首页 | 本学科首页   官方微博 | 高级检索  
     检索      


Penalty function-based method for obtaining a reliability indicator of gravity dam stability
Institution:1. School of Electrical Engineering and Computer Science, University of Newcastle, Australia;2. School iof Automation, Beijing Institute of Technology;3. Division of Automatic Control, Department of Electrical Engineering, Linkoping University, Sweden;4. Delft Center for Systems and Control, Delft University, Delft 2628CD, Netherlands;1. School of Resources and Environmental Engineering, Hefei University of Technology, Hefei 230009, China;2. Glenn Department of Civil Engineering, Clemson University, Clemson, SC 29634, United States;3. Department of Civil and Environmental Engineering, Clarkson University, Potsdam, NY 13699, United States
Abstract:In this paper, a penalty function method for solving non-linear optimization problems was introduced to obtain a reliability indicator and to calibrate the partial factors, avoiding the complexity associated with the calibration process of the partial factors and maintaining the accuracy of the reliability indicator. The proposed method was employed to calibrate the partial factors of gravity dam sliding stability analysis. The results indicate that using the penalty function-based calculation method to determine the reliability indicator not only ensures correctness and accuracy but also makes the calibration process of partial factors simple and easy to perform.
Keywords:Partial factor  Reliability indicator  Penalty function  Rationality
本文献已被 ScienceDirect 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号