首页 | 本学科首页   官方微博 | 高级检索  
     检索      


Predicting the environmental stability of treated copper smelter flue dust
Institution:1. Materials and Metallurgical Engineering Department, Sahand University of Technology, Tabriz, Islamic Republic of Iran;2. Materials and Metallurgical Engineering Department, University of Zanjan, Zanjan, Islamic Republic of Iran
Abstract:Column tests were conducted to determine the leachability of As, Cd, Cu, Fe and Pb from copper smelter flue dust that had been treated by the Cashman Process in an effort to recover metals while rendering the residue inert. Between 100 and 300 μg/l As predominantly As (V)] leached from the residue from a batch-reactor test, while between 1000 and 1400 μg/l As leached from residue from a continuous-reactor test. Electron microprobe analyses of the two materials identified scorodite (FeAsO4·2H2O) as the principal As-bearing phase. The pHs of leachate from the batch-and continuous-reactor residues were approximately 5.0 and 4.0, respectively. Cadmium and Cu leachate concentrations decreased through the tests, while Pb equilibrated at approximately 200 and 1300 μg/l for the batch and continuous residues, respectively. The measured Eh did not agree with the Eh calculated from either the As(III)/As(V) or Fe(II)/Fe(III) couple. Modeling of system chemistry using MINTEQA2 indicated that scorodite controlled the As concentration of the leachate. The variability of leachate As and metal concentrations between the batch-and continuous-reactor residues indicates that the process conditions failed to produce residues of satisfactory stability.
Keywords:
本文献已被 ScienceDirect 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号