首页 | 本学科首页   官方微博 | 高级检索  
相似文献
 共查询到20条相似文献,搜索用时 93 毫秒
1.
张强  姜彤 《湖泊科学》2003,15(Z1):221-229
通过对长江三角洲地区埋藏古树、泥炭、以及海相贝壳测年资料以及地方志、历史文献当中关于研究区洪灾事件记录的搜集、整理,研究结果表明,由于长江三角洲地区地势低平这一地貌特点,使得海面变化对于研究区洪灾的发生有着重要的影响.在长江中下游地区,海面的上升是导致冰后期长江河谷泥沙加积的主要原因,随着海面的上升和河床的抬高,长江中下游的水位也随之上升,从而导致长江洪水期排泄不畅,加重了洪灾的影响,加上长江三角洲地势低平,使海面变化成为长江三角洲地区洪灾发生的一个重要影响因子.同时,海面上升对长江水流的顶托作用也是加剧洪灾危害的一个重要原因.本文对于未来研究区洪水发生的预测,加强海岸带地区自然灾害的预防工作,减少生命财产的损失,具有一定的理论与实践意义.  相似文献   

2.
The Yangtze River Delta region is characterized by high density of population and rapidly developing economy. There are low lying coastal plain and deltaic plain in this region. Thus, the study area could be highly vulnerable to accelerated sea level rise caused by global warming. This paper deals with the scenarios of the relative sea level rise in the early half period of the 21st century in the study area. The authors suggested that relative sea level would rise 25 50 cm by the year 2050 in the study area, of which the magnitude of relative sea level rise in the Yangtze River Delta would double the perspective worldwide average. The impacts of sea level rise include: (i) exacerbation of coastline recession in several sections and vertical erosion of tidal flat, and increase in length of eroding coastline; (ii) decrease in area of tidal flat and coastal wetland due to erosion and inundation; (iii) increase in frequency and intensity of storm surge, which would threaten the coastal protection works; (iv) reduction of drainage capacity due to backwater effect in the Lixiahe lowland and the eastern lowland of Taihu Lake region, and exacerbation of flood and waterlogging disasters; and (v) increase in salt water intrusion into the Yangtze Estuary. Comprehensive evaluation of sea level rise impacts shows that the Yangtze River Delta and eastern lowland of Taihu Lake region, especially Shanghai Municipality, belong in the district in the extreme risk category and the next is the northern bank of Hangzhou Bay, the third is the abandoned Yellow River delta, and the district at low risk includes the central part of north Jiangsu coastal plain and Lixiahe lowland.  相似文献   

3.
IINTRODUCTIONIntherecentdecadesfrequentflooddisasterscausedseriousdamagesandclaimedthousandsoflives,suchasthe1998floodintheYangtzeRiverandthe1996floodintheYellowRiver.The1998floodintheYangtzeandtheSonghuaRiversbroughtdirectlossesofmorethan$30billions.Lowdischargehighstageisthemaincharacterofthefloods.Forexample,thehighestfloodstagein1998wasI.sinhigheranddischargewas14000m3/slowerthanthosein1954atLuoshanStationoftheVangtzeRiver.Anewmodelisrequiredtobedevelopedforaccuratepredictionoffl…  相似文献   

4.
In this article,the shrinking of Dongting Lake and its progressively weakening connection with the Yangtze River and their impact on flooding before and after the implementation of the Three Gorges Project are analyzed.In recent decades,human activity combined with natural processes has altered the flow of the middle reach channel of the Yangtze River and interfered with its connection with Dongting Lake.This has resulted in progressively more frequent flooding in the area.This study uses hydrological data to analyze the annual maximum discharge and annual maximum stage development of the middle reach of the Yangtze River and Dongting Lake.In recent decades before the Three Gorges Project became operational in 2003,the annual maximum discharge and the maximum stage recorded in the middle reach of the river downstream of Dongting Lake had increased,a result of the weakening of the flood regulation function of Dongting Lake;the annual maximum stage at Luoshan station(downstream,close to the confluence of the Yangtze River and Dongting Lake) had risen by about 2.0 m during 1955-2005,(1.5 m attributed to annual maximum discharge and 0.5 m to river channel deposition).Observational data recorded after the Three Gorges Project was put into operation in 2003,it can be seen that deposition in the Dongting Lake has nearly ceased and the lake's connection with the Yangtze River is stable.It is evident that the flood regulation function of Dongting Lake will continue,and that during the lifetime of the Three Gorges Project,the flood situation in the middle reach of the Yangtze River and Dongting Lake will remain stable.  相似文献   

5.
The southeastern portion of the Yangtze River Estuary (or Yangtze Estuary) was considered to be the deposition center and the mudbank of the Yangtze River Delta.As the fluvial sediment supply began to decline in the 1980s and the reduction accelerated after the completion of the Three Gorge Dam in 2003,more fluvial sediment was trapped decreasing the suspended sediment concentration (SSC) environment in the river mouth area.Moreover,the accretion rate of the mudbank has slowed down in recent dec...  相似文献   

6.
The refill operation of Three Gorges Reservoir (TGR) in the end of flood season significantly alters the water level regimes in Poyang Lake by reducing Yangtze River flow discharge. This study aims to investigate the impact of TGR refill operation on water level probability distribution of the Poyang Lake. The multiple linear regression model was established to estimate the water level with catchment inflow and Yangtze River flow as explanatory variables. A probability distribution of water level was derived and the refill operation effects were quantified by comparing the water level distribution at Xingzi station in the Poyang Lake before and after TGR. It is revealed that Yangtze River flow, rather than the catchment inflow is the dominant factor affecting the water level of Poyang Lake during TGR refill operation period. Results also show that the water level distribution estimated by the derived distribution method can be accepted as a theoretical distribution and has a comparable accuracy as the directly fitted distribution method before TGR. The derived method can be adapted to the environment change, thus is well suited for estimating the water level distribution after TGR. It is observed that Xingzi water levels with different design frequencies have been reduced due to the TGR refill operation. The water level reductions induced by TGR refill operation are 1.28, 0.87, and 0.50 m corresponding with design frequencies of 50, 90 and 99 %, respectively. The results from this work would improve the understanding of the TGR effects on the downstream river–lake system and provide scientific evidences for formulating better scheme for water resources management in this region.  相似文献   

7.
Employing long‐range correlation, complexity features and clustering, this study investigated the influence of dam and lake‐river systems on the Yangtze River flow. The impact of the Gezhouba Dam and the lake systems on streamflow was evaluated by analysing daily streamflow records at the Cuntan, the Yichang and the Datong station. Results indicated no evident influence of the Gezhouba Dam on streamflow changes. Distinct differences in scaling behaviour, long‐range correlation and clustering of streamflow at the Datong station when compared with those at the Cuntan and Yichang stations undoubtedly showed the influence of water storage and the buffering effect of the lake systems between the Datong station and other two hydrological stations on streamflow in the lower Yangtze River basin. Decreased regularity, enhanced long‐range correlation and increased clustering of streamflow in the lower Yangtze River basin due to the effect of water storage of the lake systems were corroborated. Copyright © 2011 John Wiley & Sons, Ltd.  相似文献   

8.
[专稿]近年长江中下游径流节律变化、效应与修复对策   总被引:1,自引:0,他引:1  
周建军  张曼 《湖泊科学》2018,30(6):1471-1488
近十余年长江上游大量兴建大型水库,蓄水、调节和拦沙对中下游河川径流和泥沙产生了深刻影响.河川径流减少,径流季节提前,伏秋(特别是10月)流量显著降低、变差系数增大,97%严重干旱频率情景变成80%~85%.同时,宜昌和出海输沙量分别减少93%和70%,中下游河槽冲刷下降1~3 m,三峡蓄水后仅13年清水冲刷幅度和范围已超过三峡预期30年的冲刷上限,目前仍呈加速趋势.干流各站平均水位下降2~4 m,与此同时河道同流量洪水位反而升高.水库调节是水位降低的主要原因,河道冲刷更加剧水位降低,当前水位变化对防洪和生态都不利.汛后流量和干流水位提前降低使洞庭湖和鄱阳湖(两湖)提前干枯、松滋等"三口"入湖水量减少,伏秋高热季节两湖生态环境面貌发生了根本变化.汛后流量减少甚至显著增加长江大通十月流量小于15000 m3/s几率和上海长江水源受咸潮影响风险,10月咸潮入侵变成最严重时段必须引起高度重视.我们认为,径流和径流节律变化是当前长江生态环境最主要问题之一.建议以"水资源工程"重新定位上游大型工程、以"水资源优先"优化流域管理和切实回归既定三峡工程运行原则等统一调度和改善中下游水情;通过水库挖泥等措施修复长江物质通量,抑制中下游剧烈冲刷和稳定河流格局;加强中下游蓄滞洪区等防洪能力建设,为最大限度降低上游水库防洪和蓄水压力创造条件;主要通过改善上游水库调度维护两湖环境条件,"引清水入洞庭"和"增加供水设施建设"加强两湖适应能力.这是长江修复和保护重点.  相似文献   

9.
长江中下游湖泊的成因与演化   总被引:18,自引:6,他引:12  
长江中下游湖泊洼地的成因比较复杂,以构造沉降控制的湖泊洼地规模较大,也比较深,但在碚分湖泊洼地属支流河口洼地、扇缘洼地、河间洼地。湖泊水位受到长江干流水位位的制约。在冰期人低海面时期,长江干流下切,沿江湖泊多干涸;冰后期海面上升,长江干流自河口而上相继发生水位上升,加上降水的变化,导致沿江洼地逐渐蓄水为湖,长江中下游湖泊的演化趋势是不同程度地被泥沙充填,容积不断缩小并导致湖水位涨落年变幅增大与洪水  相似文献   

10.
Frequency calculation for extreme flood and methods used for its uncertainty estimation are popular subjects in hydrology research. In this study, uncertainties in extreme flood estimations of the upper Yangtze River were investigated using the Delta and profile likelihood function (PLF) methods, which were used to calculate confidence intervals of key parameters of the generalized extreme value distribution and quantiles of extreme floods. Datasets of annual maximum daily flood discharge (AMDFD) from six hydrological stations located in the main stream and tributaries of the upper Yangtze River were selected in this study. The results showed that AMDFD data from the six stations followed the Weibull distribution, which has a short tail and is bounded above with an upper bound. Of the six stations, the narrowest confidence interval can be detected in the Yichang station, and the widest interval was found in the Cuntan station. Results also show that the record length and the return period are two key factors affecting the confidence interval. The width of confidence intervals decreased with the increase of record length because more information was available, while the width increased with the increase of return period. In addition, the confidence intervals of design floods were similar for both methods in a short return period. However, there was a comparatively large difference between the two methods in a long return period, because the asymmetry of the PLF curve increases with an increase in the return period. This asymmetry of the PLF method is more proficient in reflecting the uncertainty of design flood, suggesting that PLF method is more suitable for uncertainty analysis in extreme flood estimations of the upper Yangtze River Basin.  相似文献   

11.
The Pitt River is a meandering river channel linking the Fraser River estuary and Pitt Lake. The lake acts as a temporary reservoir for tidally diverted Fraser River flow. Stage level can fluctuate 2 m in Pitt River and as much as 1.2 m in Pitt Lake on a tidal cycle. Stage data from three locations in the system, used in conjunction with velocity measurements (profiles and tethered meter), revealed large tidal and seasonal variations in discharge. Calculations indicate that during the flood, basal shear stress peaks earlier in the cycle and reaches higher values than during the ebb. Thus, sediment moves farther forward on a flood flow than it moves back on the succeeding ebb. An upstream movement of sediment in Pitt River from the Fraser River is indicated by: (1) the identical mineralogy of the two rivers, (2) a decrease in median grain size from the Fraser to Pitt Lake, and (3) a predominance of flood-oriented bedforms in the river channel. A delta, 12 km2 area, has accumulated at the lower (draining) end of the lake. Studies of the river channel using hydrographic charts revealed regular meanders (λM = 6100 m) and evenly spaced riffles and pools which appear to be scaled to the strongest flow, winter flood current (2400 m3/s). The winter flood is thus considered to be the effective discharge. Meander point bars are accreting on the ‘upstream’ side indicating deposition by the flood-oriented flow. The three dimensional geometry of the large-scale bedforms which cover the sandy thalweg of both river and delta channel was determined by echo sounding and side-scan sonar. Three distinct sizes (height/spacing = 0.8 m/10–15 m; 1.5 m/25–30m; 3m/50–60 m) of large-scale bedforms (sand waves) were found; their linear relationship of height vs. spacing on a log-log plot suggests a common genesis. Their occurrence by size does not appear to be related to depth of flow but rather to their position in the channel with respect to large scale features which alter flow.  相似文献   

12.
The Three Gorges Project(TGP) is a world known project to utilize and manage the water resources of the Yangtze River. The reservoir stores water at the end of the flood season, and replenishes downstream reaches with water in dry seasons. In addition to such benefits, the TGP has irreversibly changed the hydrological process and the river-lake relation of the middle and lower reaches. In this paper, a hydrodynamic model was established to quantify the impact of the TGP's operation on the water exchange between Dongting Lake and the Yangtze River during 2009-2013. The results indicated that:the operation of the TGP has considerably reduced the peak discharge and the flood volume of the main stream and the Dongting Lake area. The inflow volume from the Yangtze River to Dongting Lake via three outlets decreased by 1.9-3.5 billion m~3/yr, while the outflow volume from Dongting Lake to the Yangtze River at Chenglingji increased by 0.3-1.6 billion m~3 in September and 0.4-0.6 billion m~3 in October,respectively. This research provides valuable information for flood control, irrigation, and water allocation in the middle and lower reaches of the Yangtze River, and serves as a typical case for investigating the impact of other hydropower projects around the world.  相似文献   

13.
After operation of the Three Gorges Project(TGP), there is a new evolution tendency for rivers and lakes in the middle reaches of the Yangtze River(i.e. the Ching River reaches). In recent years, the weakening connection relationship between the Yangtze River and Dongting Lake has resulted in a series of problems for flood regulation, water resources utilization, and aquatic ecosystem protection in the river-lake joint area. In this paper, the hydrological characteristics and fluvial processes within the river-lake joint area are studied, and possible management strategies to maintain the connected river-lake relationship are proposed. To achieve this objective, the evolution tendency, such as the zero-flow problem and river regime for three major outlets(i.e. the Songzi Outlet, Taiping Outlet, and Ouchi Outlet) to Dongting Lake from the Yangtze River, is analyzed. It is believed that the Songzi Outlet has a comparative advantage in flow diversion over the other two outlets. The Range of Variability Approach is introduced to identify hydrological characteristics at the Songzi Outlet. Several characteristic values of flow diversion from this outlet during drought periods are determined. Then, the fluvial processes in the river-lake joint area are studied by comparing topographic maps and using control gauge station data of various years. The water and sediment flux are analyzed before and after operation of the TGP. Finally, based on the results obtained, two possible management strategies are recommended and corresponding parameters are estimated to strengthen and maintain the connected river-lake relationship. This analysis takes into account operation of the TGP, mainstream shift and increasing riverbed scour in the Ching River channel.To restore the flow diversion condition to that in the 1950 s or 1960 s(i.e. 140 m~3/s of flow diversion corresponding to 5500 m~3/s of flow at the Zhicheng station), it is estimated that the river channel around the Songzi Outlet should be dredged 1.4 m under the current riverbed situation, and other corresponding improvement measures for Songzi River channels should also be implemented.  相似文献   

14.
Based on field data of river discharge, tide, tidal bore, and riverbed topography, the characteristics of river discharge, the effect of river discharge on riverbed erosion and sedimentation, and the feedback effect of riverbed erosion and sedimentation on the tide and tidal bore in the Qiantang River are analyzed. The results show that the inter-annual and seasonal variation of river discharge in the Qiantang River is noticeable, while the seasonal distribution of river discharge tends to be un...  相似文献   

15.
In this paper, we analyse the behaviour of fine sediments in the hyper-turbid Lower Ems River, with focus on the river’s upper reaches, a stretch of about 25 km up-estuary of Terborg. Our analysis is based on long records of suspended particulate matter (SPM) from optical backscatter (OBS) measurements close to the bed at seven stations along the river, records of salinity and water level measurements at these stations, acoustic measurements on the vertical mud structure just up-estuary of Terborg and oxygen profiles in the lower 3 m of the water column close to Leerort and Terborg. Further, we use cross-sectionally averaged velocities computed with a calibrated numerical model. Distinction is made between four timescales, i.e. the semi-diurnal tidal timescale, the spring–neap tidal timescale, a timescale around an isolated peak in river flow (i.e. about 3 weeks) and a seasonal timescale. The data suggest that a pool of fluid/soft mud is present in these upper reaches, from up-estuary of Papenburg to a bit down-estuary of Terborg. Between Terborg and Gandersum, SPM values drop rapidly but remain high at a few gram per litre. The pool of fluid/soft mud is entrained/mobilized at the onset of flood, yielding SPM values of many tens gram per litre. This suspension is transported up-estuary with the flood. Around high water slack, part of the suspension settles, being remixed during ebb, while migrating down-estuary, but likely not much further than Terborg. Around low water slack, a large fraction of the sediment settles, reforming the pool of fluid mud. The rapid entrainment from the fluid mud layer after low water slack is only possible when the peak flood velocity exceeds a critical value of around 1 m/s, i.e. when the stratified water column seems to become internally supercritical. If the peak flood velocity does not reach this critical value, f.i. during neap tide, fluid mud is not entrained up to the OBS sensors. Thus, it is not classical tidal asymmetry, but the peak flood velocity itself which governs the hyper-turbid state in the Lower Ems River. The crucial role of river flow and river floods is in reducing these peak flood velocities. During elongated periods of high river flow, in e.g. wintertime, SPM concentrations reduce, and the soft mud deposits consolidate and possibly become locally armoured as well by sand washed in from the river. We have no observations that sediments are washed out of the hyper-turbid zone. Down-estuary of Terborg, where SPM values do not reach hyper-turbid conditions, the SPM dynamics are governed by classical tidal asymmetry and estuarine circulation. Hence, nowhere in the river, sediments are flushed from the upper reaches of the river into the Ems-Dollard estuary during high river flow events. However, exchange of sediment between river and estuary should occur because of tide-induced dispersion.  相似文献   

16.
1 Origin, process and method of the research Silt deposition created the fertile Dongting and Jianghan Plains of the middle Yangtze drainage, but has become a main cause of the deteriorating flooding along the middle Yangtze. The history of flood and waterlog of the Yangtze River in last century, esp. the disastrous 1998 flood, has proved that the key to the Yangtze flood control is its middle reach, especially the Jingjiang Segment. To study the silt deposition of the middle Yangtze and …  相似文献   

17.
SEDIMENT TRANSPORT IN TIIE YANGTZE RIVER ESTUARYSHEN Zhigang'ANSTa^CTThe hy~ntalc and the sedimen tranSport Patter'nS within the estUaIy of the YangtZe mver arecomPlex because of intemehon of fluvial and the hdal forCes, depending on freshwate discharge andhdal range. Based on the data measuIed in meent years, thes papo discusses the characterishcs of flowand sNnt movemen in the tw forer EstUaIy and their iIifluences on the evolution of theestuaryKey W: YangtZe mver…  相似文献   

18.
A tidal bore is a water discontinuity at the leading edge of a ood tide wave in estuaries with a large tidal range and funneling topography. New measurements were done in the Garonne River tidal bore on 14 15 November 2016, at a site previously investigated between 2010 and 2015. The data focused on long, continuous, high-frequency records of instantaneous velocity and suspended sediment con- centration (SSC) estimate for several hours during the late ebb, tidal bore passage and ood tide. The bore passage drastically modi ed the ow eld, with very intense turbulent and sediment mixing. This was evidenced with large and rapid uctuations of both velocity and Reynolds stress, as well as large SSCs during the ood tide. Granulometry data indicated larger grain sizes of suspended sediment in water samples compared to sediment bed material, with a broader distribution, shortly after the tidal bore. The tidal bore induced a sudden suspended sediment ux reversal and a large increase in suspended sedi- ment ux magnitude. The time-variations of turbulent velocity and suspended sediment properties indicated large uctuations throughout the entire data set. The ratio of integral time scales of SSC to velocity in the x-direction was on average TE,SSC/TE,x 0.16 during the late ebb tide, compared to TE,SSC/ TE,x 0.09 during the late ood tide. The results imply different time scales between turbulent velocities and suspended sediment concentrations.  相似文献   

19.
A three‐dimensional, time‐dependent hydrodynamic and salinity model was applied to the Danshuei River estuarine system and adjacent coastal sea in Taiwan. The model forcing functions consist of tidal elevations along the open boundary and freshwater flows from the main stem and tributaries in the Danshuei River system. The bottom roughness height was calibrated and verified with model simulation of barotropic flow, and the turbulent diffusivities were calibrated through comparison of time‐series of salinity distributions. The overall model verification was achieved with comparisons of residual current and salinity distribution. The model simulation results are in qualitative agreement with the available field data. The model was then used to investigate the tidal current, residual current, and salinity patterns under the low freshwater flow condition in the modelling domain. The results reveal that the extensive intrusion of saline water imposes a significant baroclinic forcing and induces a strong residual circulation in the estuary. The downriver net velocity in the upper layer increases seaward despite the enlargement of the river cross‐section in that direction. Strong residual circulation can be found near the Kuan‐Du station. This may be the result of the deep bathymetric features there. Copyright © 2007 John Wiley & Sons, Ltd.  相似文献   

20.
近40年来长江下游干流洪水位变化及原因初探   总被引:3,自引:0,他引:3  
黄兰心 《湖泊科学》1999,11(2):99-104
最近十年来,江苏境内长江下游干流汛期最高潮位连续偏高,持续时间亦明显偏长。造成防汛工作紧张,引起政府有关部门的重视,水利部门将治理长江作为重点工作。本文利用长江下游干流大通水文站和以下各潮位站的实测水位流量资料对1998年和1954年的特大洪水水情进行了对比,分析了从六十年代到九十年代长江下游平均洪水量,平均最高水位和平均最高潮位,超过防洪警厌水位的平均天数等的变化规律。  相似文献   

设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号