Geo-feasibility of in situ sediment capping in a Great Lakes urban estuary: a sediment budget assessment
Authors:Anthony M Foyle  Kevin P Norton
Institution:(1) School of Science, Penn State Erie – The Behrend College, Station Road, Erie, PA 16563, USA;(2) Institute for Mineralogy, University of Hannover, Hannover, Germany
Abstract:Presque Isle Bay is one of 40 remaining environmental areas of concern (AoCs) on the North American Great Lakes that have one or more water, habitat, or sediment quality impairments as defined by the International Joint Commission. In situ natural capping using sediment from to-be-remediated watersheds and other potential sources is being considered as the most feasible means of remediating an existing contaminated sediment problem at this site. A multi-decade (∼40 year) sediment budget shows that, when localized anthropogenic effects (dredging, reclamation) are discounted, the bay net-accumulated sediment over time. Sediment was supplied from three major sources: bank erosion and bluff retreat (41%), streams (25%), and the Lake Erie littoral system (20%). The non-stream sources supply environmentally clean materials from ancient beach and glacio-lacustrine deposits along the shoreline, and from the modern littoral system. Organic and metallic contaminants supplied primarily by streams and run-off remain a remediation challenge for the AoC. Geologically, natural capping of contaminants over the next several decades is a viable solution for most of the bay. The mechanism may not work effectively in all areas because approximately 25% of the bay floor is moderately net-erosional while several localized areas accumulate sediments very slowly at decadal timescales.
Keywords:Sediment budget  Remediation  Presque Isle  USA
本文献已被 SpringerLink 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号