首页 | 本学科首页   官方微博 | 高级检索  
     检索      

软弱厚煤层沿空留巷变形破坏特征及控制研究
引用本文:王凯,杨宝贵,王鹏宇,李冲.软弱厚煤层沿空留巷变形破坏特征及控制研究[J].岩土力学,2022,43(7):1913-1924.
作者姓名:王凯  杨宝贵  王鹏宇  李冲
作者单位:1. 中国矿业大学(北京) 能源与矿业学院,北京 100083;2. 山西潞安矿业(集团)有限责任公司 古城煤矿,山西 长治 046100; 3. 中国矿业大学 矿业工程学院,江苏 徐州 221116
基金项目:国家自然科学基金项目(No.51874277)~~;
摘    要:针对软弱厚煤层综放开采沿空留巷动压显现明显,顶板易出现不均匀切顶下沉等问题。通过现场调研、理论分析和数值模拟,阐明了软弱厚煤层综放开采沿空留巷动压显现特征和变形机制,提出了软弱厚煤层沿煤层顶板布置沿空留巷变形协同支护体系。研究结果表明:综放开采采出厚度大,沿煤层底板留巷时沿空留巷煤层顶板承载能力差,“底板?巷旁支护体?顶板”支护体系载能力不协调,是造成软弱厚煤层沿空留巷产生大变形的主要原因;沿煤层顶板留巷变形协同支护体系的提出提高了沿空留巷帮部、顶底板及巷旁支护体的协同承载能力,可有效地保证软弱厚煤层沿空留巷的围岩稳定。研究成果在古城煤矿的成功应用,证明了该支护体系在软弱厚煤层综放沿空留巷中的可行性。

关 键 词:软弱厚煤层  沿空留巷  巷旁支护  协同变形  
收稿时间:2021-10-15
修稿时间:2022-04-26

Deformation and failure characteristics of gob-side entry retaining in soft and thick coal seam and the control technology
WANG Kai,YANG Bao-gui,WANG Peng-yu,LI Chong.Deformation and failure characteristics of gob-side entry retaining in soft and thick coal seam and the control technology[J].Rock and Soil Mechanics,2022,43(7):1913-1924.
Authors:WANG Kai  YANG Bao-gui  WANG Peng-yu  LI Chong
Institution:1. School of Energy and Mining Engineering, China University of Mining and Technology (Beijing), Beijing 100083, China; 2. Gu-cheng Coal Mine of Shanxi Lu’an Mining Group, Changzhi, Shanxi 046100, China; 3. School of Mines, China University of Mining and Technology, Xuzhou, Jiangsu 221116, China
Abstract:In order to solve the problems of the obvious dynamic pressure, roof cutting subsidence and large deformation of the gob-side entry retaining in soft and thick coal seam fully-mechanized top-coal caving mining. The dynamic pressure characteristics and deformation mechanism of gob-side entry retaining are clarified, through field investigation, theoretical analysis and numerical simulation. A deformation coordinated support system of gob-side entry retaining arranged along the roof of soft and thick coal seam is proposed. The results show that the mining thickness of fully-mechanized top-coal caving mining is large, when retaining the gob-side entry along the coal seam floor, the bearing capacity of the coal roof is poor and the bearing capacity between the floor, gob-side entry filling body and roof support system is uncoordinated, which are the main reasons for the obvious dynamic pressure and large deformation of the gob-side entry retaining in the soft and thick coal seam. The proposal of the deformation coordinated support system in gob-side entry retaining along coal seam roof improves the coordinated bearing capacity of the coal wall, roof, floor and gob-side entry filling body, which can effectively ensure the stability of surrounding rock in the soft and thick coal seam gob-side entry retaining. The successful application of the research results to Gu-cheng Coal Mine proves the feasibility of the support system in soft and thick coal seam fully-mechanized coal caving mining gob-side entry retaining.
Keywords:soft and thick coal seam  gob-side entry retaining  roadway side support  coordinated deformation  
点击此处可从《岩土力学》浏览原始摘要信息
点击此处可从《岩土力学》下载免费的PDF全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号