首页 | 本学科首页   官方微博 | 高级检索  
     检索      

VERIFICATION TEST OF THE PHYSICAL MODEL IN WUHAN FOR THE GEZHOUBA DAM REGION WITH RESPECT TO ITS FIRST STAGE CONSTRUCTION IN OPERATION ── A SUMMARY REPORT
作者姓名:Lin  Wanquan  and  Wang  Mingna
作者单位:Vice Chief Engineer,Foreign Affairs Division Yangtze Valley Planning Office. MWREP Research Engineer,Yangtze River Scientific Research Institute
摘    要:I. INTRODUCTIONThe Gezhouba Project is located on the main stem of the Yangtze River with a total installed capacity of 2750 MW. The general layout of the project is shown in Fig. l--a. The drainage area upstream of the project is 1 million sq. km with an…

本文献已被 CNKI 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号