Abstract: | To use the soil-nailing in the soft ground,the ground water sealing must be established,and slope must be self stabilized . A technology which setting up cement-soil mixing pile at first,and then constructing the soil nailing support is put forward. By studying the principle of the compound soil-nailed wall, the design model is proposed . The construction technology suited to the soft ground is summarized. |