setting). The findings are discussed by comparison with previous work, and highlight the important effect of dam impact on peak flow and sediment starvation modifying longitudinally hydraulic conditions within the channel, but also the increase in riprap protection which induced change in bank erosion, channel planimetry and floodplain lake characters (geometry, frequency of renewal). Variation in flood intensities is also observed as having positive effects on the bank erosion pattern. Secondarily, land‐use changes also controlled bank erosion intensity. Copyright © 2010 John Wiley & Sons, Ltd.  相似文献   

11.
《国际泥沙研究》2016,(3):264-270
The functions of the diversion channel are usually disturbed by sediment erosion and deposition. Con-sidering the effects of unsaturated sediment flow and narrowed cross section the diversion channel is enormously eroded. The discharge capacity, however, is deteriorated for the local deposition which lessens the water depth to satisfy the minimum navigable flow rate. In this study, the alternative diversion channel with unsaturated sediment flow at Hanjiang River, China, was taken as an example. The impacts of bed morphology for flood events and normal flow conditions were analyzed. The results show that the consideration of bed morphology is essential to design the diversion channel. Even for the unsaturated and eroded channel, the local deposition can reduce the water depth and restrict the navigable requirement under normal flow conditions.  相似文献   

12.
Deposition and erosion play a key role in the determination of the sediment budget of a river basin, as well as for floodplain sedimentation. Floodplain sedimentation, in turn, is a relevant factor for the design of flood protection measures, productivity of agro‐ecosystems, and for ecological rehabilitation plans. In the Mekong Delta, erosion and deposition are important factors for geomorphological processes like the compensation of deltaic subsidence as well as for agricultural productivity. Floodplain deposition is also counteracting the increasing climate change induced hazard by sea level rise in the delta. Despite this importance, a sediment database of the Mekong Delta is lacking, and the knowledge about erosion and deposition processes is limited. In the Vietnamese part of the Delta, the annually flooded natural floodplains have been replaced by a dense system of channels, dikes, paddy fields, and aquaculture ponds, resulting in floodplain compartments protected by ring dikes. The agricultural productivity depends on the sediment and associated nutrient input to the floodplains by the annual floods. However, no quantitative information regarding their sediment trapping efficiency has been reported yet. The present study investigates deposition and erosion based on intensive field measurements in three consecutive years (2008, 2009, and 2010). Optical backscatter sensors are used in combination with sediment traps for interpreting deposition and erosion processes in different locations. In our study area, the mean calculated deposition rate is 6.86 kg/m2 (≈ 6 mm/year). The key parameters for calculating erosion and deposition are estimated, i.e. the critical bed shear stress for deposition and erosion and the surface constant erosion rate. The bulk of the floodplain sediment deposition is found to occur during the initial stage of floodplain inundation. This finding has direct implications on the operation of sluice gates in order to optimize sediment input and distribution in the floodplains. Copyright © 2013 John Wiley & Sons, Ltd.  相似文献   

13.
李涛  夏润亮  夏军强  张俊华  俞彦  吴丹 《湖泊科学》2021,33(5):1532-1540
支流作为水库综合效益发挥的重要组成部分,其河口泥沙大幅淤积会影响水库综合效益的发挥.选取多沙河流水库黄河小浪底库区畛水、石井两支流作为典型实例,在对1999-2015年汛后水库的来水来沙、水库调度、库区干支流淤积量与形态分析基础上,研究干支流淤积形态的变化,重点研究支流口门拦门沙坎抬升变化特征,结果表明:支流的分流及淤积与入库流量、含沙量及库区的淤积形态有关.入库流量越大,支流分流比小,支流淤积规模小;入库含沙量越大,支流分沙比越大,支流淤积规模越大.  相似文献   

14.
We analyzed variation of channel–floodplain suspended sediment exchange along a 140 km reach of the lower Amazon River for two decades (1995–2014). Daily sediment fluxes were determined by combining measured and estimated surface sediment concentrations with river–floodplain water exchanges computed with a two‐dimensional hydraulic model. The average annual inflow to the floodplain was 4088 ± 2017 Gg yr?1 and the outflow was 2251 ± 471 Gg yr?1, respectively. Prediction of average sediment accretion rate was twice the estimate from a previous study of this same reach and more than an order of magnitude lower than an estimate from an earlier regional scale study. The amount of water routed through the floodplain, which is sensitive to levee topography and increases exponentially with river discharge, was the main factor controlling the variation in total annual sediment inflow. Besides floodplain routing, the total annual sediment export depended on the increase in sediment concentration in lakes during floodplain drainage. The recent increasing amplitude of the Amazon River annual flood over two decades has caused a substantial shift in water and sediment river–floodplain exchanges. In the second decade (2005–2014), as the frequency of extreme floods increased, annual sediment inflow increased by 81% and net storage increased by 317% in relation to the previous decade (1995–2004). Copyright © 2017 John Wiley & Sons, Ltd.  相似文献   

15.
A bank and floodplain sediment budget was created for three Piedmont streams tributary to the Chesapeake Bay. The watersheds of each stream varied in land use from urban (Difficult Run) to urbanizing (Little Conestoga Creek) to agricultural (Linganore Creek). The purpose of the study was to determine the relation between geomorphic parameters and sediment dynamics and to develop a floodplain trapping metric for comparing streams with variable characteristics. Net site sediment budgets were best explained by gradient at Difficult Run, floodplain width at Little Conestoga Creek, and the relation of channel cross‐sectional area to floodplain width at Linganore Creek. A correlation for all streams indicated that net site sediment budget was best explained by relative floodplain width (ratio of channel width to floodplain width). A new geomorphic metric, the floodplain trapping factor, was used to compare sediment budgets between streams with differing suspended sediment yields. Site sediment budgets were normalized by floodplain area and divided by the stream's sediment yield to provide a unitless measure of floodplain sediment trapping. A floodplain trapping factor represents the amount of upland sediment that a particular floodplain site can trap (e.g. a factor of 5 would indicate that a particular floodplain site traps the equivalent of 5 times that area in upland erosional source area). Using this factor we determined that Linganore Creek had the highest gross and net (floodplain deposition minus bank erosion) floodplain trapping factor (107 and 46, respectively) that Difficult Run the lowest gross floodplain trapping factor (29) and Little Conestoga Creek had the lowest net floodplain trapping factor (–14, indicating that study sites were net contributors to the suspended sediment load). The trapping factor is a robust metric for comparing three streams of varied watershed and geomorphic character, it promises to be a useful tool for future stream assessments. Published 2012. This article is a U.S. Government work and is in the public domain in the USA.  相似文献   

16.
An important gap in the management of land erosion in mining-affected areas is the understanding of the entire sediment routing system and the links between sources and storage at the catchment scale. In this study, we examine sediment delivery and its seasonality in the nickel mining-affected Santa Cruz and Pamalabawan catchments in the Philippines. We monitored discharge, suspended sediment concentrations and suspended sediment loads across 13 sub-catchments with contrasting degrees of mining influence from June 2018 to July 2019. First, we show the importance of the size of the area that has been physically disturbed within our sub-catchments, with as little as 10–22% of relative disturbance area being enough to generate four-fold to eight-fold increase in the sediment yield relative to less disturbed and pristine areas. We found that sub-catchments with > 10% disturbance exhibit the highest sediment yields (15.5 ± 44.7 t km−2 d−1) compared with sub-catchments with < 10% disturbance (3.6 ± 17.7 t km−2 d−1) and undisturbed catchments (2.0 ± 5.7 t km−2 d−1). We also show that sediment flushing predominantly occurs in the most disturbed sub-catchments at the onset of the wet season. A small number of flood events transports the bulk of the sediment, with hysteresis effects being most pronounced in disturbed areas. Lastly, we show that floodplain sediment recycling exerts a key control on sediment delivery at both reach and catchment scales, with the relative contribution of floodplain sources to the sediment budget becoming dominant in the latter stages of the wet season- up to 89% of the total sediment export per storm event. This study highlights the importance of both degree of disturbance and sediment pathways in controlling sediment transport in mining-disturbed areas, and that considering the entire sediment routing system including intermediate stores is crucial to optimizing existing and future measures against siltation and potential contamination of trace metals and metalloids downstream of mining areas.  相似文献   

17.
Recent studies of sediment delivery and budgets in the United States indicate that upland erosion rates at a given time may not explain contemporaneous sediment yields from a drainage basin. This suggests temporal discontinuities in sediment delivery associated with hillslope and channel storage processes. Integration of sediment production, storage and transport is essential to understand sediment routing in basins. We analysed each process chronologically using aerial photographs, monitoring data of sediment movement and annual tree-rings, and then compared estimated temporal changes in sediment production from hillslopes, floodplain disturbance areas and sediment transport in river channels. Toeslopes, floodplains and alluvial fans together contained 59 per cent of sediment eroded from uplands over the last 30 years. Monitoring results of riverbed changes showed that the volume of stored sediment on floodplains decreased exponentially with succeeding floods. The age distribution of floodplain deposits reflected the disturbance history of a river channel, and followed an exponential decrease with age. The results of this study may have important implications for sediment control plans for watersheds in steep regions.  相似文献   

18.
This paper outlines a numerical model for the prediction of floodplain inundation sequences, overbank deposition rates and deposit grain size distributions. The model has two main components: first, a simplified hydraulic scheme which predicts floodwater flow depths and velocities, and second, a sediment transport element which employs a mass balance relation describing suspended sediment dispersion by convective and diffusive processes and sediment deposition as a function of particle settling rates. These relationships are solved numerically on a finite difference grid that accurately replicates the complex topographic features typical of natural river floodplains. The model is applied to a 600 m reach of the River Culm, Devon, U.K. using data derived from a range of field and laboratory techniques. Continuous records of river stage and suspended sediment concentration provide the model's upstream boundary input requirements. These are supplemented by measurements of the in situ settling characteristics of the suspended sediment load. The model's sediment transport component is calibrated with the aid of a dataset of measured overbank deposition amounts derived from flood events over a 16 month period. The model is shown to predict complicated floodwater inundation sequences and patterns of suspended sediment dispersion and deposition, which are largely a product of the complex topography of the floodplain. These results compare favourably with observations of overbank processes and are an improvement over those of previous models which have employed relatively simple representations of floodplain geometry. © 1997 by John Wiley & Sons, Ltd.  相似文献   

19.
Red Creek, in the Red Desert area of the Great Divide Basin, Wyoming, is an arid-region anastomosing stream. The narrow, deep, and sinuous main channel is flanked by anastomosing flood channels, or anabranches. Most anabranches are initiated at meander bends. The primary mechanism of anabranch initiation is avulsion during overbank floods. Anabranch enlargement occurs by headward erosion. Anabranches act as distributary channels during floods, when water and sediment from overbank flows are transported to and deposited on the floodplain via the anabranches. During periods of low discharges, the anabranches act as tributaries to the main channel, transporting runoff from the floodplain and surrounding hillslopes to the main channel of Red Creek. Aggradation is occurring in the main channel and on the floodplain throughout the study reach. Infilling of the main channel occurs primarily by lateral accretion, while the floodplain accretes vertically through deposition of overbank sediment from the main channel and anabranches. Infilling of the main channel may cause avulsion of the main channel into an anabranch. The abandoned main channel segment may then fill completely or act as an anabranch. Because lateral migration of channels is inhibited by the high cohesion of the silt and clay channel sediment, periodic avulsion is the primary form of lateral mobility in the system.  相似文献   

20.
Changxing Shi 《水文研究》2016,30(2):232-244
Using hydrological and sediment data, this study investigated decadal trends in sediment erosion/deposition in the Inner Mongolia reach of the upper Yellow River. The calculated yearly sediment erosion/deposition show that the reach was dominated by aggradation, degradation, and aggradation successively in three periods with the years around 1961 and 1987 as break‐points. By constructing relations between water discharge and sediment load, the contributions of key factors to the changes in sediment erosion/deposition in the reach were quantified. Results show that the sediment retention behind the main stem dams, the increase of natural runoff, and the decrease of sediment inputs from tributaries and upstream watershed were the main factors causing the transition from aggradation during 1955–1961 to degradation during 1962–1987. The reduction of natural runoff, the decrease of sediment retention behind dams, and the rise of sediment supply from tributaries were the key causes of the reversal from degradation in 1962–1987 to aggradation in 1988–2003. Water diversion has played an important role in the long‐term aggradation of the Inner Mongolia reach. The main stem dams had functioned to alleviate siltation after 1961, but their effects on siltation reduction had been gradually diminishing since the 1990s. Copyright © 2015 John Wiley & Sons, Ltd.  相似文献   

设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号