排序方式: 共有73条查询结果,搜索用时 15 毫秒
31.
32.
33.
Abdi-Dehkordi Mehri Bozorg-Haddad Omid Salavitabar Abdolrahim Mohammad-Azari Sahar Goharian Erfan 《Natural Hazards》2021,108(3):2543-2567
Natural Hazards - Decreasing flood damages in a basin and achieving sustainable development reveal the necessity of integrated management of flood. Integrated flood management requires the... 相似文献
34.
In the modeling of urban storm water runoff temperatures, the contribution of rooftops to the heating of rainfall runoff is usually neglected or not mentioned in the literature. In this paper we examine the accuracy of this assumption (a) by analyzing temperature data that we recorded on a residential rooftop, a commercial rooftop, and a concrete driveway, and (b) by simulating temperature profiles within rooftops and pavements, and estimating heat transfer amounts from these surfaces to rainfall runoff (‘heat export’). Analysis of both wet‐ and dry‐weather temperature data recorded in the Minneapolis/St. Paul metropolitan area (north‐central USA) over periods of several months leads to the conclusion that (a) a concrete driveway has a far greater capacity for heat storage and release than a shingled residential rooftop, and (b) an insulated commercial rooftop is able to store and release more heat than the residential rooftop. Unexpectedly, the rainfall events with the highest dew point (rainfall) and surface temperatures often occurred during late night or early morning hours, and not during daylight hours. The analysis of three rainfall events showed that the heat export from the commercial rooftop was roughly three times that of the residential rooftop, but only 30%–90% of the heat export from a concrete driveway. Maximum (potential) heat export was significantly higher for the driveway than for either rooftop. In conclusion, the results of the data analysis and heat export simulations support the assumption that residential rooftops contribute very little heating to runoff from rainfall, while commercial rooftops may have a thermal impact on rainfall runoff because of their greater thermal storage capacity. Commercial rooftops, in addition to asphalt and concrete pavements, should be considered when estimating water temperature of rainfall runoff from urbanized areas and the associated impact on the thermal regime of streams and fish habitat. Copyright © 2011 John Wiley & Sons, Ltd. 相似文献
35.
Omid Saeidi Vamegh Rasouli Rashid Geranmayeh Vaneghi Raoof Gholami Seyed Rahman Torabi 《地学前缘(英文版)》2014,5(2):215-225
A modified failure criterion is proposed to determine the strength of transversely isotropic rocks. Me-chanical properties of some metamorphic and sedimentary rocks including gneiss, slate, marble, schist, shale, sandstone and limestone, which show transversely isotropic behavior, were taken into consider-ation. Afterward, introduced triaxial rock strength criterion was modified for transversely isotropic rocks. Through modification process an index was obtained that can be considered as a strength reduction parameter due to rock strength anisotropy. Comparison of the parameter with previous anisotropy in-dexes in literature showed reasonable results for the studied rock samples. The modified criterion was compared to modified Hoek-Brown and Ramamurthy criteria for different transversely isotropic rocks. It can be concluded that the modified failure criterion proposed in this study can be used for predicting the strength of transversely isotropic rocks. 相似文献
36.
Amir Barzegari Nasser Madani Esfahani Omid Asghari 《Arabian Journal of Geosciences》2014,7(8):2991-3010
Geostatistical simulations have been recently widely used in the geological and mining investigations. Variogram, the fundamental tools of geostatistics, can identify the spatial distribution of the regionalized variable within the area. One of the important issues of geostatistical simulation in seismotectonics is producing uncertainty maps, which could be applicable to predict earthquake parameters through the site locations especially for civil structures like bridges. It can help engineers to design the structure of interest better. Earthquake parameters as for example seismic fault and surface wave magnitude (Ms) have significant impact on the feasibility study of the civil structures. In this research, a method is presented to produce uncertainty maps for seismic fault and surface wave magnitude, Ms. For this aim, information related to surface wave magnitude and fault trace in Zagros region (SW of Iran) has been collected. Then, the relationships between them through the site location have been investigated and analyzed by conditional geostatistical simulation. In order to quantify the uncertainty of each parameter, the uncertainty formula after generating the E-type maps has been provided and discussed. Finally, in “Talgah Bridge” site, these uncertainty maps were produced to interpret the impact of the surface wave magnitude and fault trace in this specific civil structure. 相似文献
37.
38.
Omid Saeidi Seyed Rahman Torabi Mohammad Ataei 《Geotechnical and Geological Engineering》2013,31(5):1477-1495
Knowledge of drillability of rock masses in engineering projects is very important in determining drilling costs. In drilling operations, so many parameters such as the properties of rock and the drilling equipment affect the drilling performance. In this study, after discussing the rock mass drillability process and identifying all the effective parameters, interaction matrixes based on the rock engineering systems, that analyze the interrelationship between the parameters affecting rock engineering activities, is introduced to study the rock mass drillability tribosystem. Given that interaction matrix codes are not unique numbers, and then possible interactive intensities are calculated for each matrix and a group decision-making method, Fuzzy–Delphi–AHP technique has been used to obtain appropriate weights. As a result, rock mass drillability index (RMDI) is presented to classify the rock mass drillability. The results indicate the ability of this method to analyze rock mass drillability procedure. Drilling data along with laboratory rock properties from Sungun copper mine were collected and were ranked according to the new classification system. Fifteen zones at the mine site were ranked based upon the new index RMDI and a reasonable correlation was obtained between measured drilling rate at the zones and RMDI data. 相似文献
39.
Alireza Rahmati Mir Abbas Jalali 《Monthly notices of the Royal Astronomical Society》2009,393(4):1459-1466
We use the weighted integral form of spherical Bessel functions and introduce a new analytical set of complete and biorthogonal potential–density basis functions. The potential and density functions of the new set have finite central values and they fall off, respectively, similar to r −(1+ l ) and r −(4+ l ) at large radii, where l is the latitudinal quantum number of spherical harmonics. The lowest order term associated with l = 0 is the perfect sphere of de Zeeuw. Our basis functions are intrinsically suitable for the modelling of three-dimensional, soft-centred stellar systems and they complement the basis sets of Clutton-Brock, Hernquist & Ostriker and Zhao. We test the performance of our functions by expanding the density and potential profiles of some spherical and oblate galaxy models. 相似文献
40.
In this study, we tracked and analyzed the reconstruction process in Bam, Iran, after the city was struck by an earthquake with a M w of 6.6 on December 26, 2003. We adopted three approaches to comprehensively assess the city’s post-earthquake reconstruction and to shed light on the progress and sustainability of disaster recovery projects. We applied the following methodology. First, we obtained official statistics and reports that included quantitative and qualitative evaluations of the reconstruction process to evaluate the overall outcome of the government’s reconstruction projects. Second, we examined photographs taken during field surveys conducted in 2004, 2007, and 2014 to assess changes within the city. Last, we analyzed three satellite images of Bam—the first taken 3 months before the earthquake, the second immediately after the earthquake, and the third 8 years after the earthquake—to assess the progress of reconstruction work and changes in land cover and land use. The results indicated that considerable progress had been made in reconstructing some of the damaged areas. However, progress was relatively slow in severely damaged areas. 相似文献