首页 | 本学科首页   官方微博 | 高级检索  
     检索      

市政工程中的高程控制解决方案
引用本文:刘韶军,易致礼.市政工程中的高程控制解决方案[J].北京测绘,2010(2):61-62.
作者姓名:刘韶军  易致礼
作者单位:北京市测绘设计研究院,北京,100038;北京市测绘设计研究院,北京,100038
摘    要:由于市政道路从规划设计到施工建设,包括初测,线路调整,补充测量,定测等多个阶段,时间跨度往往较长,由于途经区域的不均匀沉降,给线路设计带来了许多问题。本文结合广渠路市政工程中遇到的问题,依据沉降网成果,为同类工程提供可供参考的解决方案。

关 键 词:市政工程  沉降  高程

THE ELEVATION CONTROL PLAN FOR THE MUNICIPAL ENGINEERING OF GUANGQU ROAD
Liu Shao-jun,Yi Zhi-li.THE ELEVATION CONTROL PLAN FOR THE MUNICIPAL ENGINEERING OF GUANGQU ROAD[J].Beijing Surveying and Mapping,2010(2):61-62.
Authors:Liu Shao-jun  Yi Zhi-li
Institution:Liu Shao-jun,Yi Zhi-li(Beijing Institute of Survey and Mapping,Beijing,100038,China)
Abstract:The municipal road survey includes many phases such as preliminary survey,line adjustment,additional survey and location survey.The lasting time span and differential settlement bring many problems to line design.This article discusses the problems we meet during Guangqu road municipal engineering survey.Based on the settlement network achievements,the article puts forward solutions for similar engineering for further reference.
Keywords:the municipal engineering  settle  elevation  
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号