以西安地铁6号线区间隧道浅埋暗挖施工穿越地裂缝场地为研究工程背景,考虑地裂缝场地的特殊性构建了基于传统CRD工法的施工优化工法,并对传统CRD工法和优化CRD工法施工开挖过程进行了三维动态的有限元数值模拟,结合现场监测试验数据,对比分析了两种工法下地裂缝场地地表沉降变形规律和地铁隧道受力变形特征。结果表明:两种CRD工法下地表沉降变形均呈反S型,大致可分为开挖前微小变形、开挖时急剧下沉变形及开挖后平稳变形等3个阶段;与掌子面距离越近,地面沉降速率越大;与传统CRD工法相比,优化CRD工法通过适当增加锁脚、锁腰锚杆数量,提高初支喷混强度,达到简化临时支护、扩大下台阶施工面、方便临时支护施作拆除和提升初支闭合、临时中隔壁拆除速度的目的,整体施工速度提升1.37倍,地表最大沉降量降低52.96%,影响范围减少22.17%,隧道拱顶最大沉降量降低54.53%;优化CRD工法具有施工速度快、影响范围小以及地表与结构沉降控制好等优点,不仅可以提高工程效益,而且可以保障施工安全性和隧道建成使用的可靠性。研究结果可为西安市及其他地裂缝发育区地裂缝场地地铁隧道暗挖施工提供科学参考和借鉴。  相似文献   

2.
地裂缝是西安市最典型的地质灾害之一,地裂缝地段地铁隧道施工引起地层及地表沉降是较为突出的工程地质和岩土工程问题。文章以西安地铁六号线浅埋暗挖隧道穿过f8地裂缝为工程背景,基于有限元数值模拟,对地裂缝地段交叉中隔墙法(CRD工法)暗挖施工引起的地表沉降和隧道变形进行了分析。结果表明:暗挖施工引起的地表沉降随开挖进尺呈反S型曲线变化特征,地裂缝带上盘的开挖进尺影响范围大于下盘;隧道中心线地表沉降在地裂缝带出现错台且靠近上盘5 m处出现集中沉降区;地裂缝地段隧道暗挖施工对地表的影响区范围约为80 m即上盘约45 m、下盘约35 m,在此范围应考虑暗挖施工对附近地表建(构)筑物的影响;开挖过程中地裂缝带上盘沉降过程变长且大于下盘;地表横向变形曲线符合高斯分布,上盘沉降大于下盘,在上盘靠近地裂缝位置处地表沉降槽宽度、沉降量明显增大;距地裂缝带5 m处上盘拱顶出现最大沉降,其值为25 mm,而在地裂缝位置处拱底出现27 mm的隆起变形,拱顶和拱底变形在地裂缝带附近出现错台;地裂缝带隧道暗挖施工对拱顶、拱底影响区范围分别为50 m和55 m,靠近上盘地裂缝位置附近隧道暗挖施工衬砌应及时支护,防止土体塌落与隧道变形。研究结果可为西安地铁隧道穿越地裂缝带暗挖施工提供科学依据和技术指导。  相似文献   

3.
以西安地铁一号线朝阳门站一康复路站区段饱和软黄土地铁隧道为研究对象,通过施工期现场地表沉降变形监测,分析了在饱和软黄土特殊地层条件下隧道浅埋暗挖法施工引起的该区段地表沉降变形规律以及地表沉降槽分布特征。结果表明:在饱和软黄土隧道开挖时,随着掌子面的推进,隧道顶地表沉降可分为沉降微小阶段、沉降显著发展阶段、沉降缓慢阶段和沉降稳定阶段;单线隧道开挖后的最大地表沉降量为18.89mm,双线隧道开挖后的最大地表沉降量为36.4mm;已开挖隧道对围岩土体的扰动作用使得后开挖隧道的地表沉降发展较大;双线隧道的地表沉降槽宽度接近单线隧道沉降槽宽度的2倍,因此可以将其近似为单线隧道地表沉降槽宽度与双线隧道轴线中点距离之和;单线隧道开挖后地表沉降槽宽度为8.4~9.3m,双线隧道开挖后地表沉降槽宽度为16.2~17.5m;隧道开挖施工的沉降槽宽度参数为0.435~0.467,单线隧道开挖后的地层损失率为0.765%~1.324%,双线隧道开挖后的地层损失率为1.231%~2.200%。  相似文献   

4.
城市地铁隧道开挖引起过大的地表沉降会对隧道工程本身及地表建筑物造成危害。有效预计并合理控制隧道开挖引起的地表沉降具有重要的实践意义。以武汉地铁虎名区间隧道开挖工程为背景,运用有限元数值模拟软件MIDAS/GTS建立隧道断面开挖的数值模型,计算隧道开挖引起的地表沉降量,与实测沉降量进行拟合; 根据隧道开挖过程中对应地表及临近建筑物的实际情况,优化开挖断面围岩预处理方案,建立优化后的断面开挖模型。模拟结果表明,优化后地表沉降仍在安全范围内,可以为类似工程沉降控制提供参考。  相似文献   

5.
HTSS以大连地铁2号线香沙区间盾构隧道下穿铁路桥特殊地段为依托,通过三维有限元程序仿真模拟以及工程现场动态监测,研究盾构施工法对周围地层变形的影响和盾构下穿铁路桥造成的沉降特征。结果表明:盾构开挖引起的地表沉降经历了5个阶段,即初期扰动沉降、开挖面前部沉降、盾构机正上方沉降、盾构通过沉降、后期固结沉降;地表沉降整体为一个凹槽形,即隧道中心线地表沉降大,隧道两边沉降较小,按隧道横截面轴线左右对称,符合地表沉降机理,并与现场监测数据一致;距离开挖隧道越近,总体沉降位移越大,盾构开挖小于20 m时,其沉降位移沿着横向与纵向都有扩展,隧道开挖至40 m时,沉降位移主要沿着纵向扩展,横向扩展不明显;不同深度的上部土体沉降呈漏斗形,即隧道正上方沉降最大,两边沉降递减,沉降曲线基本对称,地表右侧受右线隧道开挖影响,沉降量略大于左侧;桥桩底端处于隧道拱顶上,且整个桩身处于破裂面之上,属于短桩范畴,桥桩变形主要以受土体作用而产生的竖向沉降变形为主。  相似文献   

6.
半硬半软岩层小净距隧道洞口段监测分析   总被引:4,自引:0,他引:4  
针对雷公浦小净距隧道后行左洞洞口段具有半硬岩层半软岩层的特点,在开挖过程中,按照新奥法对隧道地表沉降、拱顶下沉、水平收敛、中间岩柱的位移、锚杆轴力、围岩压力和钢拱架应力等项目进行监测。监测结果表明,采用预留核心土法可以较好地控制围岩变形和应力;后行洞的拱顶沉降大于先行洞,且软岩一侧的下沉量更大;中间岩柱较薄弱,开挖初期往先行洞方向移动;降雨对围岩变形和压力影响较大,施工中应引起重视。研究结论可为类似条件下工程的设计、施工和监测提供借鉴。  相似文献   

7.
汪振伟  付钢 《岩土力学》2009,30(Z2):418-421
地表沉降的研究工作大都集中在地铁隧道盾构法施工的情况,而对于矿山法城市双连拱隧道施工引起地表沉降的研究几乎没有。本文以重庆彭家花园双连拱隧道为工程背景,就矿山法双连拱隧道施工引起的地表变形进行研究。在不同施工方法条件下,针对不同埋深、断面大小进行回归分析,从理论上弄清地表沉降的规律,根据实测资料,提出矿山法施工条件下地表沉降的预测公式。并结合三维数值模拟验证了回归效果  相似文献   

8.
双线平行盾构隧道施工引起的三维土体变形研究   总被引:4,自引:0,他引:4  
魏纲  庞思远 《岩土力学》2014,35(9):2562-2568
基于双线水平平行盾构施工中土体损失引起的土体变形二维解析解,建立土体变形三维解析解。取不同的纵向位置作为变量,建立土体损失率沿纵向的变化方程;考虑先行隧道施工对后行隧道的影响,分别计算两条盾构隧道施工引起的土体变形,叠加得到双线平行盾构施工引起的土体总变形。其方法能够计算土体深层沉降和水平位移,较精确地反映土体三维变形。算例分析结果表明:预测值与实测值较为吻合;土体沉降随着离开挖面距离的增加而不断增大,最终在x = -40 m左右时趋于稳定;随着先行隧道与后行隧道开挖距离的接近,最大土体总沉降量逐渐增大;土体沉降会随着深度z的增大而略微增加,但沉降槽宽度将略微减小;随着两条隧道轴线水平距离L的增大,最大土体沉降逐渐减小,沉降曲线形状慢慢由V型转变成W型,不再符合正态分布规律。  相似文献   

9.
地铁双隧道施工引起地表沉降及变形的随机预测方法   总被引:3,自引:1,他引:2  
刘大刚  陶德敬  王明年 《岩土力学》2008,29(12):3422-3426
地铁施工引起地表沉降及变形的预测和控制是一个有待于深入研究的重要课题。地铁区间隧道大多为近距离的双孔平行隧道,两隧道开挖引起的地表沉降及变形往往相互叠加,导致沉降及变形预测更加困难。以随机介质理论为基础,对预测公式进行了改进,实现了双孔平行隧道施工引起的地表沉降、水平位移、水平变形、倾斜、曲率预测,研发了城市隧道开挖引起的地表沉降及变形预测系统。对多处双孔平行隧道工程进行了理论预测与验证,实测沉降证明了理论方法与预测系统的科学性和有效性。  相似文献   

10.
《岩土力学》2017,(Z1):123-130
基于室内盾构模拟试验,研究管隧垂直、斜交和平行工况下盾构开挖对管线变形的影响。以合肥在建地铁为工程背景,主要对管线的沉降、变形和相对转角等规律进行模拟试验研究。研究结果表明,二次扰动更容易使土体产生沉降,对土体中的地下管线的位移影响更大;隧道在开挖过程中沿隧道轴向的管线变形与沿隧道环向的影响范围不同,隧道开挖对地下管线产生的环向变形影响大于轴向变形影响;隧道开挖使管线下方土压力发生变化,中间段管线下方产生荷载临空区域,土压力逐渐减小,两边缘端产生附加应力逐渐增大。研究成果可为盾构施工对地下管线变形影响的预测提供相应的控制破坏依据。  相似文献   

11.
王芳  贺少辉  刘军  曹瑞琅 《岩土力学》2012,33(Z2):289-296
在盾构隧道基础上结合浅埋暗挖法可以有效地解决地铁车站和盾构隧道施工之间的矛盾。北京地铁14号线试验段采用外径为10 m的土压平衡盾构修建,试验段上的车站结合PBA法(洞桩法)扩挖而成。综合运用预测地表沉降的经验公式、相关统计资料和规范,以及数值模拟方法,对大断面盾构隧道结合洞桩法修建地铁车站的施工过程进行地表沉降分析。结合北京地铁车站地表沉降控制基准值和现有地铁车站地表沉降统计数据,提出较为合理的地表沉降控制标准,并按照三级控制的管理方法,分级分步进行地表沉降控制,研究结果对指导工程施工有一定的参考价值。  相似文献   

12.
Increasing demand on infrastructures has led to increased attention to shallow soft ground tunneling methods in urbanized areas. Especially in metro tunnel excavations, it is important to control the surface settlements which are observed before and after excavation, which may cause damage to surface structures. Unlike motorway, sewage and other infrastructure tunnels, metro tunnels generally have to be excavated as twin tunnels and must have a larger diameter. Metro tunnels also have shallow depth. Due to their shallow depth, metro tunnels generally have been constructed in weak rocks or weak soils in cities. The construction of twin tunnels will generate ground movements which have the potential to cause damage to existing surface and subsurface structures. To solve this settlement problem, experts have used the Earth pressure balance machine (EPBM) and the slurry balance machine. In such excavations, especially in twin tunnels, the main challenges for constructers are estimating the maximum surface settlement, controlling the interaction of transverse surface settlement and shaping the settlement curve. Incorrect estimation of these parameters can lead to significant problems above the tunnels and in nearby structures. This paper focuses on surface settlement measurements, on the interaction of twin tunnel transverse surface settlement and on the relationship between shield parameters and transverse surface settlement for parallel tunnels using EPBM shields in clay and sand soils in shallow depth. Also, a new equation is proposed for estimating the transverse settlement curve of twin tunnels. The results from this proposed equation are compared with the results of field observations. The transverse settlement curve values obtained from the proposed equation have good agreement with the actual results for the Otogar–Kirazli metro case studies.  相似文献   

13.
Increasing demands on infrastructures increases the attention on shallow soft ground tunneling methods in urbanized areas. Especially, in metro tunnel excavations, it is important to control the surface settlements observed before and after excavation, which may cause damage to surface structures. To solve this problem, earth pressure balance machines (EPBMs) have widely been used throughout the world. This study focuses on surface settlement measurements, the interaction of twin tunnel surface settlement, and the relationship between shield parameters and surface settlement for parallel tunnels using EPBM shields in clay and sand soils. In this study, the tunnels were excavated using two EPBMs. The tunnels were 6.5 m in diameter, as twin tubes with a 14 m distance from center to center. The EPBM in the first tube followed about 100 m behind the other tube. Segmental lining with 1.4 m of length was employed as a final support. The results from this study showed that (1) the most important parameters for the maximum surface settlements are the face pressure and backfill; (2) in twin tunnel excavation with EPBM for longitudinal profile, the settlement rate reached its peak value when the shield came to the monitoring section and this peak value continued until the shield passed the monitoring section; (3) every shield affected the other tunnel’s longitudinal surface settlement profile by approximately 35–36.8 %; (4) S A, S B and S C values were found to be 38.0, 35.8 and 26.2 %, respectively for an EPBM, and (5) ensuring good construction quality is a very effective way to control face stability and minimize surface settlement.  相似文献   

14.
李兆平  刘军  李名淦 《岩土力学》2007,28(6):1156-1160
针对北京地区地质条件,提出了在区间盾构隧道之间采用矿山法构筑渡线隧道的方案,即先在最大开挖断面处拆除管片,沿横向扩挖出一条施工通道;然后在施工横通道侧壁开口,从大断面向小断面进行渡线隧道的断面渐变段、双联拱段和分离单洞的施工,从而在两条区间盾构隧道之间采用矿山法完成渡线隧道的施工;最后,应用FLAC数值计算软件,探讨了管片拆除及隧道断面扩挖引起的地表沉降和塑性区分布范围。研究结果表明,针对北京地区的地质条件,提出的在区间盾构隧道之间采用矿山法构筑渡线隧道的方案具有工程适用性。  相似文献   

15.
李朋  徐海清  李振伟 《岩土力学》2011,32(Z1):761-0765
紧邻多孔交叠隧道是随着地铁建设的不断深入发展而出现的一种复杂的隧道空间分布形式。依托武汉地铁2号线和4号线工程,针对4孔紧邻交叠隧道,采用三维有限元方法分析了隧道动态施工过程引起的地表变形规律以及后建隧道对已建隧道受力与变形的影响。计算结果表明:隧道埋深对地表变形影响显著;紧邻4孔交叠隧道施工引起的地表最终变形达到了32 mm,超出了规范的限值;隧道埋深越大,引起的地表变形越小,但影响的范围越大;紧邻4孔交叠隧道施工时的影响范围为:前方约为30 m、后方约25 m、单侧约30 m;隧道的变形主要表现为上下压扁,两拱腰外扩,变成倒鸭蛋形;隧道的变形主要发生在盾构机刀盘通过前后约1D的范围内,随后很快趋于稳定;隧道结构的沉降主要取决于隧道自身以及其上部的垂直隧道的施工,邻近隧道的施工主要影响已建隧道的侧向变形;后建隧道将少量增加已建隧道管片内的内力。研究成果可为武汉地铁建设以及国内今后类似工程的设计与施工提供参考和指导  相似文献   