Monitoring the performance of rock reinforcement |
| |
Authors: | E Villaescusa CJ Schubert |
| |
Institution: | (1) Mining Geomechanics, Western Australian School of Mines, PMB 22, Kalgoorlie, WA, 6430, Australia;(2) McArthur River Mining Pty Ltd, PO Box 36821, Winnellie, NT, 0821, Australia |
| |
Abstract: | A rock mechanics program has been developed and implemented in order to achieve a safe and economical room and pillar extraction of the shallow dipping orebodies at the McArthur River Mine in Australia. Three closely spaced tabular orebodies have been targeted for extraction over the life of the mine and due to economics the lowermost number 2 orebody is being mined first. This paper formulates the calculation of the 2 Orebody hangingwall spans and the appropriate rock reinforcement design for the long-term stability of the room and pillar excavations. The field trials suggested that a rock beam was formed within the hangingwall of the room and pillar operations, arresting any vertical movement of the roof. The results indicated that the weight of the beam is transferred to the pillars via an arching process and there is no need for deep-anchored reinforcement. |
| |
Keywords: | underground mining reinforcement monitoring cablebolting room and pillar |
本文献已被 SpringerLink 等数据库收录! |
|