动态规划法在管道修复与更新中的应用 |
| |
引用本文: | 赵云川.动态规划法在管道修复与更新中的应用[J].岩土钻凿工程,2010(1):102-103. |
| |
作者姓名: | 赵云川 |
| |
作者单位: | 中国水电顾问集团昆明勘测设计研究院科学研究分院,云南省昆明 |
| |
摘 要: | 管道工程的全寿命管理中最重要的环节是管道运营期的控制管理;针对管道运营期的修复、更新成本的动态规划控制管理,采用决策分析,提出最优线路原则;采用动态规划法来控制管道的运营成本,从而提高管道成本效率最大化。
|
关 键 词: | 动态规划 决策分析 最优线路 |
Dynamic Programming Law Used in the Pipeline Repair and Renewal |
| |
Authors: | Zhao Yunchuan |
| |
Institution: | Zhao Yunchuan (Kunming Reconnaissance Design Academe of China Water & Electricity Consultant Group 院, Yunnan Kunming) |
| |
Abstract: | In the life-cycle management of the pipe engineering the most important part is the operation-period control management; this Article mainly discusses the operation-period repair, the renewal cost dynamic programming control management, uses the decision analysis, proposes the most superior line principle, uses the dynamic programming law to control the operation-period cost, to enhance the pipeline cost efficiency maximization. |
| |
Keywords: | Dynamic Programming Decision Analysis Most Superior Line |
本文献已被 维普 等数据库收录! |