首页 | 本学科首页   官方微博 | 高级检索  
     检索      

黄河下游标准化堤防纵向裂缝成因与防治
引用本文:沈细中,张慧,杨文丽.黄河下游标准化堤防纵向裂缝成因与防治[J].岩土力学,2008,29(4):973-978.
作者姓名:沈细中  张慧  杨文丽
作者单位:1. 黄河水利委员会,黄河水利科学研究院,郑州,450003;中国科学院,武汉岩土力学研究所,武汉,430071
2. 长江科学院,河流研究所,武汉,430010
3. 黄河水利委员会,黄河水利科学研究院,郑州,450003
基金项目:科技部社会公益研究项目
摘    要:因放淤固堤导致河南、山东堤防多处出现纵向裂缝,严重影响了黄河下游标准化堤防工程建设的质量与进度。通过开展现场调研与室内试验,基于饱和-非饱和渗流-应力耦合及湿化变形理论,探讨黄河大堤纵向裂缝的形成原因,据此制定相应的预防与治理对策。研究表明,淤背施工过快是导致大堤开裂的根本原因,堤身湿化变形、淤区排水不畅、堤顶堆载、堤顶重载车辆作用等加剧了堤身裂缝的形成与扩展;控制淤背施工速率、加速淤区排水、避免堤顶堆载等是预防裂缝的有效措施;锥探灌浆、开挖回填等方法可用于治理裂缝。

关 键 词:黄河堤防  纵向裂缝  放淤固堤  渗流-应力耦合  防治对策
文章编号:1000-7598-(2008)04-973-06
收稿时间:2006-03-29
修稿时间:2006年3月29日

Causes of longitudinal cracks of standardized dikes for Lower Yellow River and their prevention and curing
SHEN Xi-zhong,ZHANG Hui,YANG Wen-li.Causes of longitudinal cracks of standardized dikes for Lower Yellow River and their prevention and curing[J].Rock and Soil Mechanics,2008,29(4):973-978.
Authors:SHEN Xi-zhong  ZHANG Hui  YANG Wen-li
Institution:1. Yellow River Institute of Hydraulic Research, Yellow River Conservancy Commission, Zhengzhou 450003, China; 2. Institute of Rock and Soil Mechanics, Chinese Academy of Sciences, Wuhan 430071, China; 3. River Institute, Yangtze River Scientific Research Institute, Wuhan 430010, China
Abstract:For the Yellow River dikes which are reinforced by desilting, the longitudinal cracks appeared in the standardized dikes in Henan and Shandong provinces in Lower Yellow River; it would effect quality and schedule of project badly. Through in-situ search, indoor experiments and theoretical studies such as saturated-unsaturated seepage-stress coupling, soak deformation, the cracking causes are analyzed; and relevant methods of prevention and curing are carried out. The results show that the construction in high speed is the basic cause of cracks of dikes; and soak deformation of dike, bad drainage of desilting section, stacking load at the tip of dike, impact of vehicle lead to form and develop of cracks. Therefore, the cracks of dikes can be prevented by controlling construction speed of desilting, draining quickly at desilting section, avoiding to stacking load at the tip of dike and so on. Moreover, cracks can be settled with core grouting, cutting and backfilling and so on.
Keywords:dike of Yellow River  longitudinal cracking  reinforced dike by desilting  seepage-stress coupling  methods of prevention and curing
本文献已被 维普 万方数据 等数据库收录!
点击此处可从《岩土力学》浏览原始摘要信息
点击此处可从《岩土力学》下载免费的PDF全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号