松辽盆地大陆科钻二开段大井眼钻井液技术
引用本文:郑文龙.松辽盆地大陆科钻二开段大井眼钻井液技术[J].地质与勘探,2016,52(5):931-936.
作者姓名:郑文龙
作者单位:1. 中国地质大学(武汉)工程学院,湖北武汉 430074;岩土钻掘与防护教育部工程研究中心,湖北武汉430074;2. 中国地质科学院勘探技术研究所,河北廊坊,065000
基金项目:地质调查项目“松辽盆地资源与环境深部钻探示范”(编号:12120113017600)资助
摘    要:CCSD-SK2井是一口钻穿松辽盆地白垩纪陆相沉积地层的中国大陆科学钻探井。二开段先以216mm口径钻至2806.20m,然后进行444.5mm口径扩孔。泥页岩地层大井眼钻进过程中粘土矿物含量高且易造浆,砂砾岩层渗透性强易粘卡,井壁稳定控制与钻屑携带难度大。选用了钾铵聚合物钻井液体系和聚磺钻井液体系,通过正交实验确定了钻井液配方。将钻井液控制在合适的密度、较低的失水量以及较强的封堵性,有效实现了井壁稳定;保持适当的环空返速、较高的动塑比以及定期打稠塞举砂等措施,有效实现了井眼净化。1086.45m~1147.56m与1182.74m~1256.01m井段累计收获岩心130.90m,取心率达到97.41%,平均机械钻速为0.84m/h;最终顺利钻至2806.20m。

关 键 词:松辽盆地  科学钻探  大井眼  钻井液  井壁稳定  携岩
收稿时间:2016/7/20 0:00:00
修稿时间:2016/8/25 0:00:00

Drilling fluid technology applied in a large hole of the second spudding of the scientific drilling wellproject in the Songliao basin
Zheng Wen-long.Drilling fluid technology applied in a large hole of the second spudding of the scientific drilling wellproject in the Songliao basin[J].Geology and Prospecting,2016,52(5):931-936.
Authors:Zheng Wen-long
Institution:Faculty of Engineering, China University of Geosciences, Wuhan, Hubei; Engineering Research of Rock-Soil Drilling and Excavation Protection, Ministry of Education, Wuhan, Hubei; Institute of Exploration Technology, Langfang, Hebei
Abstract:The well CCSD-SK2 is the main borehole of the China Scientific Drilling Project in the Songliao basin which is designed to penetrate Cretaceous strata. The second section of this well was drilled to 2806.20m with 216mm diameter, and then the diameter of the hole was expanded to 444.5mm. During drilling, high-content of clay can result in mud in the shale formation and sticking often occurs when drilling to sandy conglomerate with strong permeability. Besides, borehole stability and cutting transportation are difficult to be controlled. To solve these problems, a polymer drilling fluid system and polysulfonate drilling fluid system were employed. The drilling fluid formulation was confirmed through an orthogonal test. Measures were taken to ensure borehole stability, such as maintaining proper density, controlling low fluid loss and strong plugging capacity. Hole cleaning and stability were realized by maintaining a proper annular velocity and high dynamic-plastic ratio. Cores of 130.90m were recovered in the interval of 1086.45m~1147.56m and 1182.74m~1256.01m, respectively, and the core recovery is nearly 97.41%. Finally, the second section of this well was drilled down to 2806.20m as designed successfully.
Keywords:Songliao basin  scientific drilling well  large hole  drilling fluid  borehole stability  cutting transportation