首页 | 本学科首页   官方微博 | 高级检索  
文章检索
  按 检索   检索词:      
出版年份:   被引次数:   他引次数: 提示:输入*表示无穷大
  收费全文   4篇
  免费   1篇
地球物理   2篇
地质学   2篇
自然地理   1篇
  2024年   1篇
  2015年   1篇
  2011年   1篇
  2009年   1篇
  2006年   1篇
排序方式: 共有5条查询结果,搜索用时 15 毫秒
1
1.
任贵良  杨爱春  YANG Ai-chun 《云南地质》2011,30(2):164-166,163
探采井岩性、产状、岩体破碎程度、构造条件、岩溶发育均利于地下水储存和运移,具有较好的承压条件。水井正好穿越岩溶管道,形成了自喷井(水量1 328m3)。解决2万余人的饮水,缓解旱情,取得了显著社会、经济效益。  相似文献   
2.
The excitation of structural components and liquid contents of surface impoundments by seismic waves can generate turbulence that is large enough to overtop the bounding berms. In cases in which the liquids are wastes from industrial/municipal operations, their release from impoundments can pose significant risks to the environment. In this analysis, the freeboard magnitudes that can accommodate liquid head levels in impoundments are determined through linkage of configuration of waves in the liquid surface to incident seismic wave characteristics, liquid characteristics and impoundment design. For an impoundment site in a region of ground acceleration levels ranging from 0.2 to 1.0 g and impacted by seismic shear wave velocity of 180 m/s, freeboard requirements are in the range of 0.004–2.0 m on soft soil; 0.008–0.7 m on medium-dense soil; and 0.002–0.1 m for dense soil. For the same impoundment design, ground acceleration and incident wave characteristics, freeboard requirements are directly proportional to the depth of the soil mantle over bedrock. The impoundment slope, which is a key parameter with regards to liquid holding volumetric capacity of the impoundment, is a less significant parameter than depth to bedrock with regard to the size of the required freeboard. This implies that siting of an impoundment should be considered to be critical to impoundment performance in seismic zones.  相似文献   
3.
根据2008年9月至2013年10月金沙江下游水库地震台网监测资料,分析了蓄水期间水库地震影响区的地震活动和震源机制。向家坝水库蓄水1年多,蓄水后库首区A、B段的地震活动频次和强度都维持在较低水平。蓄水期间地震活动显著增加,集中分布在库区C段,并不是蓄水初期地震活动就增加,与库区2013年6月启动第二阶段蓄水有一定相关性,强度在3级地震活动水平。增加的地震活动位于近南北走向的翼子坝、玛瑙断裂的中段。这些局部地段蓄水后发生的地震,其震源的力学机制多为倾滑或正断型,分析认为部分地震为水库诱发岩溶或塌陷型地震,多数仍属构造地震。本文结果为水库诱发地震的研究提供了资料和震例。  相似文献   
4.
Although dam removal has been increasingly used as an option in dam management, and as a river restoration tool, few studies provide detailed quantitative assessment of the geomorphological response of rivers to dam removal. In this study, we document the response of the Pine River, Michigan, to the gradual removal of Stronach Dam. In 1996, prior to the initiation of removal, 31 permanent cross-sectional transects were established in the 10-km study area. These transects were surveyed annually during the course of the removal (1996–2003) and for the three years following removal (2004–2006). Dam removal resulted in progressive headcutting of sediments in the former impoundment, extending upstream 3.89 km of the dam. Over the course of the 10 years since dam removal was initiated, a net total of 92 000 m3 of sediment erosion occurred. The majority of sediments stored in the former reservoir remained in place, with only 12% of the estimated reservoir sediment fill being eroded. Approximately 14% of the net erosion was deposited within the stream channel 1 km downstream of the dam location, with the remainder being transported further downstream or deposited in the floodplain. Sediment fill incision resulted in a narrower and deeper channel upstream, with higher mean water velocity and somewhat coarser substrates. Downstream deposition resulted in a wider and shallower channel, with little change in substrate size composition. Counter-intuitively, water velocity also increased downstream because of the increased slope that developed. Prior to removal, bedforms in the former impoundment were dominated by runs but are showing signs of restoration toward reference conditions. Continuing changes in river geomorphology are evident even three years following removal and are likely to occur for years to come.  相似文献   
5.
针对当前的水库提前蓄水调度研究尚未考虑碳减排问题,本文基于水库碳排放和有机碳埋藏因子法,构建了考虑碳减排的水库提前蓄水调度模型,采用基于熵权重的逼近理想解排序法(TOPSIS)对提前蓄水调度方案进行了多目标评价,以优选调度方案,在三峡水库开展了实例研究。研究结果表明:三峡水库从9月1日起蓄,于9月30日逐步蓄至167 m的调度方案最优,相较于原设计方案,在不增加防洪风险的前提下,多年平均发电量增加29.91亿kW·h(8.80%),弃水量减少26.03亿m3(27.51%),碳排放量减少69.26亿g(3.94%),有机碳埋藏量增加1.93亿g(1.28%),温室气体的CO2碳当量减少235.48亿g(3.85%),提前蓄水方案可显著提升三峡水库发电量、供水保障能力和减少碳排放量。本研究为水库提前蓄水的水碳协同调度提供了技术支撑。  相似文献   
1
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号