首页 | 本学科首页   官方微博 | 高级检索  
     检索      

青藏铁路清水河段片石护坡路堤温度特性研究
引用本文:魏静,许兆义,李成,包黎明,葛建军.青藏铁路清水河段片石护坡路堤温度特性研究[J].岩土力学,2006,27(5):773-777.
作者姓名:魏静  许兆义  李成  包黎明  葛建军
作者单位:1. 北京交通大学,土建学院,北京,100044;铁道第一勘察设计院,西安,710043
2. 北京交通大学,土建学院,北京,100044
3. 铁道第一勘察设计院,西安,710043
基金项目:铁道部科技研究项目;铁一院科技开发项目
摘    要:通过对青藏铁路清水河试验段片石护坡、无片石护坡的冻土路堤和地基的温度进行的全面监测,对比分析了路堤体内及基底的地温、积温及温度场中最大融化深度的变化情况,结果表明,采用片石护坡措施的试验路堤,与对比段(普通路堤)相比,降温效果明显。负积温量值大于对比段,最大融化深度抬升幅度较大。因此,片石护坡能够有效发挥降低地温、保护多年冻土的作用,并有利于坡面防护,是一种施作方便,既能用于新建,又能用于补强的多年冻土主动保护措施。

关 键 词:青藏铁路  片石  地温  积温  最大融化深度
文章编号:1000-7598-(2006)05-0773-05
收稿时间:2004-12-24
修稿时间:2004-12-242005-07-23

Temperature feature analysis for embankment with riprap slope protection in Qingshuihe test section of Qinghai-Tibet Railway
WEI Jing,XU Zhao-yi,LI Cheng,BAO Li-ming,GE Jian-jun.Temperature feature analysis for embankment with riprap slope protection in Qingshuihe test section of Qinghai-Tibet Railway[J].Rock and Soil Mechanics,2006,27(5):773-777.
Authors:WEI Jing  XU Zhao-yi  LI Cheng  BAO Li-ming  GE Jian-jun
Institution:1.School of Civil Engineering and Architecture, Beijing Jiaotong University, Beijing 100044, China; 2.First Railway Survey and Design Institute, Xi’an 710043, China
Abstract:Based on the overall temperature monitoring for frozen soil embankment with riprap slope protection and without riprap slope protection in Qingshuihe test section of Qinghai-Tibet Railway, the ground temperature, accumulated temperature and the maximum thawing depth variation in temperature field of these two kinds of embankments were analyzed. It is shown that the experimental embankment with riprap protection has better effect for its decreasing temperature, lowering minus accumulated temperature and lifting maximum thawing depth than that of the embankment without engineering measures. Therefore, the riprap slope protection embankment, as a positive frozen soil protection measure for its effectively decreasing ground temperature and being advantageous for slope surface protection, could be conveniently Used not only for construction, but also for the future maintenance.
Keywords:Qinghai-Tibet Railway  riprap  ground temperature  accumulated temperature  the maximum thawing depth
本文献已被 CNKI 维普 万方数据 等数据库收录!
点击此处可从《岩土力学》浏览原始摘要信息
点击此处可从《岩土力学》下载免费的PDF全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号