首页 | 本学科首页   官方微博 | 高级检索  
     检索      

静压沉桩与CPTU贯入离心模型试验及机制研究
引用本文:李镜培,操小兵,李 林,龚卫兵.静压沉桩与CPTU贯入离心模型试验及机制研究[J].岩土力学,2018,39(12):4305-4311.
作者姓名:李镜培  操小兵  李 林  龚卫兵
作者单位:1. 同济大学 岩土及地下工程教育部重点实验室,上海 200092;2. 同济大学 地下建筑与工程系,上海 200092
基金项目:国家自然科学基金项目(No.41272288)。
摘    要:为了探究静压沉桩与CPTU贯入力学机制,开展了饱和黏土中静压沉桩及CPTU贯入的离心模型试验,获得了静压沉桩与CPTU贯入过程中土压力、超孔压和贯入阻力的变化规律。同时,将静压桩和CPTU压入过程视为一系列球孔的连续贯入,应用圆孔扩张解答,建立了静压沉桩和CPTU贯入过程中锥头阻力、侧阻力与超孔压的预测方法。通过离心模型试验和理论预测结果的对比分析表明:随着桩体的压入,桩周土体的超孔压和土压力均逐渐增大,当桩头通过监测点时,超孔压与土压力均达到最大值;在饱和黏土中,CPTU锥头阻力、锥侧摩阻力和锥头超孔压与锥头贯入深度总体上呈线性关系。预测方法估算沉桩和CPTU贯入引起的土压力、超孔压与模型试验结果相符,较好地反映了饱和黏土中静压沉桩和CPTU贯入的力学机制。

关 键 词:静压桩  CPTU贯入  离心模型试验  沉桩  
收稿时间:2017-04-26

Centrifugal model test and mechanism study of jacked pile and CPTU penetration
LI Jing-pei,CAO Xiao-bing,LI Lin,GONG Wei-bing.Centrifugal model test and mechanism study of jacked pile and CPTU penetration[J].Rock and Soil Mechanics,2018,39(12):4305-4311.
Authors:LI Jing-pei  CAO Xiao-bing  LI Lin  GONG Wei-bing
Institution:1. Key Laboratory of Geotechnical and Underground Engineering of Ministry of Education, Tongji University, Shanghai 200092, China; 2. Department of Geotechnical Engineering, Tongji University, Shanghai 200092, C
Abstract:To explore the mechanisms of jacked pile and CPTU penetration, centrifugal model tests are conducted to investigate the variations of earth pressure, excess pore pressure and penetration resistance in the process of jacked pile and CPTU penetration. Meanwhile the installation process of jacked pile and CPTU is regarded as a series of continuous sphere cavity penetration. The cone resistance, the cone side resistance and the excess pore pressure are predicted based on spherical cavity expansion theory. The comparisons between centrifugal model test data and theoretical predictions show that the excess pore pressure and the soil stress around the pile increase with the increase of penetration depth. The excess pore pressure and the soil pressure reach the maximum when the pile tip arrives the measured point. The cone resistance, the cone side friction and the excess pore pressure show linear relationship with the cone penetration depth in saturated clays. The calculated results show a good agreement with the test results, which presents the mechanisms of jacked pile and CPTU penetration well.
Keywords:jacked pile  CPTU penetration  centrifugal model test  pile installation  
本文献已被 CNKI 等数据库收录!
点击此处可从《岩土力学》浏览原始摘要信息
点击此处可从《岩土力学》下载免费的PDF全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号