New radio and X-ray data are reported for the rich cluster Abell 2319. This object is known from optical data to consist of two separate clusters, which are displaced by about 10′ in the NW direction, and could be in a pre-merger state.
In the radio domain, the cluster is characterized by the presence of a central diffuse halo source, more extended and powerful than the prototype halo in the Coma cluster. The radio halo shows an irregular structure, elongated in the NE-SW direction, and also extended towards the NW. We also report data on the extended radio galaxies located within the halo, or in its proximity.
The cluster X-ray brightness distribution shows an elongated structure towards the NW, in the radial region between 6′–12′, i.e. in the direction of the subcluster. This feature is exactly coincident with the NW extension of the radio halo. In addition, more substructural features are identified which could be due to an ongoing merger of the cluster with yet another mass component.
The radio halo morphology is correlated with the X-ray structure and the existence of merger processes in the cluster. The cluster merger can provide energy to maintain the radio halo, while the origin of the relativistic particles seems more problematic. 相似文献
In view of the situation of excavation of open coal mine for the underground water disaster,we should carry out simulation studies for the numerical value of the water lowering project and improve the accuracy and the level of the water lowering project.On the basis of the hydrological geological conditions of certain open mine digging,a more reasonable seepage numerical model was built according to MODFLOW.It was simulated in advance that the process of the confined water level descending with the time,and combining with the actual observations to test the correctness of the model.The calculation showed that the results coincided well with the results of actual measurement.Based on this,different water lowering numerical simulations were built for the open coal mine digging.It could be simulated and forecast that the changes of the groundwater level in drainage process within and outside the mine pit,and it was quantitatively assessed that the possible water lowering result of the opencast water drainage process,which provide an important basis for the actual water lowering project and the possible project disposal. 相似文献