首页 | 本学科首页   官方微博 | 高级检索  
     检索      

模糊评判在露天转地下矿山的矿房结构参数优化中的应用
引用本文:韩现民,李晓,杜国栋.模糊评判在露天转地下矿山的矿房结构参数优化中的应用[J].工程地质学报(英文版),2006,14(5):654-660.
作者姓名:韩现民  李晓  杜国栋
作者单位:中国科学院工程地质力学重点实验室,北京100029
基金项目:国家自然科学基金;国家重点基础研究发展计划(973计划)
摘    要:模糊评判法能较好地解决方案选择的问题。本文针对石人沟铁矿露天转地下矿山过渡期开采期间,矿山地下开采带来的露天边坡、地下采场稳定性问题,通过数值模拟,得到地下第一中段开采时地下采场和边坡的应力、应变数值,并结合矿块的采切比、矿块回采率经济指标,运用模糊数学的方法,建立了考虑经济效益的稳定性模糊评判模型。通过合理确定评价指标的隶属度函数和利用二元排序法构造判断矩阵确定各评价指标的权重,对9种方案进行了综合评判,确定了最优方案,选出了合理的矿房结构参数,既可保证矿山的安全生产,又可保证矿山经济效益。

关 键 词:露天转地下    模糊评判    结构参数优化
收稿时间:2005-12-19
修稿时间:2006-03-30

DEVELOPMENT OF FUZZY DECISION MODELS FOR DESIGN OPTIMIZATION OF STRUCTURAL PARAMETERS FOR MINING BUILDINGS WITH BOTH GROUND AND UNDERGROUND INSTABILITIES: A CASE STUDY AT AN IRON ORE MINE
HAN Xianmin,LI Xiao,DU Guodong.DEVELOPMENT OF FUZZY DECISION MODELS FOR DESIGN OPTIMIZATION OF STRUCTURAL PARAMETERS FOR MINING BUILDINGS WITH BOTH GROUND AND UNDERGROUND INSTABILITIES: A CASE STUDY AT AN IRON ORE MINE[J].Journal of Engineering Geology,2006,14(5):654-660.
Authors:HAN Xianmin  LI Xiao  DU Guodong
Institution:Key Laboratory of Engineering Geomechanics,Chinese Academy of Science,Beijing100029
Abstract:Project option assessment has been well solved by using fuzzy decision method.Fuzzy decision model considering economic benefit and stability was established aiming to solve the question about stability of open pit slope and underground stope during the transition period from open pit to underground mining,in which fuzzy mathematics was used and stress and strain of the slope and underground stope caused by digging the first section combined with economic indices of ore block stripping ratio and recovery rate were comprehensively considered.By means of scientifically determining the membership function of each factor and establishing the weight of each factor by constructing the judging matrix through binary taxis,the optimal one was selected from nine schemes made up of different combination of room structural parameters,which could ensure not only safety production but also better economic profit.
Keywords:Transition from open pit to underground  Fuzzy evaluation  Optimization of structural parameters
本文献已被 CNKI 维普 万方数据 等数据库收录!
点击此处可从《工程地质学报(英文版)》浏览原始摘要信息
点击此处可从《工程地质学报(英文版)》下载免费的PDF全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号