首页 | 本学科首页   官方微博 | 高级检索  
相似文献
 共查询到20条相似文献,搜索用时 62 毫秒
1.
A small-scale pile has been developed in the laboratory to investigate the thermo-mechanical behavior of energy piles subjected to a significant number of thermal cycles. The pile (20 mm external diameter), installed in dry sand, was initially loaded at its head to 0, 20, 40 and 60% of its ultimate bearing capacity (500 N). At the end of each loading step, 30 heating/cooling cycles were applied. The long-term behavior of the pile was observed in terms of head settlement, axial force profile, soil and pile temperature, and stress in soil. The results evidence the irreversible settlement of the pile head induced by thermal cycles under constant load head. In addition, the incremental irreversible settlement that accumulates after each thermal cycle decreases when the number of cycles increases. The evolution of irreversible pile head settlement versus number of cycles can be reasonably predicted by an asymptotic equation.  相似文献   

2.
Although the loads applied on piles are usually a combination of both vertical and lateral loads, very limited experimental research has been done on the response of pile groups subjected to combined loads. Due to pile–soil–pile interaction in pile groups, the response of a pile group may differ substantially from that of a single pile. This difference depends on soil state and pile spacing. This paper presents results of experiments designed to investigate pile interaction effects on the response of pile groups subjected to both axial and lateral loads. The experiments were load tests performed on model pile groups (2 × 2 pile groups) in calibration chamber sand samples. The model piles were driven into the sand samples prepared with different relative densities using a sand pluviator. The combined load tests were performed on the model pile groups subjected to different axial load levels, i.e., 0 (pure lateral loading), 25, 50, and 75% of the ultimate axial load capacity of the pile groups, defined as the load corresponding to a settlement of 10% of the model pile diameter. The combined load test results showed that the bending moment and lateral deflection at the head of the piles increased substantially for tests performed in the presence of axial loads, suggesting that the presence of axial loads on groups of piles driven in sand is detrimental to their lateral capacity.  相似文献   

3.
Dynamic experiments were carried out on instrumented model aluminium single piles embedded in clay of different consistencies to study its bending behaviour under lateral loads. Piles with different length to diameter ratios were used. Dynamic lateral load of different magnitudes ranging from 7 to 30 N at wide range of frequencies from 2 to 50 Hz were applied. The load transferred to the pile, pile head displacement and the strain variation along the pile length were measured using a dedicated data acquisition system. Static lateral load tests were also performed to investigate the magnification of dynamic response of piles in clay. It is found that the maximum bending moment due to dynamic load is magnified by about 1.5–4 times in comparison to the static load for short piles but about 9 times for long piles. Depth of fixity and effective pile length is also largely amplified under dynamic loads, thus indicating that a pile which behaves as a flexible pile under static load, may not exhibit flexible behaviour under dynamic load.  相似文献   

4.
In the present study, the end bearing capacity of screw and straight pipe pile under similar pile tip area and ground conditions were investigated. The effect of increasing overburden pressure was also considered in this research. Pile load tests on close-ended screw and straight pipe piles were conducted in the small scale. Dry Toyoura sand was used to develop the model ground. The sand was compacted at relative density of 70, 80 and 92 %. It was observed that in case of straight pipe pile, load settlement curve plunges downward without increase in load around settlement equals to 10 % of pile tip diameter, whereas in case of screw pile, the load settlement curve plunges around settlement equals to 15 % of pile tip diameter. Moreover, the screw piles having helix-to-shaft diameter ratio 2–4.1 showed 2–12 times higher end bearing capacity than straight pipe piles with similar pile shaft diameter. It was also observed from the test results that the end bearing capacity of single-helix screw pile was in average 16.25 % less than straight pipe pile with similar pile tip area and ground conditions irrespective of the effect of increasing overburden pressure.  相似文献   

5.
This paper presents a procedure to assess the mobilized pile side and tip resistance versus pile head and tip settlement under axial load in clay soil. The load transfer (tz) curve is evaluated at any point on the loaded pile based on the combined pile tip/side resistance–displacement mechanisms along the length of the pile. Unlike current methods that assume the pile settlements as a percentage of the pile/shaft diameter, the presented technique determines the side and tip resistance of the pile and the associated pile settlement under existing load based on the current stress/strain level in the surrounding soil up to failure (excessive settlement). The technique employs the concepts of the elastic theory and Ramberg–Osgood characterization of the stress–strain behavior of the clay soil. Case studies are also presented to exhibit the capabilities of the proposed procedure. The good agreement between measured and calculated load transfer curves along the pile and pile tip resistance versus pile head, side, and tip displacements shows the consistency of the proposed procedure. A computer code is developed to employ the presented technique.  相似文献   

6.
王成龙  刘汉龙  孔纲强  吴迪 《岩土力学》2016,37(Z1):317-322
目前针对工作荷载下温度循环对桩基承载力特性的研究相对较少,基于室内模型试验方法,对饱和砂土中工作荷载下桩体在多次冷热循环作用时的承载特性和传热特性进行研究,测得温度循环作用下桩体和桩周土体温度、桩周水平土压力、桩体应变以及桩顶位移随时间的变化规律。试验结果表明,施加温度循环作用后桩体及桩周土体温度变化不大,桩周水平土压力也能基本恢复到初值,但在桩体内部则会产生较少残余应变,桩顶下沉并随着循环次数的增加不断累积,从而影响结构的整体承载能力。  相似文献   

7.
在桩基负摩阻力的研究中桩土位移需重点关注。作为一种成熟的流场测试手段,颗粒图像测速(paticle image velocimetry, PIV)技术已逐步推广至岩土研究领域,将该技术运用至桩基负摩阻力模型试验,可以弥补传统位移测试方法无法获得位移场分布等缺点。基于试验特点,设计由钢板和有机玻璃壁组成的试验箱,采用千斤顶配合置于土表的载荷板实现对土体加载。试验中,对不同土表超载作用下的土体分层沉降、桩身沉降及轴力进行测定,采用PIV技术对桩端处砂土的位移场实施了采样分析。试验表明,PIV所测位移数值与传统方法测得值吻合较好,PIV分析结果能够直观反映桩基受负摩阻力作用而产生的附加沉降;并且可以判断桩端沉降的影响范围,深度方向基本不超过1.75D(D为直径),水平方向则基本在桩底边界范围内。最后,总结了PIV技术在模型试验中的运用,提出了几点在今后试验中可待改进的地方。  相似文献   

8.
马少坤  邵羽  吕虎  WONG K S  吴宏伟  陈欣  江杰 《岩土力学》2016,37(6):1563-1568
为解决地下水位随季节升降变化时隧道开挖对邻近桩基的长期影响难题,通过三维离心模型试验,研究了地下水位循环变化时隧道对群桩的长期影响。主要分析水位循环变化时地表长期沉降、桩顶长期附加沉降、桩身长期附加弯矩和附加轴力的变化规律。试验结果表明:在隧道附近,地下水位循环变化尤其是降水对地表长期沉降影响更为明显。地表长期附加沉降随着地下水位循环次数增加而增大,且呈衰减式变形,即使经过3次水位升降循环也不能稳定;桩基长期附加沉降显著,其附加沉降量占总沉降量的50%以上;前、后桩的长期附加轴力基本为正值,桩总轴力增加,对既有受压桩极为不利,附加轴力拐点位置及最大值有所区别;经过3次地下水位循环变化后,前、后桩桩身弯矩反弯点个数减少,但桩身最大附加弯矩均明显变大,当达到极限弯矩,桩身出现塑性铰,这对穿越厚软弱层地基中的既有受压柔性桩极为危险。  相似文献   

9.
Three-dimensional (3D) finite element analyses have been performed to study the behaviour of a single pile and 3 × 3 and 5 × 5 pile groups during open face tunnelling in stiff clay. Several governing factors, such as tunnelling-induced ground and pile settlement, axial pile force changes and shear transfer mechanism at the pile–soil interface, have been studied in detail. Tunnelling resulted in the development of pile head settlement larger than the free-field soil surface settlement. In addition, axial force distributions along the pile change substantially due to changes in the shear transfer between the pile and the soil next to the pile, which triggers tunnelling-induced tensile forces in the piles with tunnel advancement. It was found that the relative displacements and the normal stresses at the pile–soil interface drastically affected shear transfer. The extent of slip length along a pile increased as the tunnelling proceeded. The apparent allowable pile capacity was reduced by up to approximately 42% due to the development of tunnelling-induced pile head settlement. Shear stress on the pile was increased for most of the pile depth with tunnel advancement, which was associated with changes in soil stresses and ground deformation, and hence, the axial pile force was gradually reduced with tunnel advancement, indicating the development of tunnelling-induced tensile pile force. The maximum tunnelling-induced tensile force on the pile was approximately 0.33Pa, where Pa is the allowable pile capacity applied to the pile head prior to tunnel excavation. The range affected by tunnelling in the longitudinal direction may be identified as approximately −2D  +(1.5–2.0D), where D is the tunnel diameter, from the pile centre (behind and ahead of the pile axis), in terms of pile settlement and axial pile force changes based on the analysis conditions assumed in the current study. Larger pile head settlements and smaller changes in axial pile forces were computed for piles that were part of groups. It has been found that the serviceability of piles experiencing adjacent tunnelling is more affected by pile settlement than by axial pile force changes, in particular for piles inside groups. The magnitude of the tunnelling-induced excess pore pressure was small and may not substantially affect pile behaviour.  相似文献   

10.
提出一种多向荷载作用下层状地基中刚性桩筏基础的计算方法。基于剪切位移法,采用传递矩阵形式分析了竖向荷载下桩顶面-桩顶面相互作用;引入修正桩侧地基模量,采用有限差分法分析了水平荷载下桩顶面-桩顶面相互作用;基于层状弹性半空间理论,分析了多向荷载下桩顶面-土表面、土表面-桩顶面、土表面-土表面的相互作用关系。建立了桩土体系柔度矩阵,得到了多向荷载下层状地基中刚性桩筏基础的受力和变形的关系以及桩的内力和变形沿桩身分布规律。通过与有限元对比,验证了该方法的合理性和修正地基模量的优越性,并对多向荷载作用下的桩筏基础进行了计算分析,计算结果表明,水平力将会引起桩筏基础的倾斜。  相似文献   

11.
林智勇  戴自航 《岩土力学》2014,35(Z1):221-226
群桩中各基桩在地基土中的加筋与遮帘效应是客观存在的,然而,在目前的桩基沉降理论与实践中,相关的研究仍显不足。基于剪切变形法理论,考虑桩的加筋与遮帘效应,求得各基桩在自身桩顶荷载作用下产生的沉降以及其引起相邻桩的附加沉降量,由此提出群桩中任两桩的相互作用系数简化公式,同时,也得到各基桩桩侧及桩端桩-土接触等效弹簧刚度,并基于荷载传递法原理,建立了成层地基条件下各基桩在自身桩顶荷载作用下的桩身位移平衡方程,推导出各土层层顶处桩身沉降、轴力与层底处桩身沉降、轴力之间的递推关系,进而将公式推广到高、低承台群桩基础计算中。工程算例分析表明,用该方法计算有较高的精度,求得的荷载-沉降曲线及两桩相互作用系数与实测值吻合较好;相互作用系数要明显小于弹性理论计算结果。  相似文献   

12.
实际工程中桩基经常受到各种动荷载作用,如高铁路基中的加固桩长期承受列车行车时产生的循环动荷载作用,桩基在循环荷载作用下的承载特性研究对动荷载下的工程设计至关重要。X形桩是一种在传统圆形截面桩基础上发展而来的新型异性桩技术,其承载机制不同于传统圆形截面桩。为了深入研究X形桩在循环荷载作用下的动力特性和荷载与沉降规律,开展了砂土中X形桩竖向循环加载大比尺模型试验。试验结果表明,随着循环加载的进行,X形桩顶产生累计沉降,且循环荷载比越大,加载频率越高,桩顶沉降越快;循环加载初期,X形桩顶动刚度降低,桩身轴力响应增大,桩侧摩阻力发生弱化,之后逐渐趋于稳定,且桩身下半段侧摩阻力较大;在同等加载条件下X形桩与等截面圆形桩相比,承受动荷载能力较强,桩侧摩阻力较大,长期循环加载作用下产生的累计位移较小。研究结果可为X形桩在动荷载作用下的工程设计提供参考依据。  相似文献   

13.
The buckling behaviour of the 360 × 152 steel H-piles supporting the integral abutments of the Scotch Road Bridge, located in Trenton, New Jersey, has been studied for the cases of single pile and pile bent. Three-dimensional finite-element models for single pile and pile bent have been developed to study the behaviour of these fully embedded piles under axial and lateral loading. An iterative analysis based on extracting the eigenvalues and eigenvectors (mode shapes) that correspond to the pile(s) critical buckling loads has been adopted. The pile(s) and the surrounding sand were modelled using solid continuum elements in the finite-element model. Material non-linearity is accounted for in both the piles and the soil in the base state of the model. A parametric study has been utilized to determine the effect of the geometric and material properties of the pile and the surrounding sand on the predicted critical buckling loads of the piles. The effects of four parameters have been studied: soil stiffness, pile length, type of connection, and combining vertical and lateral loads. The results from the parametric study showed that the variation of the percentage change in the sand stiffness, pile length, and combining vertical and lateral loads with the critical buckling loads of the 360 × 152 H-piles is nonlinear. Furthermore, the parameters studied are more influential in affecting the critical buckling load of a single pile than a pile bent, with the exception of the ‘type of connection’ parameter.  相似文献   

14.
高喷插芯组合桩荷载传递机制足尺模型试验研究   总被引:10,自引:1,他引:9  
刘汉龙  任连伟  郑浩  肖耀祖 《岩土力学》2010,31(5):1395-1401
高喷插芯组合桩(简称JPP)是由高压旋喷桩和预应力混凝土芯桩构成的一种新型组合桩,为了对其荷载传递机制有更深入的认识,以自行开发的大型土工试验模型槽为依托,进行了JPP桩、灌注桩和高压旋喷水泥土桩静载荷对比试验。通过埋设在JPP桩中的监测仪器对桩身轴力、桩端阻力以及桩体沉降等进行了直接量测,进而分析了JPP桩中管桩与水泥土轴力的分布和内外侧摩阻力的分布。试验结果表明,JPP桩与同桩长、同桩经灌注桩相比承载力高30%以上;JPP桩变形由芯桩控制,管桩轴力分布与水泥土轴力分布规律不一致,但同一截面上管桩和水泥土的轴力比值约为其弹性模量的比值;内外摩阻沿桩身的分布规律类似,内摩阻是外摩阻的1.62倍左右,约为JPP桩直径和管桩直径的比值;桩侧摩阻力与桩土相对位移近似双曲线分布,桩端阻力和桩端位移也近似双曲线分布。  相似文献   

15.
混凝土芯水泥土搅拌桩的有限元研究   总被引:12,自引:4,他引:8  
董平  秦然  陈征宙 《岩土力学》2003,24(3):344-348
混凝土芯水泥土搅拌桩是适用于软土地基处理的一种新型复合桩 , 具有施工方便 、造价低廉 、单桩承载力高等优点 。 在静试验的基础上, 采用弹塑性有限元方法研究了该桩在竖向荷载下的力学性状 ,包括桩土和桩内外芯应力比 , 荷载的传递, 桩侧塑性区分布以及沉降特性等 。  相似文献   

16.
现浇X形混凝土桩竖向承载性状模型试验研究   总被引:1,自引:0,他引:1  
为研究现浇X形混凝土桩的荷载沉降特性及其荷载传递机制,利用河海大学的大型试验模型槽开展X形桩的足尺模型静载荷试验。通过在桩身设置的钢筋测力计及在桩底埋设的土压力盒,实测了在竖向荷载作用下X形桩与土相互作用时的工作性状。试验结果表明:X形桩的荷载沉降曲线为缓变型;桩侧摩阻力与桩端阻力随桩顶沉降的增加均呈递增性;但随着桩顶荷载的增加,桩侧摩阻力分担桩顶荷载比例却呈递减性,其分担桩顶荷载比例由初期的约90%下降到极限状态时的70%左右,而桩端阻力分担桩顶荷载的比例呈递增性,其分担桩顶荷载比例由初期的约10%上升到极限状态时30%左右。研究成果可为今后竖向受荷X形桩的设计与研究提供重要参考。  相似文献   

17.
群桩沉降简化计算方法   总被引:2,自引:0,他引:2  
张乾青  张忠苗 《岩土力学》2012,33(2):382-388
将均质土和成层土中的单桩桩顶沉降分成桩端力引起的沉降、桩身压缩和桩侧阻力引起的沉降3部分分别计算,获得单桩沉降后,运用等代墩法可获得群桩的平均沉降。单桩沉降计算方法可考虑桩端力与桩端位移的非线性关系和桩侧阻力引起沉降的非线性特性,同时计算方法可考虑桩身压缩对桩顶沉降的贡献。算例分析表明,计算值与实测值和其他方法的计算值有较好的一致性,验证了该方法的合理性。  相似文献   

18.
An analysis of axially and torsionally loaded piles is presented in which the pile is treated as an elastic bar supported on two series of interacting non-linear axial and torsional springs. The characteristics of these springs depend on the soil properties and the diameter of the pile as well as on the interaction between the axial and torsional response. Predicted pile responses are compared to the results of model tests conducted on piles installed in a soft clay bed and loaded with combined axial and torsional loads. Both experimental results and theoretical predictions show that a torque applied to the pile head affects significantly the settlement and the axial bearing capacity of the pile.  相似文献   

19.
With a rigid pile assumption, the equivalent top–down load–settlement curve constructed from the results of a bidirectional or bottom–up pile load test does not fully consider the total elastic shortening when all the load components from skin-friction and end-bearing are applied downward at the pile head. In effect, the equivalent curve constructed by the original method suggested from the Osterberg test showed a much stiffer curve compared to the top–down curve. Design charts are provided in this paper from the results of a parametric study on bored piles in order to approximately evaluate the λ-factor that is used to estimate the top–down pile shortening from the bottom–up shortening due to the skin-friction component of the load. It has been shown that the λ-factor varies with the distribution of the undrained shear strength profile, pile slenderness ratio, and mobilization of the skin-friction resistance. In addition, the pile shortening due to the end-bearing load component is added to the top settlements by treating the pile as an elastic column. A modified method for the construction of the equivalent top–down load–settlement curve is presented that considers the elastic pile shortening and validated with the measured top–down load–settlement curve from pile load tests.  相似文献   

20.
费康  戴迪  洪伟 《岩土力学》2019,40(1):70-80
基于荷载传递法,建立了热力耦合作用下能量桩单桩工作特性的简化分析方法。该方法中将桩-土荷载传递函数取为双曲线,采用曼辛法则模拟温度循环过程中桩-土界面的卸载和再加载特性,通过再加载过程中刚度的折减近似考虑塑性变形的积累。利用矩阵位移法求解控制方程组后可直接得到任意温度-力学组合作用下的桩体变形、桩身轴力、桩侧阻力和桩端阻力,无需事先假设温度位移零点的位置。通过与试验数据的对比分析,验证了所提方法的可靠性。结合算例,研究了能量桩的长期工作特性。结果表明,温度循环会造成自由桩的桩顶沉降增加,固定桩的桩顶应力减小,温度循环的影响与桩顶静力荷载水平和土体刚度的衰减程度密切相关。  相似文献   

设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号