首页 | 本学科首页   官方微博 | 高级检索  
     检索      


An Assembly Coastal Building Technique in Port Engineering
Authors:CHEN Yu-min a  b  LIU Han-long a  b CHEN Ze c  GAO Yu-feng a  baResearch Academy of Hohai University  Nanjing  China bKey Laboratory of Ministry of Education for Geomechanics  Embankment Engineering  Hohai University  ChinacTongTu Technology  LtdCo  Beijing  China
Institution:[1]Research Academy of Hohai University, Nanjing 210098, China [2]Key laboratory of Ministry of Education for Geomechanics and Embankment Engineering, Hohai University, Nanjing 210098, China [3]TongTu Technology, Ltd. Co., Beijing 100080, China
Abstract:The assembly coastal hfilding technique initiated at home and abroad,is for a novel vertical standing harbor structure.Its main concept is the assembling components which can be combined and locked together to form a large caisson.Its application and future are discussed for a building.After many years of application and tests,the technique has a high stability,a wide range of application,low workload and fast construction speed.It can be widely applied in future for harbor engineering projects.
Keywords:Assembly techniques  frame structure  open-ended caisson  port engineering
本文献已被 CNKI 维普 万方数据 等数据库收录!
点击此处可从《中国海洋工程》浏览原始摘要信息
点击此处可从《中国海洋工程》下载免费的PDF全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号