首页 | 本学科首页   官方微博 | 高级检索  
     检索      

雪峰山公路隧道的超前预测预报研究
引用本文:马亢,徐进,张志龙,王兰生,李朝政.雪峰山公路隧道的超前预测预报研究[J].岩土力学,2009,30(5):1381-1386.
作者姓名:马亢  徐进  张志龙  王兰生  李朝政
作者单位:1.四川大学 水利水电学院 水力学与山区河流开发与保护国家重点实验室,成都 610065;2.成都理工大学 工程地质研究所,成都 610059
基金项目:交通部西部交通建设科技项目,国家重点基础研究发展规划(973计划),国家自然科学基金重点项目 
摘    要:雪峰山隧道为上海-瑞丽国道主干线湖南省邵阳-怀化高速公路上最大的控制性工程,全长约7 km,最大埋深约850 m,为典型的越岭长大公路隧道。采用不同方法,对该隧道的断层破碎带、塌方、岩爆及大变形等地质灾害和围岩稳定性问题进行了超前预测预报研究。研究以地质分析为基础,运用了TSP、地质雷达、赤平投影和关键块体检索法、断层错动机制解、室内岩石力学试验、数值模拟以及隧道内地质观测分析等方法对前方各类地质信息开展超前预报,取得了较好的效果,并成功地预测预报了断层F2的出现及无强烈岩爆灾害的可能性,对安全施工提供了保证,可为今后类似工程借鉴。

关 键 词:公路隧道  预测预报  地质灾害  围岩稳定性  安全施工  
收稿时间:2007-10-09

Research on advanced prediction and forecast of Xuefeng Mountain Highway tunnel
MA Kang,XU Jin,ZHANG Zhi-long,WANG Lan-sheng,LI Chao-zheng.Research on advanced prediction and forecast of Xuefeng Mountain Highway tunnel[J].Rock and Soil Mechanics,2009,30(5):1381-1386.
Authors:MA Kang  XU Jin  ZHANG Zhi-long  WANG Lan-sheng  LI Chao-zheng
Institution:1. School of Water Resource and Hydropower, Sichuan University, State Key Lab of Hydraulics and mMountain River Eng., Chengdu 610065, China; 2. Inst. of Eng., Geology Chengdu University of Technology, Chengdu 610059, China
Abstract:The Xuefeng Mountain tunnel is the largest controlling project of Shaoyang-Huaihua Expressway in Hunan Province which belongs to the Shanghai-Ruili National Key Highway. The length of the tunnel is about 7 km and the largest thickness of its overlay is about 850 m. It is a typical thru-mountain long highway tunnel. Several different methods were used to predict the geologic disaster and stability problems of the tunnel,such as fault, rockburst, large deformation of surrounding rock, etc. Based on geological analysis, methods such as TSP, geologic radar, projection and key block search method, mechanism of fault movement, testing of surrounding rock stress, etc. were applied to forecast the geologic information in tunnel facing frontage; and good effect was achieved; especially the successful prediction and forecast of F2 appearance and zero possibility of strong rockburst. This provided guarantee for the tunnel safety construction,and a good example for other similar projects.
Keywords:highway tunnel  prediction and forecast  geologic hazard  stability of surrounding rock  construction safety
本文献已被 维普 万方数据 等数据库收录!
点击此处可从《岩土力学》浏览原始摘要信息
点击此处可从《岩土力学》下载免费的PDF全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号