Jointing of two tunnel shields using artificial underground freezing
Authors:Tsutomu Takashi  Shiro Kiriyama  Tetsuji Kato
Institution:

aSeiken Co., Ltd., Osaka (Japan)

Abstract:Freezing was used in the jointing section of two shields (diameter 3.14 m) which ran across at right angles and at 25-m depth under the crossing of main roads for the construction of a 2.4-m diameter sewer tunnel. The object of freezing was to create a frozen barrier to prevent the inflow of water and fine sand into the area to be excavated.

Thirty-five freeze pipes (length about 7 m) were placed from one shield conically in the direction of the flank of another shield with freeze pipes attached to its inside wall. The cooling unit was placed on unoccupied land at about 60 m distant from the jointing section and the freeze pipes were connected with the cooling unit by supply and return pipelines.

The cooling unit had a cooling capacity of 79,000 kcal/h at an evaporation temperature of −27°C and a condensation temperature of +40°C. Freezing was continued for 180 days and the CaCl2 brine temperature was −25 to −30°C. These works were accomplished without the sinking of shaft and the use of injection, in complete safety with no traffic restriction on the road surface.

Keywords:
本文献已被 ScienceDirect 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号