锦屏一级电站尾水调压室大角度上仰孔锚索施工
引用本文:黄辉.锦屏一级电站尾水调压室大角度上仰孔锚索施工[J].探矿工程,2009,36(2):55-58.
作者姓名:黄辉
作者单位:四川准达岩土工程有限责任公司,四川成都610072
摘    要:锦屏一级水电站地下厂房尾水调压室顶拱发育有f14、f18断层及煌斑岩脉,开挖后出露断层及其影响带岩体破碎,风化强烈,围岩不稳定,为了洞室稳定及施工安全,设计采用预应力锚索进行加强支护。介绍了尾水调压室大角度上仰孔锚索的施工方法。

关 键 词:大角度上仰孔  预应力锚索  施工方法  尾水调压室  锦屏一级电站
收稿时间:2008/7/14 0:00:00

Construction of Anchor Cable with Large-angle Upward Hole in Tailrace Surge Tank of JinpingI Hydropower Station
HUANG Hui.Construction of Anchor Cable with Large-angle Upward Hole in Tailrace Surge Tank of JinpingI Hydropower Station[J].Exploration Engineering(Drilling & Tunneling),2009,36(2):55-58.
Authors:HUANG Hui
Institution:HUANG Hui (Sichuan Zhunda Geo-engineering Co. , Ltd. , Chengdu Sichuan 610072, China)
Abstract:f14, f18 fault and lamprophyre veins are developed in the top arch of tailrace surge tank in underground power- house of Jinping I hydropower station, the fault and the influence line was exposed after excavation with broken rock, strong weathering and instable surrounding rock. Pre-stressed anchor cable was designed to strengthen the support for cavity stabil- ity and construction safety. The paperrnainly introduced the construction method for anchor cable with large-angle upward hole in tailrace surge tank.
Keywords:large-angle upward hole  pre-stressed anchor cable  construction method  tailrace surge tank  JinpingI hydro- power station