首页 | 本学科首页   官方微博 | 高级检索  
     检索      

射阳港潮汐与乘潮进港
引用本文:刘加模,栾加友.射阳港潮汐与乘潮进港[J].海岸工程,2000,19(1):54-58.
作者姓名:刘加模  栾加友
作者单位:[1]盐城市射阳港建设指挥部 [2]江苏省射阳县港务管理局
摘    要:根据实测和航行实践分析比较发现,射阳港潮汐同潮汐预报表有一定偏 ,实际高潮 比预报值高,实际低潮位比预报值低,遍地比预报要早,低潮时比预报要迟。本文研究了这一变化规律,对确定科学的乘潮进港时间及港口规划、运营有指导意义。

关 键 词:射阳港  潮汐  预报  实测  乘潮进港  苏北沿海

TIDE AND ENTER PORT OF TIDAL BOAT OF SHEYANG HARBOR
LIU Jia mo ,LUAN Jia you.TIDE AND ENTER PORT OF TIDAL BOAT OF SHEYANG HARBOR[J].Coastal Engineering,2000,19(1):54-58.
Authors:LIU Jia mo  LUAN Jia you
Institution:LIU Jia mo 1,LUAN Jia you 2
Abstract:According to real survey and practice of navigation, the deviation between real tide and tide prediction of Sheyang Harbor is found. In this paper, the relation of real tide and tide pvediction, and how to enter port for boats are studied, which have important meaning for directting production and construction of the harbor.
Keywords:Sheyang Port  tide  prediction  real survey  enter port while high tide
本文献已被 CNKI 维普 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号