VERIFICATION TEST OF THE PHYSICAL MODEL IN WUHAN FOR THE GEZHOUBA DAM REGION WITH RESPECT TO ITS FIRST STAGE CONSTRUCTION IN OPERATION ── A SUMMARY REPORT |
| |
作者姓名: | Lin Wanquan and Wang Mingna |
| |
作者单位: | Vice Chief Engineer,Foreign Affairs Division Yangtze Valley Planning Office. MWREP Research Engineer,Yangtze River Scientific Research Institute |
| |
摘 要: | I. INTRODUCTIONThe Gezhouba Project is located on the main stem of the Yangtze River with a total installed capacity of 2750 MW. The general layout of the project is shown in Fig. l--a. The drainage area upstream of the project is 1 million sq. km with an…
|
本文献已被 CNKI 等数据库收录! |