首页 | 本学科首页   官方微博 | 高级检索  
     检索      

Experimental Study Optimizing Hole Cleaning-Cuttings Transport in Oil Drilling Engineering
作者姓名:IbrahimAA  MusaTA
作者单位:[1]EngineeringFaculty,ChinaUniversityofGeosciences,Wuhan430074 [2]FacultyofEarthResources,ChinaUniversityofGeosciences,Wuhan430074
摘    要:With a clear understanding of the drilling fluid techniques and the cutting-taking mechanism, a new advanced model is set up for analyzing field data and quantitative forecast of cutting-taking mechanism. Therefore, a number of values affecting the drilling rate and the hole cleaning are studied over a wide range of parameters. Drilling data obtained under high-borehole-pressure conditions are analyzed to determine the causes of the reduction in rate of penetration (ROP) as the borehole pressure increases, which in some cases is caused by the buildup of rock debris under the bit. The theoretical achievement and testing conclusions can be very instructional for horizontal well drilling. Much higher annular velocities are required for effective hole cleaning in directional wells than in vertical wells. Highviscosity muds are observed to provide better transport than low-viscosity muds.

关 键 词:油气运移  数据分析  预测  工程学  离心率  流动性  粘性  速率

Experimental Study Optimizing Hole Cleaning-Cuttings Transport in Oil Drilling Engineering
IbrahimAA MusaTA.Experimental Study Optimizing Hole Cleaning-Cuttings Transport in Oil Drilling Engineering[J].Journal of China University of Geosciences,2003,14(2):182-189.
Authors:Ibrahim A A  Musa T A
Abstract:With a clear understanding of the drilling fluid techniques and the cutting taking mechanism, a new advanced model is set up for analyzing field data and quantitative forecast of cutting taking mechanism. Therefore, a number of values affecting the drilling rate and the hole cleaning are studied over a wide range of parameters. Drilling data obtained under high borehole pressure conditions are analyzed to determine the causes of the reduction in rate of penetration (ROP) as the borehole pressure increases, which in some cases is caused by the buildup of rock debris under the bit. The theoretical achievement and testing conclusions can be very instructional for horizontal well drilling. Much higher annular velocities are required for effective hole cleaning in directional wells than in vertical wells. High viscosity muds are observed to provide better transport than low viscosity muds.
Keywords:cuttings transport  hole inclination  eccentricity  fluid viscosity  transport velocity  
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号