首页 | 本学科首页   官方微博 | 高级检索  
     检索      

不同布缆方式锚碇沉管管段运动的数值模拟
引用本文:杨璨,王永学,左卫广.不同布缆方式锚碇沉管管段运动的数值模拟[J].海洋工程,2014,32(1):32-40.
作者姓名:杨璨  王永学  左卫广
作者单位:大连理工大学海岸与近海工程国家重点实验室;
基金项目:国家自然科学基金资助项目(11272079);国家自然科学创新研究群体基金资助项目(59021001)
摘    要:通过建立波浪作用下锚碇沉管管段运动的时域数值计算模型,对锚碇沉管的运动响应及锚碇缆受力特性进行了研究。应用集中质量法求解锚碇缆力,应用四阶Runge-Kutta法求解管段时域运动方程,计算了在不同沉深、不同周期、不同波高和不同波向条件下沉管管段的运动幅值和锚碇缆力。数值计算的结果表明:锚碇沉管的锚碇缆对沉管管段的运动起到一定的约束作用,在沉放深度较浅、波浪周期较大时,锚碇缆对沉管管段运动幅度的制约更为明显。通过五种布缆方式的计算与分析,探讨了布缆方式对沉管管段运动响应及锚碇缆受力的影响,并给出了较为合理的布缆方案。

关 键 词:沉管隧道  运动响应  集中质量法  布缆方式

Numerical simulations on the motion of immerged tunnel element with different arrangement types of mooring lines
YANG Can,WANG Yong-xue and ZUO Wei-guang.Numerical simulations on the motion of immerged tunnel element with different arrangement types of mooring lines[J].Ocean Engineering,2014,32(1):32-40.
Authors:YANG Can  WANG Yong-xue and ZUO Wei-guang
Institution:State Key Laboratory of Coastal and Offshore Engineering, Dalian University of Technology, Dalian 116024, China;State Key Laboratory of Coastal and Offshore Engineering, Dalian University of Technology, Dalian 116024, China;State Key Laboratory of Coastal and Offshore Engineering, Dalian University of Technology, Dalian 116024, China
Abstract:The motion response and mooring line tensions of the tunnel element with mooring lines are studied by the time-domain numerical model. The time-domain motion equations of immerged tunnel element are solved by the fourth order Runger-Kutta method and the mooring line tensions are solved on the basis of the lumped-mass method. The motion responses and mooring line tensions of the immerged tunnel element are computed under different wave directions, wave heights, wave periods and immerged depths. The numerical results indicate that the mooring lines have certain effects to reduce the motions of the immerged tunnel, especially under the condition of lower immerged depth and a long period wave. The effects of mooring line arrangements on the motions are discussed and the better mooring line arrangements are given in the paper.
Keywords:immersed tunnel  motion response  lumped-mass method  arrangement types of mooring lines
本文献已被 CNKI 等数据库收录!
点击此处可从《海洋工程》浏览原始摘要信息
点击此处可从《海洋工程》下载免费的PDF全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号