首页 | 本学科首页   官方微博 | 高级检索  
相似文献
 共查询到16条相似文献,搜索用时 125 毫秒
1.
马少坤  邵羽  吕虎  WONG K S  吴宏伟  陈欣  江杰 《岩土力学》2016,37(6):1563-1568
为解决地下水位随季节升降变化时隧道开挖对邻近桩基的长期影响难题,通过三维离心模型试验,研究了地下水位循环变化时隧道对群桩的长期影响。主要分析水位循环变化时地表长期沉降、桩顶长期附加沉降、桩身长期附加弯矩和附加轴力的变化规律。试验结果表明:在隧道附近,地下水位循环变化尤其是降水对地表长期沉降影响更为明显。地表长期附加沉降随着地下水位循环次数增加而增大,且呈衰减式变形,即使经过3次水位升降循环也不能稳定;桩基长期附加沉降显著,其附加沉降量占总沉降量的50%以上;前、后桩的长期附加轴力基本为正值,桩总轴力增加,对既有受压桩极为不利,附加轴力拐点位置及最大值有所区别;经过3次地下水位循环变化后,前、后桩桩身弯矩反弯点个数减少,但桩身最大附加弯矩均明显变大,当达到极限弯矩,桩身出现塑性铰,这对穿越厚软弱层地基中的既有受压柔性桩极为危险。  相似文献   

2.
隧道开挖对邻近单桩竖向受力特性影响   总被引:1,自引:0,他引:1  
熊巨华  王远  刘侃  孙庆 《岩土力学》2013,34(2):475-482
在分析隧道开挖对邻近单桩竖向受力特性影响时,基于荷载传递法和Winkler地基模型,利用两阶段分析法通过迭代求解给出隧道开挖与邻近单桩相互作用的弹塑性解答。通过与离心机试验的短期和长期试验结果的对比,分析了隧道开挖对邻近单桩的竖向影响,从而验证该方法的合理性和适用性。讨论了隧道开挖情况下隧道中心线距地表的距离、隧道中心线与桩轴线的距离、平均地层损失比、桩长、桩径、桩身强度6种因素对邻近单桩竖向受力特性的影响,提出隧道开挖对邻近单桩的竖向受力特性的影响规律。结果表明:随着隧道中心线距地表距离的增加,桩身沉降和桩身轴力先增大然后逐渐减小;随着隧道轴线与桩轴线距离的增加,桩身沉降逐渐减小,桩身轴力增大到一定值后逐渐减小;随着平均地层损失比的增加桩身沉降不断增大,桩身轴力逐渐增大到稳定值。  相似文献   

3.
王丽  郑刚 《岩土力学》2011,32(Z1):704-0712
利用有限元软件ABAQUS,采用对隧道洞室周边及开挖面的土体施加由盾构机引起的各种荷载的方法模拟天津市地铁1号线盾构施工。计算结果表明,有限元模型能够很好地模拟盾构施工过程。利用此模型研究隧道开挖对桩基础的影响。隧道开挖引起的桩顶沉降、桩身侧移主要发生在盾构机推进面逐渐接近桩的过程中,当盾构机推进面通过桩所在的位置后桩顶沉降、桩身侧移增加不明显;与隧道水平距离相同时,由于长桩能够充分发挥桩身下部的侧摩阻力,隧道开挖引起的长桩的桩顶沉降小于短桩的桩顶沉降;隧道开挖过程中12 m长桩的桩身发生了整体倾斜,16、19 m长桩的桩身出现了弯曲变形,16、19 m长桩的桩身最大弯矩发生在地面下12~13 m之间,即在隧道轴线附近;开挖过程中桩顶出现沿隧道推进方向的往复位移;桩顶作用的竖向荷载越大,由隧道开挖引起的桩顶沉降越大  相似文献   

4.
盾构隧道施工对邻近承载桩基影响研究   总被引:5,自引:0,他引:5  
朱逢斌  杨平  林水仙 《岩土力学》2010,31(12):3894-3900
针对苏州轻轨1号线成层非均质土地基,选用Mohr-Coulomb弹塑性本构模型,建立三维有限元数值模型,研究非均质土中盾构隧道施工对邻近承载桩基工作性状的影响规律。数值计算结果表明,随着成层非均质土中各土层软硬程度差异的增大,隧道开挖会在邻近承载单桩引起明显反弯点,且桩体沉降亦随之增大;位于上软下硬成层土中的承载单桩桩身正弯矩更大,且该正弯矩出现在桩身中上部的反弯点部位,而上硬下软成层土中的承载单桩下部出现更大的负弯矩;与均质土中同位置承载单桩相比,位于上软下硬成层土中承载单桩桩顶及桩端轴力均更大,而位于上硬下软成层土中承载单桩桩顶轴力则更小。不同竖向集中荷载作用下,非均质土中盾构隧道开挖引起的承载群桩中前桩水平位移沿桩身分布与同位置承载单桩重合,后桩挠曲程度小于承载单桩;盾构隧道施工对承载群桩内力的影响明显高于对变形的影响。  相似文献   

5.
郭一斌  张立明  郑刚  杨振丹 《岩土力学》2014,35(10):2941-2948
盾构近距离穿越大型立交桥超长桩基础会对桩基础及上部桥梁结构产生不利影响。通过对盾构近距离侧穿超长桩基础过程进行数值模拟,研究了不同深度处盾构掘进对超长桩承载性状、变形和内力的影响。研究表明:盾构近距侧穿超长桩会导致桩身出现较大变形及内力,且隧道轴线与超长桩处于不同相对位置时会对桩的特性产生不同影响。其他条件不变时,盾构从桩身上部的近距离穿越,将引起桩身最大的横向水平位移;盾构从桩身中部近距离穿越则将引起桩身产生沿盾构掘进方向的最大的水平位移;盾构从桩端附近穿越时将引起桩身产生最大的竖向位移;盾构从桩身中下部穿越时将引起桩身产生最大的附加轴力。桩身侧阻在隧道轴线附近呈“S”型,同时桩身轴力最大值也出现在隧道轴线附近。盾构导致桩身产生纵向和横向变形延伸至桥面高度的变形量相当可观。当盾构穿越高架桥梁基础时应该严格控制桩顶水平位移。  相似文献   

6.
《岩土力学》2017,(Z1):131-139
置换率是确定CFG桩复合地基的关键指标之一,根据土层分布明确桩长后针对目标附加荷载选择置换率是竖向结构体系决策的基础,目前缺少不同置换率复合地基力学性状附加荷载影响规律共同认知。通过进行2组相同附加荷载和加固深度、不同置换率的复合地基离心模型试验,研究复合地基桩身轴力、桩侧摩阻力、桩土应力比和地基沉降响应附加荷载的分布及变化规律。研究结果表明,因置换率的增大,(1)CFG桩所承受的轴力有所减小,且轴力最大值所在位置上移;(2)摩阻力零点位置和桩体上部负摩阻力最大值位置出现上移且后者变化速率加快,桩端最大正摩阻力值明显减小;(3)桩土应力比有所减小,且在深层土体中其沿深度方向的减小速率变小;(4)地基沉降和地表沉降明显减小,地表沉降与荷载呈线性关系变化,CFG复合地基的复合模量有所提高。  相似文献   

7.
靳军伟  杨敏  邓友生  刘晨晖 《岩土力学》2015,36(Z1):241-246
基于砂土中隧道开挖引起的土体竖向位移经验公式,分析隧道开挖对邻近桩基础的竖向影响。采用两阶段计算方法,将邻近桩基础视为竖向被动桩,依据砂土中隧道开挖引起地表及地表以下土体产生的沉降槽,考虑桩土相互作用的非线性,得到砂土中隧道开挖对邻近桩基础轴力影响的简化计算方法,并与土工离心试验结果进行对比,验证了该方法的合理性。在研究过程中,分析了隧道覆盖层厚度、隧道直径、隧道与桩之间的距离、隧道土体损失率、桩长、桩径等因素。研究结果表明,桩身轴力随着覆盖层厚度的增加而减小,随隧道直径和土体损失率的增大而增加;隧道与桩之间距离为2.5倍隧道直径时对轴力的影响最大;随着桩长、桩径的增加,桩身轴力逐渐增加。  相似文献   

8.
为研究运营盾构隧道附近基坑开挖对隧道管片受力的影响,针对基坑开挖引起旁侧盾构隧道围压变化的机制进行了分析,提出了一种能描述隧道受力-位移-再平衡过程的附加围压重分布模型,并推导出附加围压的计算公式。采用修正惯用法计算相应围压作用下的衬砌内力。根据实际工程做算例分析,研究基坑开挖对盾构隧道围压和内力的影响,并进行影响因素分析。分析结果表明:基坑开挖前隧道围压呈“钟形”分布;当基坑开挖后,隧道两侧的围压减小,基坑开挖侧的围压减小量更多;基坑开挖会使旁侧隧道正负弯矩值和正负剪力值增大,拱顶和拱底的轴力减小;随着基坑侧壁应力释放系数的增大,附加围压和附加弯矩的绝对值都会增加,而弯矩对基坑开挖卸载的响应更为明显;埋深较浅的盾构隧道对旁侧基坑开挖的影响更敏感,埋深较大的隧道,尤其是埋深大于基坑开挖深度的隧道,对旁侧基坑开挖影响的敏感度会明显降低;随着基坑与旁侧隧道净距的增加,基坑开挖对隧道的影响也会减小。  相似文献   

9.
为研究运营盾构隧道附近基坑开挖对隧道管片受力的影响,针对基坑开挖引起旁侧盾构隧道围压变化的机理进行了分析,提出了一种能描述隧道受力-位移-再平衡过程的附加围压重分布模型,并推导出附加围压的计算公式。采用修正惯用法计算相应围压作用下的衬砌内力。根据实际工程做算例分析,研究基坑开挖对盾构隧道围压和内力的影响,并进行影响因素分析。分析结果表明:基坑开挖前隧道围压呈“钟形”分布;当基坑开挖后,隧道两侧的围压减小,基坑开挖侧的围压减小量更多;基坑开挖会使旁侧隧道正负弯矩值和正负剪力值增大,拱顶和拱底的轴力减小;随着基坑侧壁应力释放系数的增大,附加围压和附加弯矩的绝对值都会增加,而弯矩对基坑开挖卸载的响应更为明显;埋深较浅的盾构隧道对旁侧基坑开挖的影响更敏感,埋深较大的隧道,尤其是埋深大于基坑开挖深度的隧道,对旁侧基坑开挖影响的敏感度会明显降低。随着基坑与旁侧隧道净距的增加,基坑开挖对隧道的影响也会减小。  相似文献   

10.
地铁隧道施工对邻近建筑物影响的研究   总被引:6,自引:0,他引:6  
姜忻良  贾勇  赵保建  王涛 《岩土力学》2008,29(11):3047-3053
以某框架结构办公楼为研究对象,将建筑物和开洞地基看作一个有机的整体,按照结构-土体-隧道共同作用进行分析。利用有限元软件ANSYS10.0建立三维非线性有限元模型,研究计算了盾构法地铁隧道穿越建筑物时对建筑物自身沉降和内力的影响。分析结果表明,建筑物基础的沉降主要发生在地铁隧道穿越建筑物的区间段内;建筑物的横向倾斜随着盾构的掘进逐渐增大,而其纵向倾斜量最大值则出现在开挖面在建筑物中线附近时;在盾构穿越建筑物的过程中柱子的等效应 力增幅可达20.1 %;相对于弯矩而言,建筑物构件的扭矩变化更为显著;当开挖面越过建筑物20 m时其变形和内力均趋于稳定。  相似文献   

11.
Three-dimensional (3D) finite element analyses have been performed to study the behaviour of a single pile and 3 × 3 and 5 × 5 pile groups during open face tunnelling in stiff clay. Several governing factors, such as tunnelling-induced ground and pile settlement, axial pile force changes and shear transfer mechanism at the pile–soil interface, have been studied in detail. Tunnelling resulted in the development of pile head settlement larger than the free-field soil surface settlement. In addition, axial force distributions along the pile change substantially due to changes in the shear transfer between the pile and the soil next to the pile, which triggers tunnelling-induced tensile forces in the piles with tunnel advancement. It was found that the relative displacements and the normal stresses at the pile–soil interface drastically affected shear transfer. The extent of slip length along a pile increased as the tunnelling proceeded. The apparent allowable pile capacity was reduced by up to approximately 42% due to the development of tunnelling-induced pile head settlement. Shear stress on the pile was increased for most of the pile depth with tunnel advancement, which was associated with changes in soil stresses and ground deformation, and hence, the axial pile force was gradually reduced with tunnel advancement, indicating the development of tunnelling-induced tensile pile force. The maximum tunnelling-induced tensile force on the pile was approximately 0.33Pa, where Pa is the allowable pile capacity applied to the pile head prior to tunnel excavation. The range affected by tunnelling in the longitudinal direction may be identified as approximately −2D  +(1.5–2.0D), where D is the tunnel diameter, from the pile centre (behind and ahead of the pile axis), in terms of pile settlement and axial pile force changes based on the analysis conditions assumed in the current study. Larger pile head settlements and smaller changes in axial pile forces were computed for piles that were part of groups. It has been found that the serviceability of piles experiencing adjacent tunnelling is more affected by pile settlement than by axial pile force changes, in particular for piles inside groups. The magnitude of the tunnelling-induced excess pore pressure was small and may not substantially affect pile behaviour.  相似文献   

12.
采用室内试验和数值分析相互验证方法,对单排挤扩桩和悬臂直桩基坑支护的桩顶位移和受力特征进行了研究,进而对基坑双排挤扩桩支护特性进行了分析。试验结果表明,与悬臂直桩相比,挤扩桩支护桩顶位移小,挤扩桩支盘提供的抗倾覆力矩有效地改善了挤扩桩的工作性状;与单排挤扩桩相比,双排挤扩桩基坑支护结构刚度大,在桩身内力分配以及控制基坑变形等方面有较大优势,是深基坑工程中经济合理的支护形式。  相似文献   

13.
祝廷尉  胡新丽  徐聪  雍睿 《岩土力学》2014,35(Z1):165-172
进行嵌岩桩与滑坡体相互作用的框架式滑坡物理模型试验,根据微型土压力盒和电阻应变计的监测数据,分别研究滑坡推力作用下模型桩的受力特征、桩身弯矩分布规律及模型变形破坏模式。试验结果表明,嵌岩桩加固后的滑坡,桩后推力随深度的增加呈抛物线型分布形式,合力作用点约在滑动面以上模型桩自由段的1/2处;嵌岩模型桩有明显的抗滑特性,承担了大部分桩后推力,传递至桩前土压力值较小且稳定;模型桩的桩身弯矩分布形式不同于普通抗滑桩弯矩分布形式,自由段埋深0~15 cm范围内为主要弯矩承受区域,最大弯矩截面位于滑面上模型桩自由段1/3处,滑动面处桩身弯矩绝对值较小;滑坡模型在沿滑面推力加载作用下发生桩后滑体越桩滑动破坏。该试验成果为嵌岩桩的抗滑特性研究提供了科学依据,可为该类型抗滑桩设计提供一定的指导性建议。  相似文献   

14.
Three-dimensional (3D) numerical analyses have been carried out to study the behaviour of a single pile to adjacent tunnelling in the lateral direction of the pile. The numerical analyses have included comparisons between the current study, previous elastic solutions and advanced 3D elasto-plastic analyses. In the numerical analyses, the interaction between the tunnel, the pile and the soil next to the pile has been analysed. The study includes the axial force distributions on the pile, the relative shear displacement between the pile and the soil, the shear stresses at the soil next to the pile and the pile settlement. In particular, the shear stress transfer mechanism along the pile related to tunnel advancement has been analysed by using interface elements allowing soil slip. It has been found that existing solutions may not accurately estimate the pile behaviour since several key issues are not included. Due to changes in the relative shear displacement between the pile and the soil next to the pile with tunnel advancement, the shear stresses and axial force distributions along the pile change drastically. Downward shear stress develops at the upper part of the pile, while upward shear stress is mobilised at the lower part of the pile, resulting in a compressive force on the pile. A maximum compressive force of about 0.25–0.52Pa was developed on the pile, solely due to tunnelling, depending on the pile tip locations relative to the tunnel position, where Pa is the service pile loading prior to tunnelling. The majority of the axial force on the pile developed within ±2D in the transverse direction (behind and ahead of piles) relative to the pile position, where D is the tunnel diameter. In addition, mobilisation of shear strength at the pile–soil interface was found to be a key factor governing pile–soil–tunnelling interaction. The reduction of apparent allowable pile capacity due to tunnelling was dependent on the pile location relative to the tunnel position. Some insights into the pile behaviour in tunnelling obtained from the numerical analyses will be reported and discussed.  相似文献   

15.
曹卫平  陆清元  樊文甫  李升 《岩土力学》2016,37(11):3048-3056
通过模型试验研究了竖向荷载作用下砂土中斜桩的荷载传递性状,分析了桩身倾角及长径比对斜桩桩身轴力、弯矩、剪力、桩侧摩阻力及端阻比的影响。试验结果表明:在桩顶竖向荷载作用下,斜桩桩身轴力均小于相应直桩桩身轴力,桩身倾角越大,轴力沿深度衰减得越快,桩长径比越大,轴力沿深度衰减得也越快;斜桩桩身最大弯矩随桩身倾角及长径比的增加而增加,最大弯矩出现的深度与桩身倾角无关,只与长径比相关;不论桩身倾角及长径比的大小,斜桩桩身最大剪力均出现在桩顶截面处,桩身最大剪力随着桩身倾角的增加而增大;桩身倾角越大,斜桩最大摩阻力越大,长径比越大,斜桩最大摩阻力越小,斜桩最大摩阻力出现在桩顶下1/4~1/5桩长处;斜桩端阻比随着桩顶竖向荷载的增加而增大,随着桩身倾角及长径比的增加而减小。  相似文献   

16.
邻近建筑物的暗挖隧道施工数值模拟   总被引:3,自引:0,他引:3  
魏纲  裘新谷  魏新江  丁智 《岩土力学》2009,30(2):547-552
软土中采用暗挖法开挖隧道往往会引起土体变形,由于城市中暗挖隧道多建在建筑物高度集中的地区,土体变形对邻近既有建筑物的损伤不容忽视。采用二维有限元方法对邻近中、低层建筑物(采用整体基础)工况下的暗挖隧道施工进行了模拟和分析,建筑物长15 m。研究结果表明:建筑物的存在会增大隧道开挖引起的地面沉降和衬砌的受力与变形,同时隧道开挖也会使邻近建筑物产生附加应力和变形。当隧道轴线与建筑物轴线的水平距离 0 m时,建筑物相对安全;当 时,建筑物会产生朝向隧道一侧的倾斜。当 为2.5~20 m时,产生较大的地面沉降,建筑物的首尾沉降差较大,建筑物较危险;当 为30~40 m时,建筑物的存在对隧道施工的影响较小;当 40 m时,建筑物的存在对隧道施工的影响可以忽略不计。由于基础的存在,建筑物的最大弯矩、轴力和剪力的变化量较小,增大量在10 %以内。  相似文献   

设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号