首页 | 本学科首页   官方微博 | 高级检索  
     检索      

晋城矿区王台铺煤矿采空区积水防治探讨
引用本文:王元隆.晋城矿区王台铺煤矿采空区积水防治探讨[J].中国煤炭地质,2012(2):33-36.
作者姓名:王元隆
作者单位:山西省晋煤集团资源环境管理局,山西晋城048006
摘    要:晋城矿区王台铺煤矿经过多年的开采,上煤组(3#煤)资源枯竭,目前开采下组煤(9#煤和15#煤),面临着上组煤采空区积水的威胁。运用地质资料和瞬变电磁法对该矿九五盘区上部采空区积水进行了预测。井下的泄水孔排水量证实,运用地质分析法预测的水量偏大,瞬变电磁法的水量偏小,但总体误差不大。本次泄水的成功,可解放9*煤层145万t的可采储量,确保矿井采掘衔接的正常,同时也可从根本上杜绝了矿井突水事故的发生。

关 键 词:采空区积水  预测  瞬变电磁法  防治  泄水  王台铺煤矿

Probe into Gob Area Ponding Control in Wangtaipu Coalmine, Jincheng Mining Area
Wang Yuanlong.Probe into Gob Area Ponding Control in Wangtaipu Coalmine, Jincheng Mining Area[J].Coal Geology of China,2012(2):33-36.
Authors:Wang Yuanlong
Institution:Wang Yuanlong (Resource and Environment Administration, Shanxi Jincheng Anthracite Mining Group, Jincheng, Shanxi 048006)
Abstract:After years of mining, the resources of upper coal group (coal seam No.3) have been exhausted in the Wangtaipu coalmine, Jincheng mining area. Currently mining lower coal group (coal seams Nos.9 and 15) are confronted with threat from upper coal group gob area ponded water. Using geological data and transient electromagnetic methods carried out prediction of ponded water in area above gob of the fifth panel of No.9 coal. The discharge of underground drainage opening has been confirmed that the predicted amount of water from geological analysis is on the high side, while from transient electromagnetic method on the low side, but not large in overall error. The successful water drainage can unbind 1.45 million tons of No.9 coal seam mineable reserves. That can ensure proper link up of mine winnings and openings and put an end to happen of water bursting.
Keywords:gob area ponding  prediction  transient electromagnetic method  control  drainage  Wangtaipu coalmine
本文献已被 维普 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号