荒沟蓄能电站地下厂房地应力状态与工程稳定性研究
引用本文:吴满路,廖椿庭,袁嘉音.荒沟蓄能电站地下厂房地应力状态与工程稳定性研究[J].地球学报,2002,23(3):263-268.
作者姓名:吴满路  廖椿庭  袁嘉音
作者单位:中国地质科学院地质力学所,北京100081;中国地质科学院地质力学所,北京100081;中国地质科学院地质力学所,北京100081
摘    要:为了解黑龙江荒沟抽水蓄能电站地下厂房区应力状态 ,在探洞内布置了 4个地应力测点 ,利用空芯包体应力计进行地应力测量。测量结果表明 :最大主应力近于水平 ,最大主应力量值为 9.6MPa ,最大主应力方向为N78°W。根据实测结果对该区应力作用特征进行了分析 ,测量结果与现今区域构造应力场相吻合。在地应力实测和岩石力学性质试验基础上 ,对地下厂房周边应力状态进行了有限元分析 ,为地下厂房轴线的选择提出了建设性意见。

关 键 词:地应力测量    空芯包体应力计    应力状态    有限元分析

A Study of Stress State and Engineering Stability of Underground Houses at the Huanggou Accumulation Power Station
WU Man-lu,LIAO Chun-ting and YUAN Jia-yin.A Study of Stress State and Engineering Stability of Underground Houses at the Huanggou Accumulation Power Station[J].Acta Geoscientia Sinica,2002,23(3):263-268.
Authors:WU Man-lu  LIAO Chun-ting and YUAN Jia-yin
Institution:Institute of Geomechanics, Chinese Academy of Geological Sciences, Beijing 100081;Institute of Geomechanics, Chinese Academy of Geological Sciences, Beijing 100081;Institute of Geomechanics, Chinese Academy of Geological Sciences, Beijing 100081
Abstract:In order to detect stress state of underground houses at Huanggou accumulation power station in Heilongjiang Province, the authors made stress measurement by means of hollow inclusion gauge method. The results indicate that the maximum principal stress is nearly horizontal, trending N78°W with value of 9.6 MPa. The measurement is consistent with the present regional tectonic stress field. On the basis of stress measurement, rock mechanical testing and finite element calculation, an optimum direction of the long axis of underground houses is suggested from an overall consideration of the measured direction of maximum principal stress, enginee ring geology and construction facilities.
Keywords:stress measurement  hollow inclusion gauge  stress state  finite element analysis