首页 | 本学科首页   官方微博 | 高级检索  
文章检索
  按 检索   检索词:      
出版年份:   被引次数:   他引次数: 提示:输入*表示无穷大
  收费全文   11篇
  免费   0篇
地球物理   2篇
地质学   6篇
天文学   2篇
自然地理   1篇
  2021年   1篇
  2019年   1篇
  2017年   1篇
  2016年   1篇
  2015年   1篇
  2014年   2篇
  2009年   1篇
  2006年   2篇
  2001年   1篇
排序方式: 共有11条查询结果,搜索用时 250 毫秒
1.
2.
A complex filament composed by a main body a polar filament and a tail—a small filament situated between active regions, was observed between 6 and 14 January 2001. A decaying active region plays the role of attractor for this filament. We have studied the dynamics of the filament which disappeared in a spectacular CME, produced after a helical up-awarded movement of plasma in the filaments loops.  相似文献   
3.
The Advanced Liquid-mirror Probe of Asteroids, Cosmology and Astrophysics (ALPACA) is a proposed 8-m liquid-mirror telescope surveying  ∼1000 deg2  of the Southern hemisphere sky. It will be a remarkably simple and inexpensive telescope that none the less will deliver a powerful sample of optical data for studying dark energy. The bulk of the cosmological data consist of nightly, high signal-to-noise ratio, multiband light curves of Type Ia supernovae (SNe Ia). At the end of the 3-yr run, ALPACA is expected to collect  ≳100 000  SNe Ia up to   z ∼ 1  . This will allow us to reduce present systematic uncertainties affecting the standard-candle relation. The survey will also provide several other data sets such as the detection of baryon acoustic oscillations in the matter power spectrum and shear weak-lensing measurements. In this preliminary analysis, we forecast constraints on dark energy parameters from SNe Ia and baryon acoustic oscillations. The combination of these two data sets will provide competitive constraints on the dark energy parameters under minimal prior assumptions. Further studies are needed to address the accuracy of weak-lensing measurements.  相似文献   
4.
5.
The purpose of this research was to evaluate the production rate (PR) and cutting performance of surface miners (SM) based on rock properties and specific energy (SE). We use data from equipment manufacturers and experimental data in this study and propose a new method and equations to determine both the PR and the cutting speed of SM. The unconfined compressive strength (UCS) of the rock, its abrasivity, and the machine’s engine power are the three most important factors influencing the PR. Moreover, the cutting depth, UCS, and engine power have a significant impact on the cutting speed. We propose a new method and equations to determine the energy required to cut a volume unit and a surface unit, i.e., specific energy, and establish the relationship between SE, UCS, and PR. The results of this study can be used by surface miner operators to evaluate the applicability of the machines to a specific mine site.  相似文献   
6.
7.
8.
The use of tunnel boring machines (TBMs) is increasingly popular in tunnelling. One of the most important aspects in the use of these machines is to assess with certain accuracy the effectiveness of the action of the discs on the cutter-head in the different rock types to be excavated. A specific machine, called an intermediate linear cutting machine (ILCM), has been developed at the Politecnico di Torino in order to study, on a reduced scale in detail in the laboratory, the interaction between the discs of the TBM and the rock: this machine allows a series of grooves to be cut on a rock sample of 0.5 × 0.3 × 0.2 m, through the rolling of a 6.5-in. disc, and evaluation, during testing, of the parameters associated with the action of the cutting tool. The parameters measured during the tests were compared with the results obtained employing two analytical methods widely used for predicting the performance of TBMs: the Colorado School of Mines (CSM) model and the Norwegian University of Science and Technology (NTNU) model. The latter showed a greater ability to reproduce tests conducted using the ILCM. However, as with the CSM model, it does not allow the optimal excavation condition (the ratio, which minimizes the specific energy of excavation, between the groove spacing and the penetration of the disc), necessary for the correct design of the TBM cutter-head, to be identified. An example, based on a real case of a tunnel in Northern Italy, allowed a demonstration of how the NTNU model provides results in line with the measurements taken during the excavation and represents, therefore, a model that is able to reliably simulate both laboratory tests and the action of a TBM on site. The NTNU model, together with the results of the tests with ILCM targeted on the identification of the optimal conditions of excavation, may allow the correct dimensioning of the TBM cutter-head to be attained in order to effectively implement the excavation.  相似文献   
9.
10.
Cardu  M.  Rispoli  A.  Iabichino  G.  Oreste  P.  Vagnon  F. 《Geotechnical and Geological Engineering》2021,39(5):3573-3597

The intermediate linear cutting machine (ILCM) is a machine designed to work on an intermediate scale between the full- and the small-scale. The reduced scale involves several advantages compared to full-scale tests, especially in terms of sample supplying and transportation. On the other hand, it has an impact on the testing conditions, resulting in a limitation of the cutting penetration and spacing during the test, as well as in a smaller disc cutter. This affects most of the results, which cannot be directly used for the on-site machine performance prediction. However, some experimental results provided in the literature show that the optimal spacing/penetration ratio is not significantly affected by the changes involved. On this basis, the results obtained from ILCM tests should provide reliable information about the optimal cutting conditions of a tunnel boring machine in massive rock mass. The work performed included the development of some improvements of the testing rig, as well as a modified ILCM testing procedure, according to the one typically used in standard LCM tests. The results provide information about the attitude of the tested lithotypes to mechanical excavation by means of disc tools, including the optimal cutting conditions. Additional work was developed in terms of detailed characterisation of the rock samples involved and assessment of the size distribution of the debris produced during the ILCM tests. Nevertheless, further tests are necessary, in order to assess the consistency of the experimental procedure employed and to investigate the scale effect.

  相似文献   
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号