首页 | 本学科首页   官方微博 | 高级检索  
     检索      

岷县、漳县6.6级地震的预测过程回顾
引用本文:杨国栋,张博,姜佳佳,李春燕.岷县、漳县6.6级地震的预测过程回顾[J].西北地震学报,2013,35(4):848-850.
作者姓名:杨国栋  张博  姜佳佳  李春燕
作者单位:甘肃省地震局;;甘肃省地震局;;甘肃省地震局;;甘肃省地震局;
摘    要:After the Ms6.6 earthquake occurred in the border region between Min and Zhang counties of Gansu Province on July 22, 2013, we preliminarily estimated the earthquake sequence to be a main shock-aftershock type based on the history of moderate-strong earthquake sequences in this area. As time went on, there were more aftershock events. These could be used for further analysis, and then for further decision on the earthquake sequence type. Finally, we determined the Ms6.6 earthquake sequence that occurred in the border region between Min and Zhang counties, Gansu Province as having been a main shock-aftershock type, with the largest Ms5.6 aftershock having occurred on the same day as the main Ms6.6 shock, from a comprehensive analysis of the historical characteristics of moderatety strong earthquakes of the earthquake zone, and the space-time evolution characteristics and parameters of the earthquake sequence. These provided a correct basis for anti- earthquake relief work and played an important role in mitigating the earthquake disaster and stabilizing the disturbed soci- ety after the earthquake in the earthquake zone and its neighboring areas. Reviewing the forecasting process and the re- sults, we found that we had successfully predicted the Ms6.6 earthquake that occurred in the border region between Min and Zhang counties on July 22, 2013 several years before it occurred. The magnitude and location of the earthquake had been predicted accurately, and the accuracy of the prediction was much higher than any other example in Chinese earth- quake prediction history. Forecasting on a monthly scale, we had indicated at the monthly meeting on earthquake prediction at the end of February, 2013 that there would be a risk of a moderately strong earthquake in Gansu Province from the change in moderately strong earthquake activity on the Chinese mainland. Even for short and impending earthquake prediction from several days to several dozens of days, we had proposed the likelihood of a moderate-strong earthquake happening in Gansu Province and the adjacent areas from the results of previous studies and the cases of earthquakes with MI ≥ 4.0 from the time before the Ms6.6 earthquake occurred. In a meeting about earthquake prediction held several days before the occurrence of the Ms6.6 event, we made the prediction that there would be an earthquake of M≥ 5.0 happening somewhere in Gansu Province and the surrounding area within dozens of days. The fact we had successfully predicted the Ms6.6 earth-quake on a several-year scale, as well as over a short time period to some extent, reinforces our belief that earthquakes can be forecast. Even with our present level of understanding, we can still capture some information on the gestation and occurrence of earthquakes before the arrival of a disaster. However, in order to achieve the goal of earthquake prediction in China, earthquake scientists still need to make arduous efforts. As long as earthquake scientists use the correct approach, and government supplies the necessary manpower and material resources to predict earthquakes, we believe that there will be a hope to achieve the aim of earthquake prediction with a relief effect. It is promising that we have achieved at least one or two earthquake forecasts.

点击此处可从《西北地震学报》浏览原始摘要信息
点击此处可从《西北地震学报》下载免费的PDF全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号