Successful Use of an Innovative Horizontal/Vertical Well Couplet in Fractured Bedrock to Intercept a Mobile Gasoline Plume |
| |
Authors: | Dana Carlisle David A Cook James A Miller |
| |
Abstract: | The horizontal directional drilling (HDD) technology was successfully used in a fracture-controlled sandstone matrix to intercept a gasoline plume and create a 150-foot-long hydrodynamic barrier preventing seepage of gasoline and contaminated ground water into a salmon-bearing stream within a public park. A 36-foot-deep vertical recovery well (VW) intercepts the central low point of the 420-foot-long HDD borehole to pump recovered fluids. Contaminant seepage into the creek ceased within hours of starting up the HDD/VW interceptor system in August 1999. Approximately 325 gallons of gasoline and 2 million gallons of contaminated ground water have been recovered to date. |
| |