Monitoring of Over Cutting Area and Lubrication Distribution in a Large Slurry Pipe Jacking Operation |
| |
Authors: | Saeid Khazaei Hideki Shimada Takashi Kawai Junichi Yotsumoto Kikuo Matsui |
| |
Institution: | (1) Department of Earth Resources Engineering, Kyushu University, 6-10-1 Hakazaki, Higashi-ku, Fukuoka 812-8581, Japan;(2) Kyowa EXEO Co., Tokyo, Japan |
| |
Abstract: | Slurry pipe jacking was firmly established as a special method for the non-disruptive construction of the underground pipelines
of sewage systems. Pipe jacking, in its traditional form, has occasionally been used for short railways, roads, rivers, and
other projects. Basically the system involves the pushing or thrusting of concrete pipes into the ground by a number of jacks.
In slurry pipe jacking, during the pushing process, mud slurry and lubricant are injected into the face and the over cutting
area that is between the concrete pipes and the surrounding soil. Next, the slurry fills voids and the soil stabilizes due
to the created slurry cake around the pipes. Fillings also reduce the jacking force or thrust during operation. When the drivage
and pushing processes are finished, a mortar injection into the over cutting area is carried out in order to maintain permanent
stability of the surrounding soil and the over cutting area. Successful lubrication around the pipes is extremely important
in a large diameter slurry pipe jacking operation.
Control of lubrication and gaps between pipes and soil can prevent hazards such as surface settlement and increases in thrust.
Also, to find voids around the pipes after the jacking process, in order to inject mortar for permanent stabilizing, an investigation
around the pipes is necessary. To meet these aims, this paper is concerned with the utilization of known methods such as the
GPR (Ground Penetrating Radar) system and borehole camera to maintain control of the over cutting area and lubricant distribution
around the pipes during a site investigation. From this point of view, experiments were carried out during a tunnel construction
using one of the largest cases of slurry pipe jacking in Fujisawa city, Japan. The advantages and disadvantages of each system
were clarified during the tests. |
| |
Keywords: | borehole camera GPR system over cutting area slurry pipe jacking thrust |
本文献已被 SpringerLink 等数据库收录! |
|