首页 | 本学科首页   官方微博 | 高级检索  
     检索      


A mathematical programming approach for scheduling equipment in a surface coal mining operation
Authors:Gerrit V R Goodman  Subhash C Sarin
Institution:(1) Department of Mining Engineering, Virginia Polytechnic Institute and State University, 24061 Blacksburg, VA, USA;(2) Department of Industrial Engineering and Operations Research, Virginia Polytechnic Institute and State University, 24061 Blacksburg, VA, USA
Abstract:Summary A mathematical programming model for scheduling open pit mining was developed and validated using data from a surface mining operation. A two-phase solution procedure was used involving repeated evaluations of an integer scheduling model and a simple transportation model.
Keywords:Coal mining  surface mining  model simulation  equipment scheduling
本文献已被 SpringerLink 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号